Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 3 of 3 for “"electrical power unit"”.

  1. Design and implementation of a multi-agent optimized control system for a large-scale fossil-fuel electrical power unit.

    The problem facing the United Sates electric power industry today can be attributed to society's ever increasing demand for energy, environmental concerns with reliance on fossil fuels, and uncertainty about an aging infrastructure's ability to cope with increasing demand for energy. Existing …

    baylor Repository record for Design and implementation of a multi-agent optimized control system for a large-scale fossil-fuel electrical power unit. (opens in a new tab)

  2. Implementation of a Multi-Agent System in Java Agent Development Framework for a large-scale fossil-fuel electrical power unit control.

    … few years. Currently, large-scale fossil fuel power plants, ranging in the hundreds of MW's, produce most of the power in the United States and must do efficiently with more added regulation and more in the short term future. The control for these large-scale power plants can be complex but …

    baylor Repository record for Implementation of a Multi-Agent System in Java Agent Development Framework for a large-scale fossil-fuel electrical power unit control. (opens in a new tab)

  3. Koncepční návrh letounu s elektrickým pohonem

    Diplomová práce se zabývá návrhem koncepce nového letounu s elektrickým pohonem dle zadání firmy Evektor, spol. s r.o. V první části jsou podrobněji zpracována statistická data malých letounů s různými typy pohonů a je uvedeno jejich vzájemné srovnání. V následující části se práce soustředí na …

    brno-tech Repository record for Koncepční návrh letounu s elektrickým pohonem (opens in a new tab)