Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 42 for “"equipment construction"”.

  1. KOMUNIKACIJŲ RYŠIO IR APŠVIETIMO ATRAMŲ STIPRUMO ANALIZĖ /

    … includes review of 15 ar 8 meters height poles construction, review of additional equipment construction, review of past strenght and technical calculations, wind pressure calculations in conformity of STR 2.05.04:2003 and LST EN 1991–1-4:2005, stress and displacement investigation of 15 ar 8 …

    vilnius Repository record for KOMUNIKACIJŲ RYŠIO IR APŠVIETIMO ATRAMŲ STIPRUMO ANALIZĖ / (opens in a new tab)

  2. A TOOL FOR QUANTIFYING THE CARBON FOOTPRINT OF CONSTRUCTION PROJECTS IN THE TRANSPORTATION SECTOR

    The U.S. construction industry ranks third in the nation in its production of carbon dioxide emissions. Increasing global pressure towards developing emissions reduction strategies is bound to affect the construction industry. The objective of this thesis was to develop a tool to estimate the …

    maryland Repository record for A TOOL FOR QUANTIFYING THE CARBON FOOTPRINT OF CONSTRUCTION PROJECTS IN THE TRANSPORTATION SECTOR (opens in a new tab)

  3. Construction and Inspection Guidelines for Pavement Preservation and Cost Analysis of Chip Seal Projects

    Practical construction and inspection guidelines for selected NDOT maintenance treatments were developed. Separate documents were developed for NDOT Maintenance and Asset Management Division and Construction Division training purposes. The scope of each includes Chip Seal, Fog Seal, Crack Filling …

    unr Repository record for Construction and Inspection Guidelines for Pavement Preservation and Cost Analysis of Chip Seal Projects (opens in a new tab)

  4. A new method of re-timing digital signals

    … considerable interest to designers of telemetry equipment. Construction of the prototype regenerator constituted a major part of the project work as may be realised from the circuit diagrams involved. For this reason discussion of the principles of circuit operation is fairly comprehensive.

    unsw Repository record for A new method of re-timing digital signals (opens in a new tab)

  5. Development of a new portable instrument for in-situ activity measurement of Radionuclides in Nuclear Medicine

    … is updated and modified in Electronic Nuclear Equipment Construction (CAEN) in Italy. The 4πβ − γ coincidence counting technique is the most powerful technique for the absolute activity measurements of β − γ or EC − γ emitting radionuclides. Short half-lived radionuclides such as 11C which has …

    catania Repository record for Development of a new portable instrument for in-situ activity measurement of Radionuclides in Nuclear Medicine (opens in a new tab)

  6. Additive manufacturing using polyamide-12 /

    … to this day, due to the higher complexity of the equipment construction than comparing it to other additive manufacturing variations. Main idea behind this work is to show that this technology can be accessed at a lower cost, thus aligning with the technology democratization idea. In order to …

    vilnius Repository record for Additive manufacturing using polyamide-12 / (opens in a new tab)

  7. IMPROVING THE PERFORMANCE OF CHINESE CONSTRUCTION FIRMS ON EPC PROJECTS IN CHINA

    An engineering, procurement, and construction (EPC) project is considered to be a variant of the project delivery method of design and build. According to the EPC contract, the EPC contractor shall be responsible for project design, procurement of the necessary materials and equipment, …

    nus Repository record for IMPROVING THE PERFORMANCE OF CHINESE CONSTRUCTION FIRMS ON EPC PROJECTS IN CHINA (opens in a new tab) Download file for IMPROVING THE PERFORMANCE OF CHINESE CONSTRUCTION FIRMS ON EPC PROJECTS IN CHINA (opens in a new tab)

  8. Development of an Ultra-Lightweight Buckling-Restrained Brace Using Analytical and Numerical Methods

    … seismic retrofit without the need for heavy equipment. Construction utilizes commonly stocked materials able to be customized for required strength, drift, and geometry limitations. Analytical single degree of freedom (SDOF) and Euler buckling models are compared with published equations to …

    portland-state Repository record for Development of an Ultra-Lightweight Buckling-Restrained Brace Using Analytical and Numerical Methods (opens in a new tab)

  9. Role of potassium hydroxide in fouling and fireside corrosion processes in biomass-fired boilers

    … require high surface temperatures in the equipment construction components. This leads to increased risks of shortening the service life times of the components, when biomass based fuels are used in place of fossil fuels. The inorganic part of biomass fuels are different from fossil fuels …

    aalto Repository record for Role of potassium hydroxide in fouling and fireside corrosion processes in biomass-fired boilers (opens in a new tab)

  10. Cost estimate models for the isolation and segregation of non-GM feed

    … in cornfields and planting and harvesting equipment cleaning. The main contributing factors for costs within grain elevators and feed mills included cleaning or the need for new equipment, construction, and testing, divided by segregation method and facility capacity. This study analyzed …

    iastate Repository record for Cost estimate models for the isolation and segregation of non-GM feed (opens in a new tab)

  11. Superconducting Microwires with Extended Regular Perforation Patterns

    … will then provide a detailed description of the equipment construction and sample fabrication techniques used in the experiment. Finally, I will present my two main studies: in one project I examined the photon-detection performance of superconducting micro-wires with a multi-pinhole structure, …

    zurich

  12. Rozšíření pražského metra, trasa A: Dejvice - Motol - příprava realizace stavby

    Předmětem diplomové práce je řešení prodloužení pražského metra, trasa A: Dejvice – Motol, s konkrétním stavebním řešením technologické výstavby stavební jámy a rampy pro stanici Veleslavín. Studie se zabývá návrhem finančních, technologických a časových hledisek stavebního procesu. Podkladem pro …

    brno-tech Repository record for Rozšíření pražského metra, trasa A: Dejvice - Motol - příprava realizace stavby (opens in a new tab)

  13. Dostavba školního areálu základní školy ve Zdicích - stavebně technologická příprava stavby

    Předmětem diplomové práce je stavebně technologický projekt Dostavby školního areálu základní školy ve Zdicích. Jedná se o novostavbu. Technologický předpis je zpracován pro monolitické a zděné konstrukce.

    brno-tech Repository record for Dostavba školního areálu základní školy ve Zdicích - stavebně technologická příprava stavby (opens in a new tab)

  14. Polyfunkční dům

    Předmětem diplomové práce je vypracování projektové dokumentace pro stavební povolení polyfunkčního domu. Objekt se nachází na okraji města Nasavrky. Terén je mírně svažitý směrem k severovýchodu. V blízkosti pozemku byl proveden geologický průzkum. Základy jsou tvořeny betonovými pasy. Půdorys …

    brno-tech Repository record for Polyfunkční dům (opens in a new tab)

  15. Rekonstrukce víceúčelového zařízení - stavebně technologický projekt

    Tato diplomová práce zpracovává stavebně technologický projekt rekonstrukce Víceúčelového zařízení v obci Slavice. V práci je zpracována kompletní studie realizace včetně časového a finančního plánu. Práce také obsahuje technologický předpis pro hlavní objekt, kontrolní a zkušební plán kvality a …

    brno-tech Repository record for Rekonstrukce víceúčelového zařízení - stavebně technologický projekt (opens in a new tab)

  16. The effectiveness of alternatives to purchase in the marketing of construction equipment through distributors

    Thesis (Ph. D.)--Michigan State University of Agriculture and Applied Science. Department of Marketing and Transportation Administration, 1961

    msu Repository record for The effectiveness of alternatives to purchase in the marketing of construction equipment through distributors (opens in a new tab)

  17. Domov pro seniory ve Vsetíně, práce vnitřní a dokončovací

    Předmětem bakalářské práce je konkrétní stavební řešení technologické etapy prací vnitřních a dokončovacích montovaného železobetonového objektu domova pro seniory. Studie se zabývá návrhem finančních, technologických a časových hledisek stavebního procesu. Podkladem pro vypracování je projekt …

    brno-tech Repository record for Domov pro seniory ve Vsetíně, práce vnitřní a dokončovací (opens in a new tab)

  18. Multifunkční naklápěcí pánev

    Předmětem této diplomové práce je konstrukční návrh gastronomické multifunkční naklápěcí pánve o objemu 100 l. Model zařízení je vytvořen v programu Autodesk Inventor 2008. Návrh zařízení je podpořen analytickými výpočty a také pevnostní analýzou v programu Ansys Workbench 11.

    brno-tech Repository record for Multifunkční naklápěcí pánev (opens in a new tab)

  19. Konstrukce přípravku na obrábění těles vysokotlakých vstřikovacích čerpadel.

    Cílem této práce byla konstrukce nového přípravku na obrábění těles nových typů vstřikovacích čerpadel CP3. Na základě kritérií z hlediska ergonomie, obrábění, tvaru tělesa a nákladů byl zkonstruován přípravek, který umožní upnutí a obrobení požadovaných obráběných ploch na tělese. Konstrukce byla …

    brno-tech Repository record for Konstrukce přípravku na obrábění těles vysokotlakých vstřikovacích čerpadel. (opens in a new tab)

  20. Sloupový výložníkový jeřáb

    Tato bakalářská práce se zabývá návrhem alternativní netypické konstrukce sloupového jeřábu včetně důležitých pevnostních výpočtů dle zadaných parametrů: délka vyložení ramene 4000 mm, výška zdvihu 8500 mm, nosnost 2000 kg. Součástí práce je vypracování technické zprávy s rozborem konstrukce, …

    brno-tech Repository record for Sloupový výložníkový jeřáb (opens in a new tab)

Page 1 of 3