Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 6 of 6 for “"execution of a project"”.
-
Commercial Construction Supply Chain Management Issues Involving Traveling Contractors
… chain management (SCM) is an important aspect of running any business. To stay competitive in today's marketplace a supply chain management system must be in place to achieve success in this volatile global environment (Fewings, 2005). This research differentiates the issues between executing a …
-
Making decisions under uncertainty using Real Option Analysis
Valuing a project based on net present value does not easily capture the flexibility that the project offers and therefore undervalues and restrains that project. Real Options, based on financial option valuation, can capture this flexibility more efficiently and give the project manager the …
-
The influence of the psychological characteristics of the team members on construction project performance
The dynamic of confrontation and conflict that prevails between project team members and organizations in the construction industry can provoke some devastating consequences on project performance (Loosemore, M. 1998). Furthermore, the fragmentation of projects into different phases impacts on the …
-
Proof-of-Concept: Safety Hazard Identification and Impact Minimization Using 3D BIM and VR Devices Through the Case-Studies
… the most hazardous tasks during construction execution using 3D Building Information Modeling (BIM) and Virtual Reality (VR) devices. A safety hazards-related questionnaire for civil engineering and construction students, superintendents, safety, and project managers across six different …
-
Analýza procesu řízení projektů
Tato diplomová práce se zabývá analýzou procesu řízení projektů ve firmě Královopolská, a.s. Brno. Firma patří mezi největší české výrobce jeřábů a zdvihací techniky. Práce se zabývá analýzou vybraných projektů, odhalením slabých míst procesu řízení projektů a návrhem zlepšení.
-
De ITIL® 3 a ITIL® 4 SENA - Cuando creemos creamos
The transition from version 3 of the ITIL® reference framework to ITIL® 4 in the National Learning Service Systems Office was presented as one of the requirements of the multiple obligations that the provider of technological services for the Entity had to carry out, from November 2019 until July …