Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 20 for “"fabricator"”.

  1. A contribution to risk evaluation of fabricator/erector during production and installation of steel structures

    … and many uncertainties. More specifically, steel fabricators and erectors are faced with various decisions during the initial stages of a project. Such decisions could range from choosing a fabrication/erection scheme to design of a particular false work component. These decisions can have …

    ubc Repository record for A contribution to risk evaluation of fabricator/erector during production and installation of steel structures (opens in a new tab) Download PDF for A contribution to risk evaluation of fabricator/erector during production and installation of steel structures (opens in a new tab)

  2. A contribution to computer aided design evaluation of steel structures

    … is intended to be used either by the steel fabricator to evaluate a particular design, or by the engineering consultants to guide him to an economic solution. A structural data file containing the fabrication and erection details of the structure is setup and a program is written to …

    ubc Repository record for A contribution to computer aided design evaluation of steel structures (opens in a new tab) Download PDF for A contribution to computer aided design evaluation of steel structures (opens in a new tab)

  3. River City Millwork Company

    … not been good to this company, a distributor and fabricator of windows, doors and related millwork items. (See Exhibit A). The firm, during this period, had suffered from market price competition, various inventory problems, inefficient shop operations, and questionable purchasing strategies.

    creighton Repository record for River City Millwork Company (opens in a new tab)

  4. Feasting on Four Wheels

    … Interviews with food truck owners, a food truck fabricator and a blogger for DenverStreetFood.com, explore the nature of the movement and how its existence creates a feel of community and culture within the city. The evolution of street food history and the influence of new technology are also …

    denver Repository record for Feasting on Four Wheels (opens in a new tab)

  5. The potential of integrated project delivery in greening the structural steel delivery process

    … ensure early involvement of the erector and fabricator in the steel design phase, and utilize appropriate technology.

    colostate Repository record for The potential of integrated project delivery in greening the structural steel delivery process (opens in a new tab)

  6. Energy use and emissions reduction strategies for structural steel fabricators: a case study

    … construction methods and materials. Steel fabricators working to operate more sustainably require detailed energy and environmental analysis of operational practices in order to make informed improvements. Yet only limited research exists on the energy use and emissions associated with …

    colostate Repository record for Energy use and emissions reduction strategies for structural steel fabricators: a case study (opens in a new tab)

  7. Life and Death in the Field: Farmer Suicide and the Necessity to Feed

    … connect the conditionality of homo faber (human fabricator/maker), animal laborans (laboring animal), and vita activa (active life) with farmer struggle and suicide. Through the work of Georges Canguilhem and Achille Mbembe, I critique and analyze the predominant discourse and framing of suicide …

    unt Repository record for Life and Death in the Field: Farmer Suicide and the Necessity to Feed (opens in a new tab)

  8. Integrated production planning and control model for engineer-to-order prefabricated building systems

    … research is part of a partnership with a steel fabricator company (Company A) that was interested in improving its production planning system. The research method is grounded in the design science research, in which there is an effort from the researcher to develop an artefact as an output of …

    brazil-ufrgs Repository record for Integrated production planning and control model for engineer-to-order prefabricated building systems (opens in a new tab)

  9. Welding information system : design, operations, methods

    … widening gap between the design engineer and the fabricator. In the most general sense, the primary objective of the WISDOM project was to produce an integrated self-paced teaching tool for both engineering professional and student alike. The versatility of the system is maintained by presenting …

    ubc Repository record for Welding information system : design, operations, methods (opens in a new tab) Download PDF for Welding information system : design, operations, methods (opens in a new tab)

  10. Understanding the context for the implementation of Building Information Modelling in engineer-to-order prefabricated building systems

    … of empirical studies were conducted in a Steel Fabricator company from Brazil. Those studies enabled the identification of challenges at project and organizational level by showing that product information contained in BIM models could be reused downstream in the value chain for different …

    brazil-ufrgs Repository record for Understanding the context for the implementation of Building Information Modelling in engineer-to-order prefabricated building systems (opens in a new tab)

  11. Experimental Investigation of Reinforced Concrete Beams with Lapped Reinforcement

    … ensure quality from an on-site precast concrete fabricator and also to reduce construction time. This thesis focuses on the research involved in the interface connections of these DBTs. Eight specimens of reinforced concrete with two connection details at the center span of the beam were tested, …

    ut-knoxville Repository record for Experimental Investigation of Reinforced Concrete Beams with Lapped Reinforcement (opens in a new tab)

  12. Part 1: Operational characteristics of a low temperature adiabatic calorimeter at the University of Tennessee. Part 2: Contributions to the heat capacity of solid Molybdenum (20-2890 K.)

    … These are compared to the data obtained by the fabricator of the equipment, Dr. Y. Higashigaki.</p> <p>Part 2 of the thesis deals with the heat capacity of solid Molybdenum in the temperature range 20 - 2890 K. Heat capacity data for Mo in this range have been taken from the literature and a …

    ut-knoxville Repository record for Part 1: Operational characteristics of a low temperature adiabatic calorimeter at the University of Tennessee. Part 2: Contributions to the heat capacity of solid Molybdenum (20-2890 K.) (opens in a new tab)

  13. Expedient moment connections for timber portal frame buildings

    … componentry can be assembled by an offsite fabricator. This assembly approach is comparable to that used when building in steel. This allows expedient assembly of the joint onsite once portions of the structure or individual members have been lifted into place. This approach reduces the …

    auckland-ms Repository record for Expedient moment connections for timber portal frame buildings (opens in a new tab)

  14. Graph Rotation Systems for Physical Construction of Large Structures

    … techniques easier to understand for the fabricator. It has implications to the sculpture world as well as architecture.

    tamu Repository record for Graph Rotation Systems for Physical Construction of Large Structures (opens in a new tab)

  15. The corporate model : sculpture, architecture, and the American city, 1946-1975

    … I look at three sculptures produced by the fabricator Lippincott Inc., either as a series or in multiple editions, during its first five years of operation: Tony Rosenthal’s cubes (1967-68), Barnett Newman’s Broken Obelisk (1963-67), and Claes Oldenburg’s Geometric Mouse (1969-71).

    texas Repository record for The corporate model : sculpture, architecture, and the American city, 1946-1975 (opens in a new tab)

  16. Simulation Modelling and Analysis of Impact of 3D Feedback Workflow on Prefabrication of Industrial Construction

    … that the relatively short payback period for the fabricator justifies the initial technology investment required to set up the platform for 3D feedback in the revised workflows.

    waterloo Repository record for Simulation Modelling and Analysis of Impact of 3D Feedback Workflow on Prefabrication of Industrial Construction (opens in a new tab)

  17. Computer aided cost estimation of steel structures a case study of operational approach

    … Columbia and an industrial firm ,Coast Steel Fabricators, to investigate the topic of computer cost estimation of steel structures. The objective of this research is to computerize the current cost estimating process of Coast Steel Fabricators and investigate a method of generating the labour …

    ubc Repository record for Computer aided cost estimation of steel structures a case study of operational approach (opens in a new tab) Download PDF for Computer aided cost estimation of steel structures a case study of operational approach (opens in a new tab)

  18. 2D and 3D Fabrication Devices: Can They Improve Spatial Reasoning Skills in Children?

    … of two hours of activities involving 2D and 3D fabricators on the spatial reasoning skills of children in Grades 4 and 5, ages 9 to 10, from a private school in Southeast Texas. Can the introduction to hands-on activities with products created with these devices and learning about how these …

    unt Repository record for 2D and 3D Fabrication Devices: Can They Improve Spatial Reasoning Skills in Children? (opens in a new tab)

  19. Automated Planning and Scheduling Method for Modular Construction Manufacturing

    … wall panel production line operated by a modular fabricator in Edmonton, Canada, and the second is of a wood-based semi-automated wall panel production line also in Edmonton, Canada. These cases involve the production of 200 wall panels in the first case and 39703 wall panels in the second at …

    concordia Download PDF for Automated Planning and Scheduling Method for Modular Construction Manufacturing (opens in a new tab)