Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 20 of 56 for “"grade-control"”

  1. Drill-hole Spacing Optimizations in Grade-Control

    Final estimates at the grade-control (GC) stage of mining are built to maximize the correct classificationof mineable blocks. The costs include drilling, mining, and processing. When consideringdedicated GC drilling, Drill-hole spacing (DHS) optimization for profit balances the cost of …

    alberta Repository record for Drill-hole Spacing Optimizations in Grade-Control (opens in a new tab)

  2. Geostatistical Modeling for Grade Control and Long Range Models

    … is sampled before production decisions. The grades and other rock properties are estimated in the unsampled volume. The success of a mine is dependent on accurate grade control. The grade control process establishes the final planned destination of mined material, directly influencing the …

    alberta Repository record for Geostatistical Modeling for Grade Control and Long Range Models (opens in a new tab)

  3. Integrated System for Improved Grade Control in Open Pit Mines

    Grade control establishes the final destinations for mined material (plant, stockpile, waste dump, etc.) at the time of mining. Correct decisions bring profit to a mining company while incorrect decisions bring losses. There are several potential sources of misclassification of mined material: i) …

    alberta Repository record for Integrated System for Improved Grade Control in Open Pit Mines (opens in a new tab)

  4. Analysis and design of grade control structures using scrap tires

    … to analyze soil and water forces acting on the grade control structures. The calculated forces (horizontal and vertical reactions) are then used to determine the minimum requirement for the pullout strength of a binding system or tires and the required unit weight of the structure (tires and …

    iastate Repository record for Analysis and design of grade control structures using scrap tires (opens in a new tab)

  5. Analysis and design of fill materials used in grade control structures

    … to investigate the feasibility of constructing grade control structures of whole scrap tires filled with flowable fill. This thesis focuses on the shear strength and erosion resistance of proposed filling materials, and examines constructiblity of the structure. Various fill materials and their …

    iastate Repository record for Analysis and design of fill materials used in grade control structures (opens in a new tab)

  6. Grade Control Optimization in Open Pit Mining using Supervised Machine Learning Approach

    Ore and waste classification in grade control is a critical aspect of mining operations to define which material is considered as ore or waste. Geostatistical techniques such as kriging and conditional simulation are used to estimate grades between sample points, followed by the application of a …

    queens Repository record for Grade Control Optimization in Open Pit Mining using Supervised Machine Learning Approach (opens in a new tab)

  7. An advanced grade control systems class and machine control file conversion study

    … and other organizations to develop advanced grade control classes at Iowa State University. Since these classes were the first known offerings of their kind, qualitative interviews were conducted to identify appropriate course curricula, educational outcomes, educational objectives, homework …

    iastate Repository record for An advanced grade control systems class and machine control file conversion study (opens in a new tab)

  8. Advanced Grade Control with Multivariate Geostatistics, Blast Movement Modeling, and Optimized Dig Limits

    Grade control in open pit mines establishes the final destination for mined material (e.g., plant, leach pad, stockpile, waste dump, etc.). In contrast to long- and medium-term mine planning, errors at this stage of a mine operation cannot be changed in the future; correct decisions bring a certain …

    alberta Repository record for Advanced Grade Control with Multivariate Geostatistics, Blast Movement Modeling, and Optimized Dig Limits (opens in a new tab)

  9. Application of predictive blasting model to improve grade control and optimize blast value

    … model against actual production data. The grade control model as an important part of reconciliation process is a model developed for daily ore/waste selection to determine where each material mined should go. It is crucial to avoid sending the block of material to the wrong destination as …

    colo-mines Repository record for Application of predictive blasting model to improve grade control and optimize blast value (opens in a new tab)

  10. The evaluation of riprap and low cost grade control structures in western Iowa

    … spawning an increase in the construction of grade control structures. It is known from past research (Lohnes et al., 1980) and field observations that low-cost structures utilized in western Iowa do provide the necessary grade control to inhibit degradation. What is not known, is how well …

    iastate Repository record for The evaluation of riprap and low cost grade control structures in western Iowa (opens in a new tab)

  11. Hydrologic and hydraulic analyses of stream stabilization and grade control structures in western Iowa

    … this study looked into the backwater effects a grade control structure has on a stream channel, the tractive force occurring on the bottom of the stream channel, using a computer model to calculate sediment yield and sediment transport to determine if a stream is aggrading or degrading, and …

    iastate Repository record for Hydrologic and hydraulic analyses of stream stabilization and grade control structures in western Iowa (opens in a new tab)

  12. Evaluation of fish passage and fish and macroinvertebrate communities in southwest Iowa streams modified by grade control structures

    <p>Nearly 400 riprap weirs, also termed grade control structures (GCS), have been placed in streams of western Iowa since the early 1990's to decrease erosion and protect bridge infrastructure and farmland. These structures consist of a 1.2 m high metal dam and a downstream apron of rock riprap, …

    iastate Repository record for Evaluation of fish passage and fish and macroinvertebrate communities in southwest Iowa streams modified by grade control structures (opens in a new tab)

  13. Análisis de incertidumbre e impacto de distintas fuentes de entrada en el proceso de grade control de Cerro Colorado

    Grade Control es un proceso de selección de polígonos y estimación del material tronado, donde se muestrean los pozos de tronadura en una densidad definida por la malla de perforación. En Cerro Colorado el material seleccionado tiene distintos destinos de procesamiento o botadero, acorde a sus …

    chile Repository record for Análisis de incertidumbre e impacto de distintas fuentes de entrada en el proceso de grade control de Cerro Colorado (opens in a new tab)

  14. The impact of applying high grade domaining as a method of dealing with Gold outliers in Otjikoto mine grade control modelling system, Namibia

    … in the near future. The orebody depicts gold grade zonation, with the highest grades hosted in the cores of the ore shoots within the shorter limbs and hinges of the intrafolial folds in distinctive en-enchelon veins, whilst the lower grades make up the peripherals of the ore shoots. …

    namibia Repository record for The impact of applying high grade domaining as a method of dealing with Gold outliers in Otjikoto mine grade control modelling system, Namibia (opens in a new tab)

  15. An analysis of studies on attitudes toward mandatory continuing professional education in 16 selected professions

    … minutes, two times a week. Forty-seven control students remained in the classroom.Multivariate analysis of covariance was done to test the null hypotheses. The criterion for rejecting or retaining the null hypothesis was set at the .05 level of probability.Data collected from the pre- …

    ballstate-thes Repository record for An analysis of studies on attitudes toward mandatory continuing professional education in 16 selected professions (opens in a new tab)

Page 1 of 3