Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 1 of 1 for “"high-volume continuous production"”.

  1. A Study of the Factors Related to Planned and Actual Manufacturing Lead Time in Two Environments: (1) High-Volume Continuous-Production and (2) Job-Shop Production-to-Order

    … factors influencing manufacturing lead time, (2) production planning processes influencing manufacturing lead time accuracy, and (3) techniques reducing manufacturing lead time. These factors, production planning processes, and techniques were then IV investigated to determine the importance of …

    unt Repository record for A Study of the Factors Related to Planned and Actual Manufacturing Lead Time in Two Environments: (1) High-Volume Continuous-Production and (2) Job-Shop Production-to-Order (opens in a new tab)