Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 21 for “"implementation schedule"”.
-
The Naval aircraft component modification programproblems and recommendations.
… levels have led to a number of problems in the implementation of component modifications in Navy aircraft. The problems dealt with in this study are confined to the areas of replacement procedures for installed components, implementation schedule, inventory support (spares, piece parts), and …
-
A commercially viable computer security implementation framework
… issues to be addressed in a timely manner, the implementation schedule of each method has been addressed in terms of a 4 phase Systems Development Life Cycle. Finally, to address commercial security concerns, a third dimension of cost/effectiveness was added for each method under consideration. …
-
AIS operation for effective bridge lookout
… shipping companies. As the mandatory AIS implementation schedule was changed recently, an additional study was made to investigate how this influenced opinions deck officers.
-
Illinois Vocational Student Service Network Equal Employment Opportunity/Affirmative Action Policy Development
… each section, states the policy, and lists an implementation schedule. The final section, entitled Conclusion and Recommendations, draws upon the literature review to make specific recommendations.
-
Improvements to transmission expansion planning and implementation :treating uncertainty in commercial operation dates and increasing aunction efficiency
… electricity transmission expansion planning and implementation process are presented in this thesis. The first proposal refers to the use of combinatorial and simultaneous descending auctions to treat the exposure problem and increase the efficiency of multi-item transmission auctions. A …
-
Bringing in Large Scale Technological Change: A Case Study
… factors that enabled or impeded the wide-scale implementation of a student information system in a large, complex urban school district?” The setting for this case study was the educational sites of the Vancouver Board of Education. The case involved the implementation of an electronic student …
-
Design of a University Research Network: Analysis, Selection, and Implementation Planning
… research organization through a structured implementation plan, which includes system implementation schedule, functionality, required resources, and cost analysis. In addition, this report includes a case study performed at California Polytechnic State University, San Luis Obispo (Cal …
-
Post Plan Improvisations of Strategic Marketing Plans: Towards a Taxonomy
… tool for "doing" marketing. The marketing plan's implementation schedule provides a roadmap for accomplishing a firm's stated marketing objectives. For over three decades researchers have investigated planning's link to firm performance. The consensus has been that they do improve performance …
-
Propuesta del Plan de Gestión para la Implementación de la Telemedicina en la población Indígena Zenú adulta para disminuir los indicadores de mortalidad total en Tuchin- Córdoba.
… provides a management plan that will allow the implementation of telemedicine as a differentiating factor in the early detection of diseases that optimize mortality indicators. Initially, a search for information was carried out to characterize the services to be provided, followed by a design …
-
Downtown Revitalization Strategy Report for Glenrock, WY
… This Strategy Report was prepared to provide an implementation plan for revitalization of the downtown following the Main Street Approach, as well as for achievement of a Certified Main Street Community status by the year 2014. The project included an interactive process, directly involving key …
-
AN EMPIRICAL EXAMINATION OF THE KANBAN APPROACH TO MANUFACTURING INFORMATION SYSTEMS IN U.S. FIRMS (UNITED STATES)
… questions that need to be answered regarding implementation of kanban by American companies: (1) is it possible that a manual kanban system can serve a manufacturing system better than a computer-based MRP system? and (2) how can a kanban system be implemented successfully in an American …
-
Investigating Implementation of Federal Agency Reorganization
This study investigates the implementation phase of reorganization. Although determination of reorganization success or failure is a rather intractable problem, this study sheds light on this issue by performing a structured study of the U.S. Government Accountability Office (GAO) reports to answer …
-
Management of Global Reservoir Sedimentation: Evaluating RESCON 2 for Sediment Management Alternatives
… in RESCON, such as automatically determining the implementation schedule of flushing or a sustainable solution for dredging operations, have great influence over the respective method's analysis. Approximations can be used if these options were selected.Twenty reservoirs from around the world were …
-
Identifying the Feasible Maximum Contaminant Level for Per- and Polyfluoroalkyl Substances That Ensures Health and Safety While Maintaining Affordability and Equity of Drinking Water and Implementation of That Maximum Contaminant Level Within California by the State Water Resources Control Board
… re-evaluation every six years as well as an implementation schedule that provides appropriate timeframes for reaching the MCL related to public water system size, current treatment systems, and disadvantaged community status.
-
Opportunities and barriers for greening procurement in South African Provincial Public Entities- perspectives from KwaZulu-Natal
… policies and strategies that support the implementation of green public procurement. Findings within local government have showed that it is due to a lack of knowledge regarding the possible interventions and mechanisms as well as capacity to enforce green procurement that has hindered …
-
Mathematical Model and Framework for Multi-Phase Project Optimization
… initial infrastructural investment required for implementation of future phases. Pairing possible phases of a project and doing them in parallel is beneficial due to positive synergies between phases but on the downside requires larger capital investments. Unavailability of enough budgets to …
-
Quantitative analyses of unit train safety and railroad tank car implementation policy
… of train configuration on risk, and policies for implementation schedule for safer tank cars. The effect of loading condition on unit-train derailment occurrence, causes and severity is described in Chapter 2. An algorithm was developed to identify derailments of loaded and empty unit trains on …
-
Posouzení informačního systému firmy a návrh změn
Tato diplomová práce se zabývá analýzou informačního systému ve Vinařství Holánek a návrhem jeho změn. Zaměřuje se především na vyřešení problému s dostupností dat pro manažerské rozhodování ve firmě. Po definování teoretických základů je provedena řada analýz o současném stavu podniku. Poslední …
-
Založení malého podniku
Diplomová práce pojednává o založení malého podniku zaměřeného na prezentaci nemovitostí pomocí dronu, 3D skenu a videoprohlídek. V teoretické části jsou zpracovány základní pojmy k založení podniku, charakterizovány jsou metody analýzy prostředí a postupy tvorby podnikatelského plánu. V praktické …
-
Implementace systému WPKS v Precheze, a.s.
Cílem práce je projekt na implementaci systému Workcenter PKS v Precheze a.s., Přerov, výstupy implementace a posouzení přínosů implementace pro Prechezu a její pracovníky. V současné době je systém WPKS zakoupen a přechází z analytické fáze do fáze implementační. V návrhové části se zaměřím na …
Page 1 of 2