Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 24 for “"installation procedure"”.
-
Análise numérica de cravação de estacas torpedo modeladas por integral de pressões
… anchor, in a global analysis tool to model its installation procedure, via a numerical integral of soil pressures on its penetrated surface. Therefore, this method is associated to the weak coupling formulation in time domain, in which the torpedo is represented by a rigid body with six degrees …
-
Measurement of Matric Suction In Thin Membrane Surface Highways Using Thermal Conductivity Sensors
… in September 2000 to develop a practical installation procedure for the new thermal conductivity sensor developed at the University of Saskatchewan, Canada. The new sensor, called the University of Saskatchewan Thermal Conductivity Matric Suction Sensor, is able to indirectly measure soil …
-
Development of a First-Generation Prototype Laboratory System for Rail Neutral Temperature Measurements
… Temperature (RNT). RNT is controlled in the CWR installation procedure; however, over time, the temperatures deviate from the RNT. The deviation causes significant thermal stresses introduced in the longitudinal direction of the rail, leading to potential failures such as pull-apart and buckling, …
-
Structuring and machine learning methodologies for knowledge mining and applications on big data
… and CommC K8s Deployer for automating the installation procedure, CommC Provisioner for intelligent resource scheduling, SparkQueue for simplified job submission and SparkReact for interactive model creation. The platform's versatility and performance were validated through the successful …
-
An evaluation of the full displacement pressuremeter
… mud. One method of simplifying the pressuremeter installation procedure is to install the probe in a full displacement manner. A solid tip is placed oh the end of the probe and then the pressuremeter is pushed into the ground in the same manner as a cone penetrometer. This research project was …
-
Neck sense rope system and leaching studies for SNO+.
… the system, the performed calibration and the installation procedure in more detail.
-
Development and optimization of new generation start-up instrumentation systems (SUI) for domestic CANDU reactors
… is to develop a new systematic approach to SUI installation/replacement procedure development and optimization. Although some additional features, such as real-time data monitoring and storage/archiving solutions for SUI systems are also examined to take full advantage of today’s digital …
-
Strengthening of noncomposite steel girder bridges with post-installed shear connectors : fatigue behavior of the adhesive anchor
… is the adhesive anchor, given its convenient installation procedure but relatively poor fatigue performance in previous tests. The objectives of this thesis were to quantify the fatigue strength of the adhesive anchor, as well as quantify the shear force and slip demands on adhesive anchors in …
-
Dynamic Testing, Finite Element Modeling, and Long-Term Instrumentation of a Box Girder Post-Tensioned Bridge for the Long-Term Bridge Performance Program
… data concerning the health and maintenance procedures currently in use across the nation. FHWA program managers along with members of the Utah State University LTBP research team selected the bridge with the assistance of the National Bridge index and site visits. Dynamic modal analysis and …
-
The feasibility and application of multi–layer vacuum insulation for cryogenic hydrogen storage
… of a typical hydrogen storage vessel. The installation procedure, to limit heat transfer and boil-off due to edge effects in this configuration was investigated. It was found that insulation-overlap-edge effects will always have an impact on insulation performance when a spherical header of …
-
Detailed investigation of lime-cement columns in quick clay during construction
Numerous landslides associated with deep mixing installation in quick clay has been reported. Deep mixing is a ground improvement method commonly used to stabilise roads and railway embankments. However, during the deep mixing installation process, the method temporarily reduces the stability of …
-
Analysis of strains in cast iron joints using FE-simulations and digital image correlation techniques
… initial tests and simulations indicate that the installation procedure of the joint introduce residual strains which affect the behavior of a joint subjected to mechanical loading. Experimental tests show that the distance from an edge to the first key as well as the distance between keys in a …
-
Three-dimensional numerical simulation and design of tensioned roof bolting for underground coal mines.
… sequence, roof bolting components, bolt installation procedure and pre-tension is modeled realistically. Bedding planes and in-situ horizontal stresses are also considered in the model. A case study of a well-instrumented intersection of entry/crosscut was used to compare the results from …
-
Monitoring and detection of cracks in steel girders of bridges using a distributed binary crack sensor
… girder of a bridge in Canada to study the installation procedure and effect of environmental condition on the sensor.
-
Power and Energy Transduction In Piezoelectric Wafer Active Sensors For Structural Health Monitoring: Modeling and Applications
… of PWAS power and energy transduction; (II) PWAS installation and durability study; (III) novel miniaturized PWAS approaches for SHM. In part I, the dissertation presents a systematic investigation of power and energy transduction of PWAS. The PWAS transmitter model, receiver model, and …
-
Aspects of Articulated Column Design Including Rigid Body and Elastic Vibration
… space utilisation within the structure, installation procedure and human awareness to motion responses are, discussed. Data are provided which are intended to give general guidance to designers and also establish the inter-dependence of certain parameters. Chapters 4 and 5, are concerned …
-
Elektroninio verslo įtaka įmonės konkurencingumo didinimui /
… and logistics. However, electronic business installation procedure in the enterprise is rather complicated and requires a wide range of different resources, thus, at present a large number of Lithuanian enterprises still do not employ the advantages of electronic business or employ it poorly. …
-
Laboratory and Field Performance of Buried Steel-Reinforced High Density Polyethylene (SRHDPE) Pipes in a Ditch Condition under a Shallow Cover
… pipe to maintain the cross-section shape during installation and to support overburden stresses and traffic loading. The HDPE resin protects the steel against corrosion and provides a smooth inner wall. The combination of steel and plastic materials results in a strong and durable material with a …
-
Effect of FRP Anchors on the FRP Rehabilitation of Shear Critical RC Beams and Flexure Critical RC Slabs
… and can be done so using the same adhesives and installation techniques. This research study aimed to investigate the effectiveness of using commercially manufactured FRP anchors to secure FRP sheets installed to strengthen and repair RC beams in shear and RC slabs in flexure. Twenty one shear …
-
Nondestructive Damage Detection and Stress Corrosion Crack Mitigation in Stainless Steel Plates
… Patch design, material selection, and a detailed installation procedure are explored and developed in this study. To evaluate the patch integrity as well as the crack mitigation with the patch, a set of tests have been designed. We first performed effectiveness testing to verify the load bearing …
Page 1 of 2