Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 11 of 11 for “"integrated schedule"”

  1. Integrated schedule recovery: a multi-agent approach

    … strive to mitigate these costs by creating schedules that are less likely to get disrupted or schedules that are easier to repair upon disruptions. New types of aircraft, larger fleets, expanding networks and increasing constraints on crew scheduling from regulators, crew collective …

    coimbro Repository record for Integrated schedule recovery: a multi-agent approach (opens in a new tab)

  2. A Methodology for Demand Assessment and Integrated Schedule Design and Fleet Assignment Applied to Thin-Haul Scheduled Operations

    … of vehicle technologies to promote thin-haul scheduled operations and the assessment of potential demand. This thesis investigates thin-haul operations from the airline's point of view, aiming to understand how flight operations optimization can aid commuter operators to improve profitability …

    gatech Repository record for A Methodology for Demand Assessment and Integrated Schedule Design and Fleet Assignment Applied to Thin-Haul Scheduled Operations (opens in a new tab)

  3. Resource constrained scheduling problem at U.S. Naval Shipyards

    Submarine repair schedules are some of the most complex schedules seen in project management. Repairs of a nuclear U.S. submarine are resource constrained since resources are divided among approximately thirty shops (e.g. electricians, welders, and pipefitters). The system complexity, the tight …

    mit Repository record for Resource constrained scheduling problem at U.S. Naval Shipyards (opens in a new tab)

  4. Resource constrained scheduling problem at U.S. Naval Shipyards

    Submarine repair schedules are some of the most complex schedules seen in project management. Repairs of a nuclear U.S. submarine are resource constrained since resources are divided among approximately thirty shops (e.g., electricians, welders, and pipefitters). The system complexity, the tight …

    nps Repository record for Resource constrained scheduling problem at U.S. Naval Shipyards (opens in a new tab)

  5. Integrating railway track maintenance and train timetables

    … is often far from optimal. Existing methods schedule track maintenance once the best train timetable has been determined and allow little or no adjustments to the timetable. This approach almost certainly produces suboptimal integrated solutions since the track maintenance schedule is …

    adelaide Repository record for Integrating railway track maintenance and train timetables (opens in a new tab)

  6. Integrated supply-demand models for the optimization of flexible transportation systems

    … and flexible decision support tools with integrated decision problems. Furthermore the supply models enable to understand the impact of flexibility on transportation operations with appropriate representation of flexibility aspects. The main study area of the thesis is air transportation …

    epfl Repository record for Integrated supply-demand models for the optimization of flexible transportation systems (opens in a new tab)

  7. A Multi-agent Reinforcement Learning Approach to the Schedule and Aircraft Recovery Problem in Airline Disruption Management

    … that minimise the impacts and recover the schedule from these disruptions as soon as possible. This thesis addresses the Schedule and Aircraft Recovery Problem (SARP) by developing three reinforcement learning approaches: a two-stage Single-Agent Reinforcement Learning (SARL) approach with …

    unsw Repository record for A Multi-agent Reinforcement Learning Approach to the Schedule and Aircraft Recovery Problem in Airline Disruption Management (opens in a new tab) Embargoed

  8. Integrated Scheduling Material Requirements Planning Lean Process

    … and explain how important an accurate Master Schedule is to the success of ordering materials, in a Just in Time (JIT) environment. I will discuss how lead times for parts ordering and materials are derived for a satellite build. I will break the sections into three parts; the first section …

    lmu Repository record for Integrated Scheduling Material Requirements Planning Lean Process (opens in a new tab)

  9. Návrh nové provozní koncepce autobusové dopravy v oblasti Rudenska

    Cílem této bakalářské práce je nejprve prozkoumat přepravní vztahy a stávající provozní koncept dopravy v oblasti Rudenska a posléze v dalších částech na základě poznatků a za použití zásad integrálního taktového grafikonu navrhnout nový koncept autobusové dopravy. Posledně budou navržené provozní …

    cz-tech Repository record for Návrh nové provozní koncepce autobusové dopravy v oblasti Rudenska (opens in a new tab)

  10. Zlepšení železničního spojení Kutná Hora hl. n. – Zruč nad Sázavou

    Tato bakalářská práce se zabývá zlepšením železničního spojení na regionální trati Kutná Hora hl.n. – Zruč nad Sázavou. Současná poloha stanic a organizace provozu neposkytuje atraktivní ani systémovou jízdní dobu, což se projevuje v dlouhých pobytech při křižování, nepravidelném intervalu a špatné …

    cz-tech Repository record for Zlepšení železničního spojení Kutná Hora hl. n. – Zruč nad Sázavou (opens in a new tab)

  11. Prověření možnosti zavedení nové autobusové linky Jihlava - Hradec Králové

    Tato bakalářská práce se zabývá návrhem nové autobusové linky mezi Jihlavou a Hradcem Králové. V analytické části bude ve vymezeném území provedena analýza přepravních vztahů a stávající dopravní obslužnosti. Na základě toho budou vybrány dvě varianty tras, pro které bude při zohlednění zásad …

    cz-tech Repository record for Prověření možnosti zavedení nové autobusové linky Jihlava - Hradec Králové (opens in a new tab)