Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 1 of 1 for “"inverted max-stable process"”

  1. A new flood estimation paradigm for the design of civil infrastructure systems

    … the system. Conventional design flood estimation processes are ill-equipped to deal with these complex problems. Whereas traditional flood estimation approaches focus on estimating flood risk at a single location, this thesis proposes a new estimation paradigm that focuses on estimating …

    adelaide Repository record for A new flood estimation paradigm for the design of civil infrastructure systems (opens in a new tab)