Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 10 of 10 for “"lifting system"”.
-
Desenvolvimento de um sistema Inteligente para a análise de cartas dinamométricas no método de elevação por bombeio mecânico
The artificial lifting of oil is needed when the pressure of the reservoir is not high enough so that the fluid contained in it can reach the surface spontaneously. Thus the increase in energy supplies artificial or additional fluid integral to the well to come to the surface. The rod pump is the …
-
Darbuotojų motyvacijos įtaka tobulėjimo ir kompetencijos kėlimui /
… and improvement of the competence and the lifting system is disclosed GK ", JSC" weaving "and" Osama "branch of the motivation and the impact on the development of elevation, and assessing the work at the beginning of the subject of conjecture.
-
Estudo do dano em cabo de aço utilizados em equipamentos de transporte vertical
… steel wire rope is one of the main elements in lifting or weight load transportation equipments. During the operation of the equipments, the steel wire rope is subjected to oscillatory movements that cause wear and even cracking in the material. In order to evaluate the damage caused in a steel …
-
Análise do fenômeno da reversão em poços de petróleo equipados com o sistema de bombeio por cavidades progressivas
The artificial lifting system of progressive cavity pump (PCP) has become an important lifting method in the oil industry, presenting a good performance when applied in wells with production of viscous fluids or that carry solids. This system is formed by a metallic rotor that rotates inside a …
-
Reducing truck emission by reducing truck weight: The development of a new lightweight axle lift system driven by electric motor
… in these cases through air bellows axle lift systems. Due to the requirement of large and heavy levers to transfer the lifting force from the air bellows to the axles, the current solution is heavy and requires a lot of packaging space. This product development project aimed to conceptualize …
-
A study of wind tunnel aerodynamic data correction with panel method and two-variable method
… as source-sink, doublet and horseshoe vortex system. Excellent agreement has been found between the results of MPMARC-1 and image method for solid blockage, wake blockage and lifting system wall interferences. This modification makes it easy to study the fundamental wall in-terference …
-
Propuesta de un sistema mecanizado de izaje para mejorar la productividad del ciclo de extracción del pique 110 de la unidad minera La Verdosa
El presente trabajo de investigación tiene como título: “Propuesta de un sistema mecanizado de izaje para mejorar la productividad del ciclo de extracción del pique 110 de la unidad minera La Verdosa”. La necesidad de la mina de obtener mejores resultados en el ciclo de extracción del pique 110, …
-
Kolový portálový jeřáb
Cílem této bakalářské práce je konstrukční návrh nosného rámu a zdvihového ústrojí kolového portálového jeřábu pro manipulaci s kontejnery po ploše kontejnerového terminálu. Jedná se tedy o návrh hlavních nosných komponent jeřábu a dále o jejich pevnostní kontrolu. Práce se také zabývá návrhem a …
-
Stavebně technologická etapa montáže průmyslové haly
Bakalářská práce se zabývá stavebně technologickým projektem pro etapu montáže prefabrikovaného skeletu. Obsahuje technologický předpis pro montáž skeletu, projekt zařízení staveniště pro etapu montáže, časový plán montáže skeletu, finanční plán montáže skeletu, kontrolní a zkušební plán montáže, …