Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 9 of 9 for “"liquidated damages"”.

  1. Analysis of Liquidated Damages Provisions of Highway Standard Specifications in the USA

    … consequences of non-conformances, and Liquidated Damages as specified in all 50 Department of Transportation Standard Specifications. The data obtained from the review are analyzed and put into charts and tables to show how the states differed or agreed on the non-conformances, LDs, and …

    washington Repository record for Analysis of Liquidated Damages Provisions of Highway Standard Specifications in the USA (opens in a new tab)

  2. EVALUATION OF WAYS TO RECOVER LATE CONSTRUCTION PROJECTS

    … of projects fall behind schedule causing damages to almost all involved parties. Owners may experience losses due to postponed completion dates and Contractors may face liquidated damages. Even Architects and Engineers may face additional challenges resulted by delays. In this thesis …

    maryland Repository record for EVALUATION OF WAYS TO RECOVER LATE CONSTRUCTION PROJECTS (opens in a new tab)

  3. LA FORFETIZZAZIONE LEGALE DEL DANNO RISARCIBILE

    … of the legal predetermination of restorable damages, which is topic less studied by legal scholars than penalty clauses. The first chapter contains a survey of the most relevant cases of legal predetermination of restorable damages aimed at questioning the relevant structure, functions and …

    milano Repository record for LA FORFETIZZAZIONE LEGALE DEL DANNO RISARCIBILE (opens in a new tab)

  4. Development of Delays Claims Assessment Model

    … and increased overhead cost, cost escalation and liquidated damages, on the contractor’s side, are considered as the main impacts of delays on key project stakeholders. Meanwhile, preparing delay claims is a time consuming process that requires extensive resources. Facilitating this process will …

    concordia Download PDF for Development of Delays Claims Assessment Model (opens in a new tab)

  5. Komercinės nekilnojamojo daikto nuomos sutarties šalių civilinė atsakomybė /

    … to demand the compensation of incurred damages and in this way to compensate the incurred real loss. When applying the civil liability to the party, who has made the breach of the commercial realty lease agreement, it is necessary to indicate the provisions of such liability (malpractice …

    vilnius Repository record for Komercinės nekilnojamojo daikto nuomos sutarties šalių civilinė atsakomybė / (opens in a new tab)

  6. Penalties reworked

    <p>An ‘agreed damages clause’ is a contractual provision whereby the parties agree on the damages one party must pay if that party breaches a term. A valid agreed damages clause, known as a ‘liquidated damages clause’, is enforceable. An invalid agreed damages clause, known as a ‘penalty clause’, …

    oxford Repository record for Penalties reworked (opens in a new tab)

  7. Performance Based Contracting and Improving the Current Contracting Process

    … and the implementation of reasonable liquidated damages were among the additional suggestions put forth during the workshop sessions.

    clemson Repository record for Performance Based Contracting and Improving the Current Contracting Process (opens in a new tab)

  8. The 'penalty' clause in English law: a critical analysis and comparison with Jordanian law

    … provisions concerning the estimation of due damages in event of the promisor' breach are of considerable practical importance. When such provisions are enforceable they are called liquidated damages clauses. However, English law courts will not enforce these provisions where they are …

    whiterose Download PDF for The 'penalty' clause in English law: a critical analysis and comparison with Jordanian law (opens in a new tab)

  9. A QUANTITATIVE STUDY OF THE PERFORMANCE OF BUILDING CONTRACTS WITH SPECIAL REFERENCE TO SCHOOL PROJECTS IN SINGAPORE

    An investigation of performance of building contracts is always useful as it helps to compare the various parameters, such as variation in cost, time, completion time etc.. It is useful within the organization compared to outside organizations nationally as well as with similar organizations in …

    nus Repository record for A QUANTITATIVE STUDY OF THE PERFORMANCE OF BUILDING CONTRACTS WITH SPECIAL REFERENCE TO SCHOOL PROJECTS IN SINGAPORE (opens in a new tab) Download file for A QUANTITATIVE STUDY OF THE PERFORMANCE OF BUILDING CONTRACTS WITH SPECIAL REFERENCE TO SCHOOL PROJECTS IN SINGAPORE (opens in a new tab)