Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 2 of 2 for “"low critical-path delay"”

  1. FPGA Realization of Low Register Systolic Multipliers over GF(2^m)

    Finite field multiplication over GF(2^m) is a critical component for elliptic curve cryptography (ECC). National Institute of Standards and Technology (NIST) has recommended five polynomials (two trinomials and three pentanomials) for ECC implementation. Although there are a lot reports available …

    ohiolink Repository record for FPGA Realization of Low Register Systolic Multipliers over GF(2^m) (opens in a new tab)

  2. FPGA realization of low register systolic all one-polynomial multipliers over GF (2m) and their applications in trinomial multipliers

    … systolic multipliers can easily achieve low register-complexity implementations and the proposed architectures can be employed as computation cores to derive e¿cient implementations of systolic Montgomery multipli-ers based on trinomials, which are recommended by the National Institute of …

    ohiolink Repository record for FPGA realization of low register systolic all one-polynomial multipliers over GF (2m) and their applications in trinomial multipliers (opens in a new tab)