Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 20 for “"main contractors"”.
-
Effects of main contractors' service quality on subcontractors' behaviours and project outcomes in the Chinese construction industry
… research has documented the relationship between main contractors’ service quality and subcontractors’ behaviours and subcontractors’ project outcomes. This relationship is particularly important considering the heavy reliance of subcontracting in construction. Thus, the aim of this study is to …
-
Enabling Circular Construction Through Proactive Waste Logistics; The Role of Collaboration and Information Exchange Between Main Contractors and Waste Contractors
… information silos and poor coordination between main contractors and waste contractors. To explore how this interface can be improved, this qualitative single-case study investigates how collaboration and information exchange can be structured to enable proactive waste logistics. The empirical …
-
Factors Influencing the Unification of Safety Culture Within Construction Projects
… of laws and regulations regarding safety. Main contractors have the responsibility to make sure that they are providing a safe work environment for the people employed at their construction sites. An important tool to achieve this in the fragmented construction industry, is by having a …
-
Causal model for management of subcontractors in waste minimization
… waste generation behaviour exhibited by subcontractors in Singapore and how waste can be minimized. Based on causal methodology, the Construction Waste Minimization model was constructed using Supply Chain Management and Management Control concepts. From these concepts, eight main strategies …
-
Supply chain management practices in construction and inter-organisational trust dynamics
… to have focused on improvements in client and main contractor aspects of construction supply chain relationships, prompting claims that failure to integrate subcontractors, suppliers and consultants into collaborative arrangements remains a major shortcoming. Main contractor and subcontractor …
-
Decision-making in the selection of domestic subcontractors
… the decision making process utilised by main contractors when selecting subcontractors. In Part 1 the types of subcontractor employed are defined, similarly the reasons why subcontractors are used, and the size and importance of this service to the construction industry. The latest JCT …
-
Subcontracts in the UK construction industry : an investigation into the root causes of disputes
… by which construction work is carried out, using mainly discrete classical subcontracts. Inevitably, this method has a paramount function in the delivery of successful construction projects. However, construction disputes between main contractors and subcontractors are a widespread occurrence. The …
-
Computer aided decision support system for the selection of subcontractors in building refurbishment works
… projects. The contractual relationship between main contractors and subcontractors is the major feature of these activities. Hence, subcontractors perform vital roles in these projects. Currently, however, there is a lack of knowledge relating to the selection of subcontractors for BR projects. …
-
The work breakdown structure matrix: A tool to improve interface management
… activities), to the different partners (main contractors, sub-contractors and suppliers), and even internally to the teams working on different parts of a system for the same contractor. There are specific requirements and constraints at work interfaces that are technical, organizational, …
-
The impact of corporate social responsibility on construction workers
… directly. In the industry it is common for main contractors to be employed by the client, and then to subcontract out the work to a supply chain of subcontractors, who may further outsource the work to subbies and agency workers. This results in a fragmented employment structure with an …
-
Learning from lessons learned, How to preserve knowledge and improve relations to decrease additional costs and quality defects in new housing projects
… the most important factor when tendering subcontractors, risking compromising other important aspects. Yet another factor impacting a project’s outcome is errors. As all profit making organisations strive to increase profitability, these are essential to rectify, analyse and learn from. …
-
Comunicação na captação de eventos corporativos: um estudo nos Convention & Visitors Bureaus do Brasil
… the frequency and feedback of data in order to maintain a line of information and possible development, given that the evaluation point to point was cited by four destinations (Natal, São Paulo, Belém and Poços de Caldas). In conclusion, to build a communication to attract corporate events that …
-
On the Appropriateness of Contractor-Led Procurement
… choice of procurement methods than ever before. Main contractors and consultants alike are moving towards multidisciplinary teams offering design and management services, challenging single service consultants or contractors and are in competition with each other over who is leading the process. …
-
Application of Optimisation Techniques to Planning and Estimating Decisions in the Building Process
… within 2 of the top 20 (in terms of turnover) UK main contractors, and on published literature, bar charts and bills of quantities of concrete framed commercial buildings.<br/><br/>The duration and cost of construction of a typical multistorey reinforced concrete office building is calculated …
-
Psychosocial risks experienced by international students in the security industry of New Zealand : a thesis presented in partial fulfilment of the requirements of the Master of Business Studies (specialisation in HRM), Massey University, Auckland, New Zealand
… broader Auckland region were interviewed. Three main overarching themes were identified in the analysis. Theme 1 highlighted ‘accessibility issues’ identified as workers’ inaccessibility to adequate provisions such as Personal Protective Equipment (PPE), kitchen and toilet facilities, sufficient …
-
Digital Communication Structures in Construction Production; Increasing the Use of Digital Tools Among Subcontractors
… complex communication processes, as several subcontractors often work simultaneously under changing site conditions. This creates challenges related to access to updated information, coordination between trades, onboarding, and consistency in communication practices. The purpose of this master’s …
-
Strategic Purchasing of Manpower: The Necessity of a Workforce Pool for a Construction Company
… as Contractor Inc., is one of Sweden’s largest main contractors. Contractor Inc. is, like other construction companies in Sweden, lacking both blue-collar workers and white-collar workers. To deal with the demand for additional workers, Contractor Inc.’s current strategy is to purchase manpower …
-
Investigating the relationship between adoption of digital technologies (Automation and Digitalisation) by small medium micro enterprise contractors and project success and business longevity in the South African construction industry
… sharing and simulation modelling, adoption remain limited. This is confirmed by the identification of Critical Success Factors (CSF) by respondents. DT was not one of the frequently mentioned CSF amongst respondents in terms or their organisation nor their projects. Notwithstanding, the …
-
A methodology for evaluating the marketing function in the UK construction industry
… engineering aspects of construction; and the "Main Contractors", - the organisations that co-ordinate and execute construction projects. Like many non consumer based industries, the construction industry has been slow to adopt the marketing concept. Marketing concept suggests a totally new way …
-
Quality management of critical activities with a large number of subcontractors
… as the challenges, when a large number of subcontractors are involved. The challenges with quality management in infrastructure projects originate from a wide spectrum of factors such as the main contractors’ lack of expertise in all the outsourced activities and a greater responsibility for …