Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 6 of 6 for “"maintenance audit"”.

  1. A case study of Mercer University's intramural and recreational sports program to assess the inherent and potential risks for implementation of a risk management program

    This case study involved a safety and maintenance audit of Mercer University's intramural and recreational sports program. The purpose of the audit was to expose potentially hazardous conditions in the area of supervision, conduct of activities, facilities and equipment. A method of risk reduction …

    vt Repository record for A case study of Mercer University's intramural and recreational sports program to assess the inherent and potential risks for implementation of a risk management program (opens in a new tab)

  2. An improved maintenance management strategy for gas field equipment in Escravos gas–to–liquid plant, Nigeria

    … within the plant. Investigations on the maintenance audit carried out on the Nigerian Gas Company (NGC) revealed that 85 percent of such failures are directly linked to improper adaptability of an effective maintenance management strategy and plan within the petrochemical industries in …

    nwu-za Repository record for An improved maintenance management strategy for gas field equipment in Escravos gas–to–liquid plant, Nigeria (opens in a new tab)

  3. An Application of Reliability Engineering Concepts to the Analysis of the Accounting Control Systems

    … concepts) for the assessment, design, and maintenance of the reliability of the accounting control systems. This framework includes: (1) A reliability assessment model that provides a quantitative (probabilistic) measure of the error rate in the system, (2) A dynamic programming model which …

    uiuc Repository record for An Application of Reliability Engineering Concepts to the Analysis of the Accounting Control Systems (opens in a new tab)

  4. Modified constraint-induced movement therapy after stroke: A process evaluation of implementation in an early-supported discharge rehabilitation service

    … TDF (for focus group data). Retrospective file audits were conducted over two six-month periods. The first audit (N = 237) assessed the feasibility of mCIMT in the ESD service, while the second audit (N = 303) evaluated program adaptations and sustained mCIMT delivery. Data included patient …

    edithcowan Repository record for Modified constraint-induced movement therapy after stroke: A process evaluation of implementation in an early-supported discharge rehabilitation service (opens in a new tab)

  5. Die toepaslikheid van deeltitelheffings in Suid–Afrika

    … common property electricity and water, lift maintenance, audit fees, management agent fees, salaries and wages, security, swimming pool expenses and general building maintenance. According to the Traditional Costing System, indirect costs are allocated based on a single cost actual expenses …

    nwu-za Repository record for Die toepaslikheid van deeltitelheffings in Suid–Afrika (opens in a new tab)

  6. Prediktivní systém údržby obráběcích strojů s využitím vibrodiagnostiky

    … se všemi svými náležitostmi a aspekty jako např. audit údržby, tedy rozhodnutí o příhodnosti diagnostické údržby v rámci současného systému údržby, technické analýzy jako součást zavádění vibrační diagnostiky a praktická ukázka získávání, záznamu a posuzování změřených vibrací. Práce je zakončena …

    brno-tech Repository record for Prediktivní systém údržby obráběcích strojů s využitím vibrodiagnostiky (opens in a new tab)