Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 15 of 15 for “"metal construction"”.

  1. A Study of Thin-Film Superconducting Junctions

    … of thin-film superconducting junctions of metal-insulator- metal construction. This explanation entails the electron flow through the insulating layer through the use of the Fermi-Dirac and density of states functions. The theoretical investigation is based on the BCS Theory and results in …

    odu Repository record for A Study of Thin-Film Superconducting Junctions (opens in a new tab)

  2. Parduotuvė "SuperMarket" Sodo g. Šiauliuose /

    … a plot and building premises plan, building construction solutions, engineering networks and all other additional requirements that are necessary for the project. In drawings are: plot and building floor plans, facades, basement plan, building section cut. 2. Constructional part: S-18 and S-6 …

    vilnius Repository record for Parduotuvė "SuperMarket" Sodo g. Šiauliuose / (opens in a new tab)

  3. Karštuvas mikropluoštui /

    … A microfiber carding machine includes heavy metal construction and direct drive systems to ensure greater labour productivity in manufacturing of all textile products as well as non-woven products, such as house fashion, furniture, bed linen, automobile, filtering, and industrial products. A …

    vilnius Repository record for Karštuvas mikropluoštui / (opens in a new tab)

  4. Optimization of an Optical Thermal Absorber Plasmonic Metamaterial: Understanding the Two Particle Interactions

    … permeability. One of the proven methods for the construction of electromagnetic metamaterials is to use a metal-dielectric composite whereby the electromagnetic response is governed by oscillating surface plasmons and the geometry of the dielectric environment. However, the majority of these …

    wvu Repository record for Optimization of an Optical Thermal Absorber Plasmonic Metamaterial: Understanding the Two Particle Interactions (opens in a new tab)

  5. Automobilių remontų įmonės pastato plungėje statybos projektas /

    … of 3 main parts of the paper: architectural, constructional and technological. The architectural part provides general data about the designed building. Building dimensions: total length – 36.72 m, width – 24.72 m, height – 9.47 m. In addition, the architectural piece presents general data …

    vilnius Repository record for Automobilių remontų įmonės pastato plungėje statybos projektas / (opens in a new tab)

  6. EL CRYSTAL PALACE DE NUEVA YORK Y SU CONTRIBUCIÓN A LA HISTORIA DE LAS CONSTRUCCIONES METÁLICAS

    … allowed such urban growth was the development of metal structure buildings, which started to be built after the Crystal Palace (1853). The two-story building had an octagon-shaped floor plan of 120.3 meters of diameter; two higher central galleries defined the two major building axes, intersecting …

    upv Repository record for EL CRYSTAL PALACE DE NUEVA YORK Y SU CONTRIBUCIÓN A LA HISTORIA DE LAS CONSTRUCCIONES METÁLICAS (opens in a new tab)

  7. Proposta metodológica para o projeto de sistemas de fechamento em alvenaria para edifícios institucionais em estrutura de aço

    O desempenho de edifícios quanto à durabilidade está relacionado com a previsibilidade dos projetos executivos em planejar sistemas com vistas à condição de exposição ambiental a qual os mesmos estarão submetidos. O objetivo deste trabalho foi desenvolver uma proposta metodológica para o projeto de …

    brazil-ufv Repository record for Proposta metodológica para o projeto de sistemas de fechamento em alvenaria para edifícios institucionais em estrutura de aço (opens in a new tab)

  8. Skleník

    Cílem diplomové práce bylo navrhnout a posoudit ocelovou nosnou konstrukci budovy, nacházející se v areálu ZOO Zlín, jež bude využívána jako skleník. Jedná se o jednopodlažní budovu s kruhovým půdorysem o průměru 39,04 m, výška objektu je 15,63 m. Prostorová konstrukce opisuje kulovou výseč koule o …

    brno-tech Repository record for Skleník (opens in a new tab)

  9. Stavebně technologický projekt objektu pozemního stavitelství

    Tématem této diplomové práce je stavebně technologický projekt přístavby skladové haly v Tlumačově s nosnou ocelovou konstrukcí. Práce obsahuje studii realizace hlavních technologických etap, rozpočet stavby, časový a finanční plán, časový harmonogram prací, projekt zařízení staveniště, …

    brno-tech Repository record for Stavebně technologický projekt objektu pozemního stavitelství (opens in a new tab)

  10. Víceúčelová sportovní hala

    Diplomová práce se zabývá návrhem víceúčelové sportovní haly. Cílem této práce je navrhnout nosnou konstrukci o průměru 80,0 m v úrovni ±0,000. Konstrukce je kruhového půdorysu v úrovni ±0,000 o vnějším průměru 80,0 m. Výška haly ve vrcholu je 20,0 m. Hala je řešena vazníky ve 36 paprscích, které …

    brno-tech Repository record for Víceúčelová sportovní hala (opens in a new tab)