Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 2 of 2 for “"method Design – Build"”.

  1. Quantitative Analysis on Schedule, Cost, and Contingency: Performance Implications of Innovative Contracting Strategies

    … quantifying the effects of alternative delivery method (design-build) and contracting strategies (A+B, no excuse bonus, incentive/disincentive, and lump sum) on project performance. Particular emphases were given to (1) quantification of change order occurrence timing impacts on project …

    tamu Repository record for Quantitative Analysis on Schedule, Cost, and Contingency: Performance Implications of Innovative Contracting Strategies (opens in a new tab)