Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 58 for “"mine design"”.

  1. Integration of sustainability into the mine design process

    … mining industry is under increasing pressure to design, operate and close mining operations in accordance with the principles of sustainable societies This thesis investigates the hypothesis that a holistic mine design process, which integrates social, environmental and institutional criteria on …

    ubc Repository record for Integration of sustainability into the mine design process (opens in a new tab) Download PDF for Integration of sustainability into the mine design process (opens in a new tab)

  2. Open pit mine design guidelines considering autonomous haulage fleet

    … open pit mining activities and produces thorough design guidelines to deal with limits in traditional mine designs. The conventional design concepts do not match the operational needs of autonomous trucks, and that requires a change in approach to ensure sustainability, efficiency, and safety. …

    laurentian Repository record for Open pit mine design guidelines considering autonomous haulage fleet (opens in a new tab)

  3. Approaches and Barriers to Incorporating Sustainable Development Into Coal Mine Design

    … solution to sustainability challenges. The designer of coal mining operations needs to simultaneously consider legal, environmental, and sustainability goals, along with traditional mining engineering parameters, as integral parts of the design process. However, traditional coal mining …

    vt Repository record for Approaches and Barriers to Incorporating Sustainable Development Into Coal Mine Design (opens in a new tab)

  4. Application of network flow and zero-one programming to open pit mine design problems.

    … obstacle to prevent a simulation oriented pit design algorithm from reaching the optimum solution. A simulation oriented pit design algorithm can not resolve the re-allocation problem entirely without explicit definition of predecessors and successors. In order to preserve the advantages of …

    arizona-thes Repository record for Application of network flow and zero-one programming to open pit mine design problems. (opens in a new tab)

  5. The application of numerical methods for modelling the behaviour of discontinuous rock for mine design

    The modem design of an open pit in a rock mass commonly depends on the numerical analysis of stresses and displacements adjacent to the proposed structure. Rock masses are different from other engineering materials due to the presence of discontinuities. This feature of rock masses requires …

    adelaide Repository record for The application of numerical methods for modelling the behaviour of discontinuous rock for mine design (opens in a new tab)

  6. Determining the size and life of underground coal mines

    The determination of mine design variables such as mine shaft locations, mine field dimensions, mine design capacity, and mine service life under various mining conditions is of primary importance to the economics of developing and subsequently operating an underground coal mine. However, the …

    vt Repository record for Determining the size and life of underground coal mines (opens in a new tab)

  7. Integrating the LaModel and ARMPS Programs (ARMPS-LAM)

    … If the LaModel analysis of an ARMPS-type mine design, could be made as easily and quickly as an ARMPS analysis and calibrated against a large database, the potential exists to improve the quality of overall mine design.;In this research, a computer code (ARMPS-LAM) has been developed to …

    wvu Repository record for Integrating the LaModel and ARMPS Programs (ARMPS-LAM) (opens in a new tab)

  8. A predictive model using block data for dilution control in open pit mining

    … leading to a potential discrepancies between design intentions and actual operations, commonly referred to as reconciliation. This discrepancy may result in an increase in the tonnage of material to be milled while reducing its value. Despite variations influenced by deposit characteristics, …

    ubc Repository record for A predictive model using block data for dilution control in open pit mining (opens in a new tab) Download PDF for A predictive model using block data for dilution control in open pit mining (opens in a new tab)

  9. Pillar load transfer mechanisms in multi-seam mining

    … seam to subadjacent workings is investigated. Mine geometry and geology are researched as major variables affecting interaction between contiguously placed seams. The thesis includes photoelastic experimentation, finite element modeling, and analysis of multi-seam room and pillar mine case …

    vt Repository record for Pillar load transfer mechanisms in multi-seam mining (opens in a new tab)

  10. Predicting mining company-stakeholder conflict and incorporating social conditions into mining project valuation

    … are becoming increasingly involved in mine design and permitting decision-making. Yet, the systems in which mining investment decisions take place do not fully capture the importance of stakeholder influence on the success or failure of a mining venture. Conventional mine planning and …

    colo-mines Repository record for Predicting mining company-stakeholder conflict and incorporating social conditions into mining project valuation (opens in a new tab)

  11. Machine Learning Analysis of Cave Mine Pillar Collapses

    … challenges driven by the increased demand for minerals, depletion of superficial deposits, reduction in grades and increased depth of mining operations. The preferred alternative to address this scenario are caving methods due to their high production capacity and low operational costs, which …

    queens Repository record for Machine Learning Analysis of Cave Mine Pillar Collapses (opens in a new tab)

  12. Optimizing secondary tailgate support selection

    … two different surveys of operating longwall coal mines in the United States. The ALPS (Analysis of Long wall Pillar Stability) program was used to determine adequacy of pillar design for the successful longwall case histories. A relationship was developed between the secondary support density …

    vt Repository record for Optimizing secondary tailgate support selection (opens in a new tab)

  13. Stress transfer between multi-seam longwall mines

    … of coal under multi-seam mining conditions. Mine design in such an environment will require the accurate prediction of stress transfer between adjacent seams. The available knowledge on criteria controlling stress transfer has been exhaustively reviewed and critical factors affecting …

    vt Repository record for Stress transfer between multi-seam longwall mines (opens in a new tab)

  14. Geotechnical design of the McLellan Mine, Lynn Lake, Manitoba

    The overall objective of any geotechnical mine design procedure must be to maximize the extraction of the ore reserves while maintaining the integrity of the working areas. At the McLellan Mine the cut-and-fill mining method was first adopted. This decision was made for flexibility in the size and …

    ubc Repository record for Geotechnical design of the McLellan Mine, Lynn Lake, Manitoba (opens in a new tab) Download PDF for Geotechnical design of the McLellan Mine, Lynn Lake, Manitoba (opens in a new tab)

  15. Design Programs for Highwall Mining Operations

    … the recovery ratio of coal reserves, and enhance mine safety as well as productivity. Therefore, it is probable that highwall mining will be a dominant method for extracting the high-value coal resources in the Appalachian coalfields. By far, the greatest ground control safety concerns in highwall …

    wvu Repository record for Design Programs for Highwall Mining Operations (opens in a new tab)

  16. Simulation and Animation Model of Fabero Coal Mine Operation

    … and animation model for a giant open pit coal mine in Spain known as Fabero. This simulation model aims to study different mine equipment selection scenarios. The simulation software package used in this research study includes GPSS/H® and PROOF animation. The application of simulation models …

    unr Repository record for Simulation and Animation Model of Fabero Coal Mine Operation (opens in a new tab)

  17. Interaction effects due to subsidence in multiple seam mining

    … control mechanisms that must be considered in mine design, when contiguous seams have not been extracted in descending order, is subsidence. This investigation examines the affects of subsidence not on the surface but on mineable seams of coal lying above the seam that has been extracted. Case …

    vt Repository record for Interaction effects due to subsidence in multiple seam mining (opens in a new tab)

  18. Pillar Stress Change Measurement in Potash

    In-situ stress measurement can be used by mine engineers and rock mechanics specialists to quantify the in-situ stress state in the ground, or the effect underground mine workings have on the stress state in the surrounding ground when assessing the mine design. The results of a good monitoring …

    sask Repository record for Pillar Stress Change Measurement in Potash (opens in a new tab)

Page 1 of 3