Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 3 of 3 for “"model maturity assessment"”.

  1. PROJECT MANAGEMENT MATURITY IN THE CONSTRUCTION INDUSTRY OF DEVELOPING COUNTRIES (THE CASE OF ETHIOPIAN CONTRACTORS)

    This research has studied the maturity of PM in the construction industry of developing countries; in the course, the research has also identified two major gaps in the existing maturity models and, proposed a PM maturity model to address the gaps and adapt it to the developing countries context. …

    maryland Repository record for PROJECT MANAGEMENT MATURITY IN THE CONSTRUCTION INDUSTRY OF DEVELOPING COUNTRIES (THE CASE OF ETHIOPIAN CONTRACTORS) (opens in a new tab)

  2. Measuring and Visualizing Integrated Project Interface Status

    … progress by using BIM (Building Information Model) and IMS (Interface Management System) related data. To address the first objective, a project monitoring method named Integrated Project Monitoring Method (Contribution-1, C1) that visualizes interface health and workload measurements within …

    waterloo Repository record for Measuring and Visualizing Integrated Project Interface Status (opens in a new tab)

  3. Assessment of IT Governance process maturity in Eastern Cape Governance Departments

    … there is no guiding framework for ITG maturity processes specific to the Government Departments. This study operationalises two objectives, firstly, to assess the ITG processes maturity levels for the Eastern Cape (EC) Government Departments and secondly to develop a customised …

    nwu-za Repository record for Assessment of IT Governance process maturity in Eastern Cape Governance Departments (opens in a new tab)