Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 20 of 182 for “"non value"”

  1. Identifying non-value added waste that delay emergency CT brain workflow using lean management principles

    … of these patients. Identification of the nonvalue-added waste (NVAW) (steps regarded as wasteful to the customer) in the CT brain workflow can be determined by use of a lean management tool namely a value stream map (VSM - a flow analysis of information required to provide service to the …

    cape-town Repository record for Identifying non-value added waste that delay emergency CT brain workflow using lean management principles (opens in a new tab)

  2. Visual Management in Engineering Can Improve Resource Utilization and Reduce Administrative Non-Value Added Time

    This research has demonstrated how Visual Management (VM) can be used in an engineering environment to improve engineering resource utilization. Furthermore, it reduces the administrative time associated with unclear project scope, schedule, budget, and task alignment amongst engineers and project …

    wku-diss Repository record for Visual Management in Engineering Can Improve Resource Utilization and Reduce Administrative Non-Value Added Time (opens in a new tab)

  3. Incorporating Lean Non-Value Added Variants into a Method of Determining Stakeholder Salience for First-Line Manager Decision Making

    … streams have been identified as ways to improve value of the organization. Previous studies disagree regarding whether Lean and Stakeholder theory can work together. The potential problem of having a poor balance of Stakeholders and Lean waste is that exclusive focus on one may result in less …

    indystate Repository record for Incorporating Lean Non-Value Added Variants into a Method of Determining Stakeholder Salience for First-Line Manager Decision Making (opens in a new tab)

  4. Identifying Non-Value Adding Activities to Enhance Productivity in Freight Terminals A Case Study of DB Schenker’s Terminal Operations

    … Terminal Department is working on measuring non-value adding activities (referred to as support activities) through its process-oriented time registration in a system called Check In Check Out. The purpose of Check in Check out is to carry out a detailed productivity measurement and gain …

    chalmers Repository record for Identifying Non-Value Adding Activities to Enhance Productivity in Freight Terminals A Case Study of DB Schenker’s Terminal Operations (opens in a new tab)

  5. A Hybrid Simulation Model for Understanding and Managing Non-Value Adding Activities in Large-Scale Design and Construction Projects

    The hybrid model developed in this research and the key findings gained through its application to real-world construction projects are envisioned to help construction managers to better understand and manage the dynamics of NVAAs, and ultimately minimize the risk of schedule delays and cost …

    uiuc Repository record for A Hybrid Simulation Model for Understanding and Managing Non-Value Adding Activities in Large-Scale Design and Construction Projects (opens in a new tab)

  6. Factors that drive efficiency of construction logistics

    … construction logistics solution? RQ2: What are value-adding, non-value-adding and necessary activities in the material flow in the construction logistics solution and how can non-value-adding activities be eliminated? RQ3: What different factors affect the materials handling activities in the …

    chalmers Repository record for Factors that drive efficiency of construction logistics (opens in a new tab)

  7. Analysis of patient throughput time at Kosair Children's Hospital emergency room.

    … through a time study. The time study analyzes value added time and non-value added time in the emergency room. The majority of the patient throughput time is non-value added time and needs to be minimized. Solutions to minimize the nonvalue added time and future studies to continuously improve …

    louisville Repository record for Analysis of patient throughput time at Kosair Children's Hospital emergency room. (opens in a new tab)

  8. Multiple-Case Study and Exploratory Analysis of the Implementation of Value-Added Teacher Performance Assessment on Eighth Grade Student Achievement in Ohio, Pennsylvania, and Tennessee

    … the academic impact of the implementation of the Value Added Assessment Model. The researcher analyzed the Value Added Assessment Models in the three Value Added Assessment Model states that had implemented the Value Added Assessment Model for more than five years. Additionally, the research was …

    ucf Repository record for Multiple-Case Study and Exploratory Analysis of the Implementation of Value-Added Teacher Performance Assessment on Eighth Grade Student Achievement in Ohio, Pennsylvania, and Tennessee (opens in a new tab)

  9. Developing a Model to Evaluate Maintenance Operations

    … to systematically evaluating and analyzing the non-value added activities within the maintenance function. One of the primary lean tools that can provide a different dimension in identifying and analyzing non-value added activities is Value Stream Mapping (VSM). However, the traditional VSM …

    ut-knoxville Repository record for Developing a Model to Evaluate Maintenance Operations (opens in a new tab)

  10. Improving the ordering process between a fashion retailer and its external suppliers

    … such as high amounts of manual work, several non-value adding activities and delivery problems at the distribution centre. This has led to low efficiency and long process lead times. As lead times and supply chain efficiency are two important factors for creating competitive advantage in …

    chalmers Repository record for Improving the ordering process between a fashion retailer and its external suppliers (opens in a new tab)

  11. An Application of Lean Thinking to the Furniture Engineering Process

    … company's current engineering process, identify non value-added activities, and analyze the engineering performance based on selected Key Performance Indicators (KPIs) such as lead time, document error rate, and engineering throughput. A survey questionnaire was sent out to the engineering group …

    vt Repository record for An Application of Lean Thinking to the Furniture Engineering Process (opens in a new tab)

  12. Application of the Lean Philosophy to reduce Carbon Emissions in the Precast Concrete Industry of Singapore

    … waste, preventing pollution and maximizing value to owners. However, an in-depth investigation of the lean concept?s role in reducing carbon emissions should be conducted before any recommendations can be made. Prefabrication systems are believed to have the potential for better …

    nus Repository record for Application of the Lean Philosophy to reduce Carbon Emissions in the Precast Concrete Industry of Singapore (opens in a new tab)

  13. School foodservice directors' perceptions of value and cost of using agriculture commodities in child nutrition programs

    … commodity foods creates costs for CNP due to non-value-added expenses such as storage and delivery. Programs such as net off invoice (NOI) have been implemented in the past five years to remove non-value costs. Use of these programs is voluntary by the state distribution agency, manufacturers, …

    iastate Repository record for School foodservice directors' perceptions of value and cost of using agriculture commodities in child nutrition programs (opens in a new tab)

  14. Value Stream Mapping of Information Flow in Infrastructure Projects

    <p>Value Stream Mapping (VSM) is a tool for depicting the flow of material in a manufacturing process. This study demonstrates that value stream mapping can also be applied to the movement and processing of information in a non-manufacturing environment. Here, the handling of, and changes to, water …

    ohiolink Repository record for Value Stream Mapping of Information Flow in Infrastructure Projects (opens in a new tab)

  15. Developing and Building a Lean Based RFID Electronic Kanban Prototype

    … report. Since the lean philosophy is to reduce non-value added waste to a process, the new prototype kanban system meets four design objectives that are consistent with the principles of lean and the original purpose of the kanban system. The RFID E-Kanban prototype must support the process of …

    calpoly Repository record for Developing and Building a Lean Based RFID Electronic Kanban Prototype (opens in a new tab)

  16. Naval expeditionary logistics support group, training and evaluation unit: an analysis of current operations while searching for training efficiencies

    … total time in the system and to extract the non-value added processes. The study found that newly assigned instructor candidates are subject to an inordinately long training period respective to their tour length to achieve qualification for cargo handling training and evaluation. Reasons for …

    nps Repository record for Naval expeditionary logistics support group, training and evaluation unit: an analysis of current operations while searching for training efficiencies (opens in a new tab)

  17. Aplicação do ciclo DMAIC para a melhoria de um processo de maquinagem

    … is to reduce and if possible, eliminate these non-value-added support activities, thereby reducing operation intervention in the process and making it more efficient. In short, the aim is to improve the box preparation process.To address the issue presented by the company and, consequently, …

    coimbro Repository record for Aplicação do ciclo DMAIC para a melhoria de um processo de maquinagem (opens in a new tab)

  18. Improving work performance of individuals with severe cognitive impairment through enabling technology

    … following data were collected: the proportion of non-value added behavior per cycle of bagged candy, the number of specific type of non-value added behaviors, productivity - as defined by the time to package an individual piece of candy, the number and specific type of errors and the number and …

    wayne-thes Repository record for Improving work performance of individuals with severe cognitive impairment through enabling technology (opens in a new tab)

  19. AN IMPLEMENTATION STRATEGY FOR LEAN MANUFACTURING IN HIGHMIX AND LOW VOLUME (HMLV) ENVIRONMENT

    … The collected data will be used to eliminate non-value-added activities by reducing uncertainty in demand systems to increase flexibility in demand. This study will emphasize using data mining to examine the dataset for homogeneity between objects. Afterward, a simulation representing the …

    ohiolink Repository record for AN IMPLEMENTATION STRATEGY FOR LEAN MANUFACTURING IN HIGHMIX AND LOW VOLUME (HMLV) ENVIRONMENT (opens in a new tab)

  20. Mapeamento do fluxo de valor de uma jornada de compra sob a ótica do cliente: ampliando conceitos, representações e indicadores-chave de desempenho com base em um estudo de caso

    … mapping and measurements of the different value and non-value stages of a Customer Purchase Journey (CPJ). Inspired by the precepts of Lean Thinking, with emphasis on the Value Stream Mapping (VSM) method, the approach is based on an indepth analysis of a real e-commerce acquisition of an …

    brazil-uerj Repository record for Mapeamento do fluxo de valor de uma jornada de compra sob a ótica do cliente: ampliando conceitos, representações e indicadores-chave de desempenho com base em um estudo de caso (opens in a new tab)

Page 1 of 10