Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 6 of 6 for “"on-site logistics"”
-
Evaluation of on-site logistics at different types of construction projects
There is a reduced level of attention to logistics in the construction sector according to the literature. Even though studies have shown that improved logistical measures have provided benefits it is still not implemented at a large scale across the sector. Consequently, the same challenges can be …
-
Enabling Circular Construction Through Proactive Waste Logistics; The Role of Collaboration and Information Exchange Between Main Contractors and Waste Contractors
The construction sector faces a critical challenge due to its high material consumption and massive waste generation, making the transition toward a circular economy (CE) an operational necessity. While circular principles establish clear targets for closed-loop supply chains, practical execution …
-
Exploring the potential of artificial intelligence for improving on-site construction logistics; Opportunities and challenges
The construction industry continues to face multiple challenges related to on-site logistics, including fragmented information flows, inefficient material handling, limited space availability, and reactive planning practices. These challenges are particularly significant in urban construction …
-
Mitigation strategies for challenges to achieving high performing onsite construction logistics. A case study with insights from a large Swedish construction company
The construction industry has difficulties achieving high performance and well-functioning construction logistics is a key aspect for improving project performance and increasing productivity. The aim of this study was therefore to expand the understanding of the poor performance of on-site …
-
A Total Cost Analysis Model of Construction Logistics Solutions Comparing Direct Delivery and Delivery via a Construction Logistics Center at JM
The construction industry has challenges in increasing productivity and at the same time keeping production costs down in comparison to other industries. The construction industry also entails a high environmental footprint due to choices of materials and the many materials deliveries necessary for …
-
Příprava realizace hrubé vrchní stavby polyfunkčního domu MAXMIN
… zpracovaný v programu BUILDpower S, časový harmonogram zpracovaný v softwaru CONTEC, a plán zajištění bezpečnosti práce. Nad rámec hlavního zadání práce obsahuje technické a ekonomické porovnání systémů montáže podlahového vytápění aplikované na dispozice řešeného objektu.