Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 17 of 17 for “"pay-back period"”.

  1. Analyzing sustainable energy opportunities for a small scale off-grid facility: a case study at Experimental Lakes Area (ELA), Ontario

    … system using the existing diesel generators as back-up has the shortest pay back period of the technologies modeled. The biomass based CHP system has a pay back period of 4.1 years at $0.80 per liter of diesel, as diesel price approaches $ 2.00 per liter the pay back period reduces to 0.9 years, …

    manitoba Repository record for Analyzing sustainable energy opportunities for a small scale off-grid facility: a case study at Experimental Lakes Area (ELA), Ontario (opens in a new tab)

  2. A reality-based cost-benefit analysis of high performance residences in Victoria, BC

    … disadvantage, energy advantage, and expected pay-back period associated with building an above-code residence in Victoria, BC. In addition, this initiative created a much-needed benchmark for contractors to gain a firm understanding of the construction details required to achieve the various …

    uvic Repository record for A reality-based cost-benefit analysis of high performance residences in Victoria, BC (opens in a new tab)

  3. Developing and evaluating continuously changing schedules for Hardwood lumber dry kilns

    … Energy and time savings result in a 3.8 year pay back period for the investment of computer equipment.</p>

    ut-knoxville Repository record for Developing and evaluating continuously changing schedules for Hardwood lumber dry kilns (opens in a new tab)

  4. Atsinaujinančiųjų energijos šaltinių efektyvumo tyrimas /

    … for different heating systems, calculation of pay back period for heat pump. The conclusions and recomendations are given. This thesis cam be useful in selection of heating system for building , and selection of heat pump type.

    vilnius Repository record for Atsinaujinančiųjų energijos šaltinių efektyvumo tyrimas / (opens in a new tab)

  5. The Technical and Economic Feasibility of Producing Methane from Biomass Using a Leaching-Bed/Packed-Bed Conversion Process

    … using a life cycle cost model to determine pay back period. The results indicate that payoff period will be less than equipment life and that net energy production occurs. Areas where further research would promote the introduction of this technology are identified and discussed.

    ucf Repository record for The Technical and Economic Feasibility of Producing Methane from Biomass Using a Leaching-Bed/Packed-Bed Conversion Process (opens in a new tab)

  6. Torrefied-Hydrochar Blend Wood Biomass Improvement for Fuel Pellet Production: A Tree-to-Customer Analysis

    … viable at this scale with a relatively short pay-back period and high internal rate of return. A hazard and operability analysis with health and safety review is presented with appropriate mitigation techniques. Described in this research are the reasons for the chosen ratio of torre ed …

    unr Repository record for Torrefied-Hydrochar Blend Wood Biomass Improvement for Fuel Pellet Production: A Tree-to-Customer Analysis (opens in a new tab)

  7. Modeling the financial impact of management decisions on loblolly pine (Pinus taeda) production

    … targeted to landowners with little forestry background. As a planning tool for landowners, the LPDST provides options for various spacing configurations, as well as options for pine straw harvest. The LPDST predicts average diameter at breast height (dbh) and height within a 99% confidence …

    missouri Repository record for Modeling the financial impact of management decisions on loblolly pine (Pinus taeda) production (opens in a new tab)

  8. Regional plastic waste recycling through pyrolysis – a techno-economic evaluation

    … to raise interest from investors, with a pay-back period (PBP) of seven years. The simpler PS process and the more complex PS process have a PBP of 15 and 17.5 years respectively, the difference mainly arising from the substantially higher investment cost for the more complex process which …

    chalmers Repository record for Regional plastic waste recycling through pyrolysis – a techno-economic evaluation (opens in a new tab)

  9. The utilization of cold storage through solar PV mini-grids to reduce spoilage in fisheries in Tanzania

    … investment and allow the fishermen to have a pay-back period of at least one year. Another finding is that the capacity of the mini-grid may need to increase to be able to cover the demand during the periods of low production of the solar PVs, where investments in increase capacity in solar PV …

    chalmers Repository record for The utilization of cold storage through solar PV mini-grids to reduce spoilage in fisheries in Tanzania (opens in a new tab)

  10. Process integration study for increased energy efficiency of a PVC plant

    … annual savings could reach 20 MSEK with a short pay-back period of about one year. Both in the existing and future VCM-plant, there is a large excess of low-grade heat below the pinch, which could be used for heating at other parts of the site. This would enable additional steam savings of the …

    chalmers Repository record for Process integration study for increased energy efficiency of a PVC plant (opens in a new tab)

  11. Development of an Improved Methodology for Analyzing Existing Single-Family Residential Energy Use

    … measures were determined through a simple pay-back cost analysis. In order to verify the methodology, the both methods were tested on actual residence and the results were compared to determine if both procedures identified the same potential energy conservation measures. Once the procedure …

    tamu Repository record for Development of an Improved Methodology for Analyzing Existing Single-Family Residential Energy Use (opens in a new tab)

  12. RISK MANAGEMENT FOR SEAPORT INVESTMENT

    … in them are likely to be large and the pay-back period likely to be long. These make them risky ventures. Furthermore, private investors may have difficulty or are not prepared to bring in sufficient financing to enable them to have adequate management control. Strategies are therefore …

    nus Repository record for RISK MANAGEMENT FOR SEAPORT INVESTMENT (opens in a new tab) Download file for RISK MANAGEMENT FOR SEAPORT INVESTMENT (opens in a new tab)

  13. Efektivnost u staveb pro využití volného času

    Diplomová práce se zabývá efektivností investičních projektů. V práci je nejprve popsáno, co jsou to investice, jaké jsou zdroje a peněžní toky investic a metody hodnocení efektivnosti investic. Dále je práce zaměřena na projekt Městské plovárny Luhačovice. Jedná se především o historii, výstavbu, …

    brno-tech Repository record for Efektivnost u staveb pro využití volného času (opens in a new tab)

  14. ΤΕΧΝΙΚΕΣ ΑΞΙΟΛΟΓΗΣΕΩΣ ΕΠΕΝΔΥΣΕΩΝ ΕΛΛΗΝΙΚΩΝ ΒΙΟΜΗΧΑΝΙΚΩΝ ΕΠΙΧΕΙΡΗΣΕΩΝ

    AS THE MORE DIFFICULT AND THE MORE IMPORTANT STAGE, OF THE CAPITAL BUDGETING PROCEDURE, IS THE INITIAL STAGE THAT IS: "THE DEFINITION OF THE INVESTMENT PROPOSAL AND THE ESTIMATION OF THE CASH FLOW", THE RELATIVE INTERNATIONAL THEORY AND RESEARCH HAVE AS MAIN OBJECTIVE THE SECOND STAGE, THAT IS: …

    greece Repository record for ΤΕΧΝΙΚΕΣ ΑΞΙΟΛΟΓΗΣΕΩΣ ΕΠΕΝΔΥΣΕΩΝ ΕΛΛΗΝΙΚΩΝ ΒΙΟΜΗΧΑΝΙΚΩΝ ΕΠΙΧΕΙΡΗΣΕΩΝ (opens in a new tab)