Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 20 of 249 for “"post-construction"”
-
Maintenance elements and guidelines for post-construction best management practices
<p>The general public rarely grasps the importance of a stormwater management and conveyance system until the facility fails to work or causes damage and problems. Structures such as detention ponds, catch basins, and infiltration basins often receive attention only when the local agency receives …
-
Post-construction evaluation for work zones and construction engineers training
<p>Evaluation in construction projects can be seen as a judgment of the project, and it is a way to find out what could improve in the project. The project evaluation could be discussed with the project participants and other people in the company, bringing feedback through communication. This …
-
Estimating Post-Construction Costs of a Changing Urban Stormwater Program
… depending on the BMP type. Estimated annual post-construction costs applied to a hypothetical 1,000-acre indicate that moving from large-scale to small-scale stormwater controls has a large impact in terms of financial obligation.
-
A post construction evaluation of an interior landscape and related spaces
Call number: LD2668 .T4 1979 W37
-
A post construction evaluation of an interior landscape and related spaces
Call number: LD2668 .T4 1979 W37
-
Post Construction Stormwater Best Management Practices: Exfiltration Trench: Performance and Design Assessment
The exfiltration trench (ExT) is one of the BMPs that the Ohio department of Transportation (ODOT) is using to remove pollutants from stormwater runoff. A 1-year study was conducted on an ExT located in Reno, OH. Samples from the stormwater runoff and trench's effluent were collected. These samples …
-
Post-construction verification of hydraulic conductivity of soil in an earthen dam
… density gauge were measured on the soil during construction of the dam. The data were superimposed on the laboratory generated ZOA to determine the expected hydraulic conductivity of the soil in the dam. All of the points indicate the in-situ hydraulic conductivity to be less than 1 x10-7 …
-
A post-construction evaluation of long-term success in leed-certified residential communities
… successful performance of the projects at the post-construction stage with a focus on three main aspects of sustainability, satisfaction, and life cycle performance. This study evaluates multiple aspects of long-term project success by setting sustainability as the baseline and finding the …
-
Exfiltration Trenches for Post Construction Storm Water Management for Linear Transportation Projects: Laboratory Study
The exfiltration trench as a best management practice for stormwater management is studied in the document. The exfiltration trench contains three layers such as pervious concrete, gravel and filter media (greensand). All three layers of the exfiltration trench were simulated and tested in the …
-
Water Quality Impact Assessment and the Impact of Hydrology on Nutrient Retention ofBloody Run-Post Construction
… Bloody Run and its tributaries. Through pre- and post-constructionassessments, the study evaluated changes in nutrient concentrations and hydrologicalinputs. Results indicate significant reductions in nitrogen species loading postconstruction.However, there was an increase in phosphorus loading …
-
Construction and post-construction performance of vertical breakwaters on soft soils : the Port of Barcelona case
The design and construction of vertical caisson breakwaters on soft soils represents a significant challenge for the engineering of marine structures. Past experience reveals that this type of structures is sometimes prone to failure or to undergo excessive settlements. Cyclic loading due to storm …
-
Exfiltration Trenches for Post Construction Storm Water Management for Linear Transportation Projects: Field Study of Suspended Materials
Highway storm water runoff contributes to the degradation of surface water quality in the United States. The most important pollutant in highway runoff is the total suspended solids (TSS). The United States Environmental Protection Agency (U.S.EPA) requires the runoff to be treated before it is …
-
Exfiltration Trenches for Post Construction Storm Water Management for Linear Transportation Projects: Site Investigation on Metal Removal
… Study period included pre maintenance and post maintenance phases and a reconstruction phase. Modified event mean metal removals for the nine metals prior to clogging (pre maintenance) ranged from 7.8%- 52.1% and for post maintenance ranged from no removal to 24.8% for the original trench. …
-
Assessing the impacts of post-construction best management practices on stormwater runoff in an ultra-urban environment
The effects of urbanization on water resources in the United States and around the world have been well documented by scientists and engineers. Traditional storm sewer systems coupled with detention basins have historically been implemented to mitigate the increased stormwater runoff volume and …
-
Enhancing Sustainability in Post-Construction Management: Leveraging API-Driven AI and Digital Twins for Optimising M&E Systems
… in academic literature, practical adoption in post-construction building management remains limited, particularly in public-sector contexts. This research investigates how API-driven AI and Digital Twin technologies can enhance sustainability in postconstruction M&E systems within the Further …
-
Construction and post-construction deformation analysis of an MSE wall using terrestrial laser scanning and finite element modelling
Terrestrial Laser Scanning (TLS) is a new technology surveying tool that can collect highly accurate cartesian coordinates of data points surrounding the scanner in a 360° field of view. This technology can be useful in the field of monitoring heavy civil structures, in the case of this research, …
-
Does it pay to be mature? Assessing the performance of a mature bioretention cell seven years post-construction
Bioretention cells (BRCs) are low-impact development stormwater management structures that integrate water quantity and quality management. Although BRCs have a predicted design life of about 25 years, most current research focuses on performance of cells less than two years old. This project …
-
Methane Emissions from a Constructed Wetland: The Sandhill Fen 10 years Post Construction as an Oil Sand Reclamation Project
… were low during the first three years after construction (2013-2015). It was hypothesized that unfavourable redox conditions for methanogenesis due to alternative electron acceptors like sulfur may decrease with time (Clark et al., 2020). In 2022, methane emissions were measured at 20 plots …
-
An evaluation of tillage radish (Raphanus sativus L.) to alleviate post-construction soil compaction and germination potential under varying environmental conditions
… and the need for compaction remediation in post-construction urban soils where landscape plants will be established, we sought to test the potential of tillage radish for post-construction applications. Unlike the more predictable seasonal periods of sewing, terminating, and incorporating a …
Page 1 of 13