Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 48 for “"preconstruction"”.

  1. Estimating preconstruction services costs for highway projects

    <p>Preconstruction Services (PCS) is defined as all work completed on a project once it has been authorized for funding and cost related to the project can be charged accordingly, up until construction contract is awarded. Due to the changing nature of State DOT work with increased funding …

    iastate Repository record for Estimating preconstruction services costs for highway projects (opens in a new tab)

  2. A Systematic Process for Implementing Mass Customization in Residential Preconstruction

    … and product family design. However, the preconstruction process fails to employ these same principles. The purpose of this study was to explore how mass customization principles can simplify customization in the residential preconstruction process. Two rounds of interviews were conducted …

    byu Repository record for A Systematic Process for Implementing Mass Customization in Residential Preconstruction (opens in a new tab) Download PDF for A Systematic Process for Implementing Mass Customization in Residential Preconstruction (opens in a new tab)

  3. Planning for value-generating collaboration during the design/preconstruction phase

    … value to construction projects during the design/preconstruction phase. This was accomplished in part by conducting a case study involving an “integrated” project that engaged 20 participant-researchers employed by either the construction manager/general contractor, architect, or owner that played …

    msu Repository record for Planning for value-generating collaboration during the design/preconstruction phase (opens in a new tab)

  4. Evaluating the preconstruction phase in a Construction Manager/General Contractor project

    … is that the contractor is involved during the preconstruction phase. The main focus of this research is the preconstruction phase of the CMGC delivery method through three research objectives.</p> <p>First, an agency must want to use the CMGC method to deliver construction projects. Research on …

    iastate Repository record for Evaluating the preconstruction phase in a Construction Manager/General Contractor project (opens in a new tab)

  5. A framework for optimized and automated tower crane planning in preconstruction phase

    … to ineffective tower crane planning in the preconstruction phase, which lacks a formalized planning process and a commonly agreed upon planning target. In the state-of-practice, Engineers conduct iterative planning in a manual approach using mostly 2D representations of project data and …

    texas Repository record for A framework for optimized and automated tower crane planning in preconstruction phase (opens in a new tab)

  6. A technical preconstruction services process model for the private real estate development industry

    The process for technical preconstruction services is not well defined in current literature. To better explain the process, this thesis has created a process model that defines the phases, activities and activity relationships of technical preconstruction services. The thesis defines technical …

    washington Repository record for A technical preconstruction services process model for the private real estate development industry (opens in a new tab)

  7. A framework for estimating preconstruction service costs at the functional level for highway construction projects

    … of funding for services rendered during the preconstruction phase of highway projects has been found to degrade the final quality of project construction documents, generating design errors, omissions, and ambiguities that must be remedied at additional cost during construction. The overall …

    iastate Repository record for A framework for estimating preconstruction service costs at the functional level for highway construction projects (opens in a new tab)

  8. Identifying the impact of preconstruction elements on project budget and time using BIM-generated data: developing a decision-making guideline for project owners

    Preconstruction is the preliminary part of a project’s lifecycle during which the plan for construction is established. There are many critical decisions made during this phase that may lead to variances in preconstruction budget and time. Controlling budget variances is a key objective during the …

    oklahoma-thes Repository record for Identifying the impact of preconstruction elements on project budget and time using BIM-generated data: developing a decision-making guideline for project owners (opens in a new tab) Restricted access

  9. Evaluating the value of contractor involvement in the design phase

    … to involve the construction contractor in the preconstruction phase of a project, providing input to the planning and design processes. Furthermore, the quality of a constructed project is a function of the quality of its design. Therefore, this research evaluates the value added to a project …

    iastate Repository record for Evaluating the value of contractor involvement in the design phase (opens in a new tab)

  10. A Knowledge-based system framework for semantic enrichment and automated detailed design in the AEC projects

    … and the required information for performing preconstruction and construction activities. This research effort proposes a framework for a knowledge-based system (KBS) that encapsulates domain experts’ knowledge and represents it through modularized rule set libraries as well as connected …

    gatech Repository record for A Knowledge-based system framework for semantic enrichment and automated detailed design in the AEC projects (opens in a new tab)

  11. Noise Characerization For Proposed UCF Phyiscal Science Building Sites.

    … and manufacturing processes. Therefore preconstruction site surveys are needed to develop strategies for mitigating noise. Vibration and low frequency electromagnetic fields are particularly detrimental for sensitive instruments, and they are also difficult to mitigate. However a large …

    ucf Repository record for Noise Characerization For Proposed UCF Phyiscal Science Building Sites. (opens in a new tab)

  12. Analysis of the State of the Art of 5D BIM for lifecycle cost estimation, cost control, and payments

    … used to estimate the cost of projects during the preconstruction period. There is a lack of integration between the 5D BIM models, existing progress monitoring tools, and payment systems used in construction. This leads to a lack of interoperability in cost estimation during the preconstruction …

    gatech Repository record for Analysis of the State of the Art of 5D BIM for lifecycle cost estimation, cost control, and payments (opens in a new tab)

  13. The effects of transportation demand management on the emissions of global warming gases for the Brentwood, Tennessee Interstate 65 transportation corridor

    … traffic. Four temporal states were analyzed preconstruction of high occupancy vehicle lanes without traffic demand management or traffic control measure implementation, construction ongoing without implementation of traffic demand management or traffic control measures, construction ongoing …

    ut-knoxville Repository record for The effects of transportation demand management on the emissions of global warming gases for the Brentwood, Tennessee Interstate 65 transportation corridor (opens in a new tab)

  14. Another big ditch : the prospect of a Nicaragua Canal

    … of infrastructures that remain stuck in the preconstruction phase. And yet the many ways in which the Nicaragua Canal is currently affecting resident peoples demonstrate the very real power it has, even when it does not yet exist in the material world. Given this, I engage Derrida’s concept …

    ubc Repository record for Another big ditch : the prospect of a Nicaragua Canal (opens in a new tab) Download PDF for Another big ditch : the prospect of a Nicaragua Canal (opens in a new tab)

  15. The State of BIM-Based Quantity Take-Off Implementation Among Commercial General Contractors

    … semi structured interviews with estimators, preconstruction, BIM and Virtual Design Construction (VDC) managers, valuable insights on the BIM QTO implementation state among general contractors were gathered and analyzed. Links between BIM QTO benefits, project design phases and delivery …

    byu Repository record for The State of BIM-Based Quantity Take-Off Implementation Among Commercial General Contractors (opens in a new tab) Download PDF for The State of BIM-Based Quantity Take-Off Implementation Among Commercial General Contractors (opens in a new tab)

  16. Understanding the issues of project cost and time in sustainable construction from a general contractor's perspective: case study

    … the General Contractor may offer insightful preconstruction assistance by providing ideas on green construction methods and materials. As sustainable building practices become more prominent in the construction industry, General Contractors must remain knowledgeable on current green building …

    gatech Repository record for Understanding the issues of project cost and time in sustainable construction from a general contractor's perspective: case study (opens in a new tab)

Page 1 of 3