Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 18 of 18 for “"project system"”
-
An inquiring framework for changing project management practice: A qualitative method study
… and practical knowledge in the area of project management through the development of an inquiring, integrative project management framework. The methodological framework used in this work is based on an interpretivist philosophy using grounded theory building within a systems thinking …
-
Low back pain : a personal projects analysis : a thesis presented in partial fulfilment of the requirements for the degree of Doctor of Philosophy in Psychology at Massey University, Palmerston North, New Zealand
… and adjustment, this study used a personal projects approach to examine the relationship between individuals' appraisals of projects and their functional adaptation to low back pain in the context of their day-to-day goal-directed activities. A functional personal project system was …
-
Procesų tyrybos metodų taikymas draudimo srityje /
… processes and existing insurance application system, perform analysis, expand the functionality of the system using process mining methods and tools to improve insurance business processes.The following tasks are solved during the final work: 1. To analyze the processes of insurance proposals …
-
Sex differences in the relationship between personal projects and job satisfaction
… to men, may experience an overload of personal projects leading to greater project conflict and subsequent lowering of job satisfaction. Seventy-three men and 76 women employed by Canadian National at their Montreal Headquarters were assessed with Personal Projects Analysis techniques (Little, …
-
Diffusion Measurements of Ethane in Activated Carbon
… experimental set-up was developed during this project. System characterization experiments such as dead volume measurements, detector selection, detector's response time calculations were performed and are discussed in detail. ZLC measurements were carried out to study the controlling diffusion …
-
Expect the Unexpected : An Exploratory Study on the Conditions and Factors Driving the Resilience of Infrastructure Projects
This study originates from the recognition that project management research is replete with normative theories on what need projects to be successful. However, it has performed worse with respect to assisting the understanding of how and why similar projects do not have similar performances during …
-
Identification of risk paths in international construction projects
Within the context of construction projects, risk is generally defined as an uncertain happening which is the function of its occurrence probability and the severity of its possible impacts on pre-defined objectives. According to this definition, international construction projects are high-risk …
-
The Development of Cost of Ownership Factors for Conceptual Design Guidelines
Purpose of the Project: The purpose of this project is to provide algorithms that relate system design configuration alternatives to operating and support costs. The algorithms will allow graphical presentation of cost differences related to operation and support of system design alternatives over …
-
Le système aide-projet mondial et la problématique du développement en Haïti : quelles externalités locales
Depuis la chute du régime des Duvalier en 1986, Haïti se veut un État démocratique dans lequel les pratiques du développement territorial insistent sur l’implication et la participation des acteurs locaux. Les principes de la décentralisation sont alors proclamés impliquant une volonté de l’État …
-
Monte Carlo Alternate Approaches to Statistical Performance Estimation in VLSI Circuits
… induce non-determinism in the rest of the system variables. This has transformed the traditional circuit simulation problem into one of Statistical Performance Estimation (SPE). Statistical distributions are used to represent parameters and Monte Carlo (MC) type methods are used for …
-
Integration of Overlapped Design and Construction Stages Through Location-Based Planning Tools
… construction industry, which aims to shorten the project lead time and cost. Apart from the construction industry fragmentation and its difficulties imposed on project management, this type of project faces some additional challenges, such as difficulties in optimising the design solution in a …
-
Transport and Transfer of Total Dissolved Gases in the Lower Columbia River Hydropower System
… of TDG can be challenging, particularly in river systems with multiple dams, as this requires investigation of complex physical processes related to gas transfer and dissolved gas generation in dam spillways as well as its transport, mixing and dissipation in riverine environment. This research …
-
Empirical comparisons of system analysis modeling techniques
The development of information systems consumes an increasing share of economic resources. Over a trillion dollars worldwide is invested in information technology annually, and this investment is growing over $100 billion a year. This investment occurs despite failure rates for large information …
-
Organizace projektu výstavby
Téma bakalářské práce je Organizace projektu výstavby. Teoretická část práce je zaměřena na přiblížení základních pojmů projektového řízení. Praktická část se zabývá organizací projektu výstavby, který je celý financován z vlastních zdrojů. Zaměřuje se na jednotlivé kroky v předinvestiční fázi …
-
Podnikatelský záměr
Tato diplomová práce se zabývá návrhem podnikatelského záměru firmy SITEC, s.r.o., která je vlastněná nadnárodní společností GlobSol Corporation. Cílem této práce je na základě analýz posoudit podnikatelský projekt, zaměřený na definici předpokladů pro rozšíření podnikatelských aktivit firmy a …
-
Integrované projektování chytrého domu, budovy
Cílem této diplomové práce je vytvoření metodické příručky projektanta systémové elektroinstalace v chytrých/inteligentních domech. Úvodní část práce zdůrazňuje potřebu integrace systémů v inteligentní budově s nutností jejich vzájemné spolupráce a komunikace. Základem integrace je vhodně zvolený …
-
Project management of construction companies
… to the object of management is the concept of project management, which is widespread in all developed countries Project management is an internationally recognized methodology for project and entrepreneurial activities. It practically began to act as a standard in the implementation of a wide …