Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 3 of 3 for “"schedule acceleration"”.

  1. Optimized Scheduling of Repetitive Construction Projects under Uncertainty

    … lead to misleading and/or unachievable project schedules. Many attempts have been made in the past to account for uncertainty during planning for construction projects and many tools and techniques were presented to facilitate modelling of such uncertainty. Some of the presented techniques are …

    concordia Download PDF for Optimized Scheduling of Repetitive Construction Projects under Uncertainty (opens in a new tab)

  2. Integrated Daily Windows and But-For Analyses for Accurate Schedule Forensics in Construction Projects

    … constrained environments that frequently cause schedule delays and cost overruns and lead to disputes among parties. To mitigate such disputes and fairly apportion delay responsibility among parties, forensic schedule analysis becomes necessary. Each schedule analysis technique has its unique …

    waterloo Repository record for Integrated Daily Windows and But-For Analyses for Accurate Schedule Forensics in Construction Projects (opens in a new tab)

  3. Multi-objective optimization for resource driven scheduling in construction projects

    … to (1) provide efficient resource utilization schedules that are capable of directly measuring and minimizing the negative impacts of resource fluctuations in construction projects; (2) analyze and optimize the impact of schedule acceleration strategies such as the utilization of multiple …

    uiuc Repository record for Multi-objective optimization for resource driven scheduling in construction projects (opens in a new tab)