Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 53 for “"schedule control"”.

  1. Cost/schedule control for environmental projects

    Includes bibliographical references.

    colo-mines Repository record for Cost/schedule control for environmental projects (opens in a new tab)

  2. Bus service design and schedule control

    … system), punctuality (limited deviations from schedule), and acceptable travel time for all passengers at reasonable costs for providing service. Many factors can impact the design and schedule of public transit systems (e.g. physical/geographical constraints, socio-economic and environmental …

    uiuc Repository record for Bus service design and schedule control (opens in a new tab)

  3. Cost/Schedule Control Criteria for Selected Government Contracts

    This report presents and interprets the Cost/Schedule Control System Criteria, management techniques which have been determined by the Department of Defense to represent appropriate methods for adequately controlling program costs and schedules. Applied to selected contracts of significantly large …

    ucf Repository record for Cost/Schedule Control Criteria for Selected Government Contracts (opens in a new tab)

  4. The Ripple Effect Of Schedule Control: A Social Network Approach

    I propose a model of schedule control that investigates the potential ripple effects of the schedule control of an individual's direct ties and peers on his or her individual outcomes across two networks. Drawing on relative deprivation theory, I argue that individuals with relatively less schedule …

    cornell Repository record for The Ripple Effect Of Schedule Control: A Social Network Approach (opens in a new tab)

  5. Procuring contracting officer's guide to Cost/Schedule Control Systems Criteria (C/SCSC)

    … role in implementing and administering Cost/Schedule Control Systems Criteria (C/SCSC) within the Department of Defense. The purpose of this study was to develop a practical guide to C/SCSC for the PCO to use as a ready reference while on the job or in a training environment. As such, some …

    nps Repository record for Procuring contracting officer's guide to Cost/Schedule Control Systems Criteria (C/SCSC) (opens in a new tab)

  6. A "Holy Grail" of Work and Family Life? When and How Schedule Control Functions as a Resource

    Schedule control is a job resource used to determine the timing of paid work and has been touted as a “holy grail” among work-family scholars and practitioners. While prior research has demonstrated that schedule control is linked with better work-life balance and health, it may not be an …

    toronto-retro Repository record for A "Holy Grail" of Work and Family Life? When and How Schedule Control Functions as a Resource (opens in a new tab)

  7. Cost and schedule control management: what the Department of Defense major acquisition system program manager needs to know

    … to bring about better programmatic cost and schedule control for major defense acquisitioin programs. thus, it is imperative for the DoD major system program manager to achieve a thorough understanding of cost and schedule control management and apply these principles to management decision …

    nps Repository record for Cost and schedule control management: what the Department of Defense major acquisition system program manager needs to know (opens in a new tab)

  8. An Analysis of the Effects of Delay of Reinforcement and Momentary Probabilities of Reinforcement on Interval Schedule Performance

    … experiments pigeons were exposed to VI and FI schedules and schedules approximating both VI and FI schedules. In experiment I, the probabilities of the VI and FI components in a Mixed FI VI schedule were manipulated to create schedule contingencies approximating simple VI or FI. In experiment …

    utahstate Repository record for An Analysis of the Effects of Delay of Reinforcement and Momentary Probabilities of Reinforcement on Interval Schedule Performance (opens in a new tab)

  9. Concurrent Schedule Performance with Young Infants

    … sessions often are conducted in demonstrating schedule control over the response. However, extinction sessions are often accompanied by disruptive behaviors which terminate experimental sessions. Concurrent reinforcement schedules provide a methodology for demonstrating schedule control over …

    drake Repository record for Concurrent Schedule Performance with Young Infants (opens in a new tab)

  10. Exploring Flexible Working and Parenting Styles among Working Parents in the UK

    … reduced<br/>hours—as well as different levels of schedule control, are related to parenting styles. The<br/>urgency to continue exploring this field is highlighted by the popularity of flexible working, particularly accelerated by the COVID-19 pandemic, and the need to understand …

    bristol Repository record for Exploring Flexible Working and Parenting Styles among Working Parents in the UK (opens in a new tab) Download PDF for Exploring Flexible Working and Parenting Styles among Working Parents in the UK (opens in a new tab)

  11. A Development of Performance Metrics for Forecasting Schedule Slippage

    Project schedules should mirror the project, as the project takes place. Accurate project schedules, when updated and revised, reflect the actual progress of construction as performed in the field. Various methods for monitoring progress of construction are successful in their representation of …

    vt Repository record for A Development of Performance Metrics for Forecasting Schedule Slippage (opens in a new tab)

  12. The organizational impact of C/SCSC upon the Supervisor of Shipbuilding

    Developing a management control system that will meet the needs of the government and its contractors has been a difficult task, particularly in shipbuilding. Only two Supervisors of Shipbuilding, SUPSHIPS Bath and Groton, have been involved with the implementation of the Cost/Schedule Control …

    nps Repository record for The organizational impact of C/SCSC upon the Supervisor of Shipbuilding (opens in a new tab)

  13. An Evaluation of Public Construction Contracting Methods for the Public Building Sector in Oregon using Data Envelopment Analysis

    … that differ from DBB projects regarding cost and schedule control? Are CMl/GC projects more efficient than DBB projects, where efficiency is defined as the data envelopment analysis (DEA) technical efficiency score? Does efficiency depend on an interaction between project type and the selection …

    portland-state Repository record for An Evaluation of Public Construction Contracting Methods for the Public Building Sector in Oregon using Data Envelopment Analysis (opens in a new tab)

  14. A feasibility analysis of implenting [i.e. implementing] C/SCSC concepts at U.S. Army depots

    … thesis analyzes the feasibility of using Cost/Schedule Control Systems Criteria (C/SCSC) concepts at U.S. Army Depots. C/SCSC compliance is commonly used by the defense industry when contracting with the U.S. Government for large production and R&D (research & development ) programs. However, …

    nps Repository record for A feasibility analysis of implenting [i.e. implementing] C/SCSC concepts at U.S. Army depots (opens in a new tab)

  15. Family Linked Workplace Resources and Contextual Factors as Important Predictors of Job and Individual Well-being for Employees and Families

    … unit-level work-family resources (e.g., FSSB and schedule control), and individual well-being. Results revealed that positive supervisor views about flexible work arrangements (FWA) for employees was associated with higher unit levels of FSSB, and that unit level FSSB and schedule control were …

    portland-state Repository record for Family Linked Workplace Resources and Contextual Factors as Important Predictors of Job and Individual Well-being for Employees and Families (opens in a new tab)

  16. Refrainment from sexual interaction by male rats

    Cole, Coll, and Schoenfeld developed a self-control paradigm in 1982, which is based upon refrainment from consumption during the presentation of a reinforcer. Their paradigm has been shown to be successful in training pigeons and rats to refrain from food consumption and rats to refrain from …

    u-pacific Repository record for Refrainment from sexual interaction by male rats (opens in a new tab)

Page 1 of 3