Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 8 of 8 for “"schedule overrun"”.

  1. Distributed new product development structures and schedule overrun

    … of new product distributed structures and schedule overrun. Data on 75 projects undertaken by Cisco Systems using distributed structures to develop new products were used to test four hypotheses. The hypotheses examined how (i) the proportion of the product design produced at project …

    carleton Repository record for Distributed new product development structures and schedule overrun (opens in a new tab)

  2. Quantifying Causes, Schedule, and Cost Impacts of Change Orders: "Is Alternative Contracting Really Effective?"

    … the project in aspects of project cost and schedule. The main purpose of this study is to carefully examine the influences of change orders in infrastructure development projects in the schedule and cost aspects. The aim of this study starts with collecting Florida Department of …

    tamu Repository record for Quantifying Causes, Schedule, and Cost Impacts of Change Orders: "Is Alternative Contracting Really Effective?" (opens in a new tab)

  3. A systematic approach for identifying fundamental successes and failures on complex product development programs

    … the root causes of the program’s considerable schedule overrun. This included developing an approach for untangling the program’s non-intuitive behaviour and identifying the fundamental successes and failures of its execution. A mixed-methods research design incorporating quantitative and …

    concordia

  4. Causes of Construction Delays for High Rise Buildings: a Quantitative Comparison between the USA and India

    … to construction delays. Delays can lead to time overrun, affect the total project duration and the total cost, and could result in litigation. Most construction schedules are deterministic and do not include the uncertainty and risk inherent in the diverse activities which constitute the …

    ndsu Repository record for Causes of Construction Delays for High Rise Buildings: a Quantitative Comparison between the USA and India (opens in a new tab)

  5. Decision Making and Uncertainty Analysis in Success of Construction Projects

    This study identifies key construction cost and schedule performance determinants related to project general characteristics, specific features, and construction best practices for heavy industrial projects. This research examines the relationship between factors corresponding to each phase of a …

    tamu Repository record for Decision Making and Uncertainty Analysis in Success of Construction Projects (opens in a new tab)

  6. Bookkeeping Procedures for the Application of the Concept of Pre-Allocation of Total Float

    … in construction projects, monitoring project schedule and managing projects effectively is becoming increasingly important. Most projects being deadline oriented, timely completion becomes a must. Like every industry, the construction industry too lays a lot of emphasis on timely completion …

    vt Repository record for Bookkeeping Procedures for the Application of the Concept of Pre-Allocation of Total Float (opens in a new tab)

  7. Cost of using building information modeling (BIM) in retrofit projects

    … with reduced change orders and reduced schedule overruns. A cost analysis has been performed using the cost benefits and the fees required for implementing BIM in a retrofit project. The research shows that the use of BIM has prevented five change orders in the real-life project. The …

    colostate Repository record for Cost of using building information modeling (BIM) in retrofit projects (opens in a new tab)