Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 35 for “"schedule quality"”.

  1. Collection of schedule quality metrics and application to projects of the office of facilities planning and construction (OFPC)

    … plan is essential to execute them successfully. Schedules play a key role as a roadmap that shows how and when a project delivers its products defined in the project scope (PMI 2007). In an effort to facilitate scheduling process, diverse scheduling software programs have been developed and used. …

    texas Repository record for Collection of schedule quality metrics and application to projects of the office of facilities planning and construction (OFPC) (opens in a new tab)

  2. Scheduling and Admission Control

    … consumption depending on the speeds selected. If schedule quality is measured with makespan, we give linear-time algorithms to compute all non-dominated solutions for the general uniprocessor problem and for the multiprocessor problem when every job requires the same amount of work. We also show …

    uiuc Repository record for Scheduling and Admission Control (opens in a new tab)

  3. Job shop scheduling to minimize work-in-process, earliness and tardiness costs

    … from different customers. A good production schedule is required to complete the orders on time with the limited resources and minimize the relevant costs. Such a scenario is modelled as a job shop problem with non-regular performance measure (shorted as JIT-JSP). The objective of JIT-JSP is …

    nus Repository record for Job shop scheduling to minimize work-in-process, earliness and tardiness costs (opens in a new tab) Download file for Job shop scheduling to minimize work-in-process, earliness and tardiness costs (opens in a new tab)

  4. Static-task scheduling incorporating precedence constraints and deadlines in a heterogeneous-computing environment / Michael D Niedert

    … dependency constraints. Tradeoffs of speed and schedule quality were noted between the algorithms. The greedy algorithm produced results quicker than the A* and simulated annealing algorithms, but with a lower schedule quality. Because of these offsetting performance criteria, an analysis was …

    nps Repository record for Static-task scheduling incorporating precedence constraints and deadlines in a heterogeneous-computing environment / Michael D Niedert (opens in a new tab)

  5. FORMULATING AND EVALUATING OPTIMIZATION MODELS FOR ACADEMIC SCHEDULING AT THE NAVAL POSTGRADUATE SCHOOL

    … introducing regularization strategies to improve schedule quality. Model inputs are based on historical scheduling data, and results are assessed using metrics that reflect student coverage, room usage, and alignment with faculty needs. Multiple modeling approaches are compared, and performance is …

    nps Repository record for FORMULATING AND EVALUATING OPTIMIZATION MODELS FOR ACADEMIC SCHEDULING AT THE NAVAL POSTGRADUATE SCHOOL (opens in a new tab)

  6. Measuring performance and determining success factors of construction sites

    … were measured from the standpoints of cost, schedule, quality, and safety. Specific measurement methods were developed for each elements. The measurement process included a procedure for feedback to sites and company units, and the performance measurement system was therefore also a …

    aalto Repository record for Measuring performance and determining success factors of construction sites (opens in a new tab)

  7. Analysis of a Construction Small-Projects Rework Reduction Program for a Capital Facility

    … performance in terms of productivity, cost, schedule, quality, and safety. While existing rework reduction programs and much literature exist concerning this challenge, there is a need for further analysis and continuous improvement of rework reduction methods. Based on such an analysis, this …

    waterloo Repository record for Analysis of a Construction Small-Projects Rework Reduction Program for a Capital Facility (opens in a new tab)

  8. ESTABLISHING STANDARDIZED METRICS FOR THE ACQUISITION OF SERVICES PATHWAY

    … seven foundational metrics covering cost, schedule, quality, customer satisfaction, and compliance, enabling enterprise reporting while allowing category-specific tailoring. The Enterprise Performance Visibility (EPV) model and a Flexible Balanced Scorecard (FBS) are introduced to …

    nps Repository record for ESTABLISHING STANDARDIZED METRICS FOR THE ACQUISITION OF SERVICES PATHWAY (opens in a new tab)

  9. A Robust Reactive Scheduling System with Application to Parallel Machine Scheduling

    … or paper work in a company. The goal of each schedule is to optimize some performance measures, which could be the minimization of the schedule makespan, the jobs' completion times, jobs' earliness and tardiness, among others. Until very recently, research has concentrated on scenarios that …

    odu Repository record for A Robust Reactive Scheduling System with Application to Parallel Machine Scheduling (opens in a new tab)

  10. Increasing engagement with the supply chain to improve the performance of power sector projects

    … chain is an opportunity to improve project cost, schedule, quality, and safety. In that context, this research wants to identify opportunities that can improve the engagement with the supply chain in power projects and understand the potential of those opportunities to improve the project …

    texas Repository record for Increasing engagement with the supply chain to improve the performance of power sector projects (opens in a new tab)

  11. STRATEGIC PROGRAM DELIVERY METHODS: BENEFITS AND CHALLENGES

    … performance opportunities in terms of cost, schedule, quality, risk management, and other performance metrics. Developing an effective strategic plan by incorporating these diverse delivery options is critical to the success of the program. The aim of this thesis is to explore the use of …

    ku Repository record for STRATEGIC PROGRAM DELIVERY METHODS: BENEFITS AND CHALLENGES (opens in a new tab)

  12. Benefits and Barriers of Offsite Construction in Hospital Projects

    … want to save time and money and increase the quality and safety of their projects. Owners continue to look towards alternate building methods to realize these benefits on their construction projects. One area that project owners continue to look at is modular construction. This study set out …

    washington Repository record for Benefits and Barriers of Offsite Construction in Hospital Projects (opens in a new tab)

  13. Applications of information theory in filtering and sensor management

    … is analyzed in the context of generating sensor schedules for monitoring resident space objects (RSOs). This approach, namely maximizing the expected Kullback-Leibler divergence in a measurement update, is evaluated from a probabilistic perspective to determine the accuracy of the conventional …

    must-thes Repository record for Applications of information theory in filtering and sensor management (opens in a new tab)

  14. The true impact of late deliverables at the construction site

    … types of late deliverables affect the cost, schedule, quality, safety, and organizational performance of industrial construction projects. Using case studies, industry surveys and questionnaires, existing literature, and internal team expertise, RT 300 developed two research thrusts: …

    texas Repository record for The true impact of late deliverables at the construction site (opens in a new tab)

  15. The Human Factor Imperative Effect on Projects’ Success

    … do many projects fail to meet targets of budget, schedule, quality or performance in spite of the fact that management methods and techniques are widely available, applied science and technologies are rapidly improving and advancing? Research has shown that a large number of projects were managed …

    calgary Repository record for The Human Factor Imperative Effect on Projects’ Success (opens in a new tab)

  16. New models for operations planning under risk and uncertainty

    … feasible machine assignments. A new metric for schedule quality is introduced that considers the tradeoff between the risk of imperfect production and overall production time requirements. We develop a mathematical model and two solution approaches that determine schedules that are superior to …

    alabama Repository record for New models for operations planning under risk and uncertainty (opens in a new tab)

  17. ICT Project Management Practice : Project Charter

    … project success indicators: budget/cost, time/schedule, quality/scope). We present results of empirical research surrounding the proposal that project outcomes can be improved by using a Project Charter as an instrument for both communication and authorisation. Two hypotheses for identifying …

    unsw Repository record for ICT Project Management Practice : Project Charter (opens in a new tab)

  18. Ship scheduling with time-varying draft restrictions: a case study in optimisation with time-varying costs

    … problems can significantly improve schedule quality, allowing more cargo to be carried on the same set of ships and reducing shipping costs. Finally, this thesis also considers issues beyond time-varying draft restrictions in the maritime industry, and investigates approaches in the …

    anu Repository record for Ship scheduling with time-varying draft restrictions: a case study in optimisation with time-varying costs (opens in a new tab)

  19. Grid-centric scheduling strategies for workflow applications

    … based on our experiments, which can improve the schedule quality of some scheduling algorithms as much as 20 fold in a multi-cluster Grid environment. Second, we studied the scalability of the existing Grid scheduling algorithms. To deal with Grid systems consisting of hundreds of thousands of …

    rice Repository record for Grid-centric scheduling strategies for workflow applications (opens in a new tab)

  20. A System Dynamics and Network Analysis of the Interactions Between Factors Affecting the Implementation of Integrated Project Delivery in New Zealand

    … in construction projects. IPD aims to improve schedule, quality, cost, and safety while promoting positive collaboration based on mutual respect and trust. Despite the abundance of literature on IPD, a comprehensive analysis of the interactions between factors and their implementation has yet …

    auckland-tech Repository record for A System Dynamics and Network Analysis of the Interactions Between Factors Affecting the Implementation of Integrated Project Delivery in New Zealand (opens in a new tab)

Page 1 of 2