Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 4 of 4 for “"schedule-delay cost"”
-
CRUISER MODERNIZATION: AN ORGANIZATIONAL KNOWLEDGE CAPTURE
… insufficient knowledge transfer contributed to cost growth, schedule delay, rework, and delivery of non-operational capability. The background is the Navy’s cruiser modernization effort where compressed schedules, limited shipyard capacity, firm-fixed-price contracting pressures, and fragmented …
-
A Decision Support System for Dynamic Integrated Project Scheduling and Equipment Operation Planning
… under limited resource availability is to first schedule activities with the assumption of unlimited resources, and then assign required resources to activities until available resources are exhausted. The process of matching a feasible resource plan with a feasible schedule is called resource …
-
Essays on the effectiveness of environmental and urban transportation policies
… public charging facility would be more cost-effective. It estimates a discrete choice model of EVs which relies on both EV characteristics and individual demographic information, using micro-level data from the California Clean Vehicle Rebate Program. Results show: (1) EVs with smaller …
-
Optimized Time-dependent Congestion Pricing System for Large Networks: Integrating Distributed Optimization, Departure Time Choice, and Dynamic Traffic Assignment in the Greater Toronto Area
… resulting in improved average travel times and schedule delays at all scales, (4) tolled routes have different sensitivities to identical toll changes, (5) the start times of longer trips are more sensitive (elastic) to variable distance-based tolling policies compared to shorter trips, (6) …