Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 20 of 28 for “"secondary beam"”

  1. Isotope Harvesting at Heavy-Ion Fragmentation Facilities

    … (NSCL) to the Facility for Rare Isotope Beams (FRIB) usable quantities of many isotopes of interest will be produced and available for harvest from an aqueous beam dump. If available, these isotopes would be of interest to a broad range of applications such as medicine, geology, and …

    wustl Repository record for Isotope Harvesting at Heavy-Ion Fragmentation Facilities (opens in a new tab)

  2. The design and operation of a completely automated liquid hydrogen or deuterium target

    … at TRIUMF. The system is designed for use in secondary beam lines. The refrigerative system utilizes a CTI Cryodyne 1020 refrigerator capable of 10 watts at 20 K. The flask assembly, with a volume of 1 litre (extendable to 7 litres) is made of Mylar surrounded with 20 layers of …

    ubc Repository record for The design and operation of a completely automated liquid hydrogen or deuterium target (opens in a new tab)

  3. Kaon tagging system and measurement of the \(K^+\rightarrow\pi^+ \gamma \gamma\) decay at the NA62 experiment at CERN

    … of identifying the kaon component in the NA62 secondary beam, is presented. The sub-detector is shown to meet the efficiency requirements during all the 2016-2018 data-taking.

    birmingham Repository record for Kaon tagging system and measurement of the \(K^+\rightarrow\pi^+ \gamma \gamma\) decay at the NA62 experiment at CERN (opens in a new tab)

  4. Design, construction, and commissioning of the time-of-flight detector for BNL-AGS Experiment 896

    … The analysis of data from a 1997 heavy ion beam run and a 1997 secondary beam run are discussed. The best method to estimate the location of the minimum ionizing peak of the ADC distribution was found among several different methods. Two different methods to slew correct the TDC data are …

    rice Repository record for Design, construction, and commissioning of the time-of-flight detector for BNL-AGS Experiment 896 (opens in a new tab)

  5. Universalių prekių parduotuvė su sandėliu Pramonės g /

    … PK 12-60 and a metal grate, which consists of secondary beam and main beam (MS-1) is designed in the second part. The amounts of performed work, localized estimate are calculated in the third part. The heating system of the part of building is designed in the forth part- warmth resistance of …

    vilnius Repository record for Universalių prekių parduotuvė su sandėliu Pramonės g / (opens in a new tab)

  6. Analysis and Design of Semi-Continuous Sway and Non-Sway Frames

    … meaning bigger steel sections being used for the beams than are necessary.</p><p>Site monitoring of the first building to make use of the semi-continuous design approach was conducted. The monitoring covered a primary and secondary beam during the construction and later loading of the structure. …

    soton Repository record for Analysis and Design of Semi-Continuous Sway and Non-Sway Frames (opens in a new tab)

  7. Beta-delayed proton emission of magnesium-20 and the RCMP silicon detector array

    … for isotopes near proton drip line. The main secondary beam was ²²Si while other exotic beam such as ²⁰Mg,²²Al,²³Si was also produced. The delayed particle emission from ²⁰Mg is of particular interest in this thesis and has been studied in details. In 2018, Dr.Gwen Grinyer's group at …

    regina Repository record for Beta-delayed proton emission of magnesium-20 and the RCMP silicon detector array (opens in a new tab)

  8. Behaviour and Design of Composite Metal Deck Diaphragms Subjected to In-plane Shear Forces

    … these loads to other structural members, such as beams, walls and columns. Moreover, they play a key role in the distribution of lateral loads into the structural system and through to the foundations. Lateral loads caused by earthquake accelerations and deformations generate in-plane shear …

    auckland-ms Repository record for Behaviour and Design of Composite Metal Deck Diaphragms Subjected to In-plane Shear Forces (opens in a new tab)

  9. Simulation of steel/concrete composite structures in fire.

    … parametric studies including slab thickness and secondary beam connection strength and stiffness. The concrete floor slab element has also been extended to a layered flat shell element allowing the inclusion of material non-linearities, thermal bowing, thermal degradation, anisotropic properties …

    whiterose Repository record for Simulation of steel/concrete composite structures in fire. (opens in a new tab)

  10. Recoil Distance Method lifetime measurements via gamma-ray and charged-particle spectroscopy at NSCL

    … knockout reaction of a <super>19</super>N secondary beam. De-excitation gamma rays were detected with the Segmented Germanium Array in coincidence with reaction residues at the focal plane of the S800 Magnetic Spectrometer. The deduced <italic>B(E2)</italic> and excitation energy were both …

    msu

  11. The search for cluster structure in 14C with the prototype AT-TPC

    … Projection Chamber (AT-TPC). A 38.2 MeV secondary beam of <super>10</super>Be was incident on an active target volume containing He:CO<sub>2</sub> 90:10 gas at 1 atm, in which trajectories of beam particles and reaction products were measured using the tracking capabilities of the …

    msu Repository record for The search for cluster structure in 14C with the prototype AT-TPC (opens in a new tab)

  12. Accelerator systems and instrumentation for the NuMI neutrino beam

    … Neutrinos at the Main Injector (NuMI) neutrino beam facility began operating at the Fermi National Accelerator Laboratory in 2005. NuMI produces an intense, muon-neutrino beam to a number of experiments. Foremost of these experiments is MINOS – the Main Injector Neutrino Oscillation Search – …

    texas Repository record for Accelerator systems and instrumentation for the NuMI neutrino beam (opens in a new tab)

  13. Development of a Mechanically Correct Fire Resistance Design Process for Composite Floor systems in Buildings

    … takes into consideration the presence of a secondary downstand steel beam which was left unprotected against elevated temperatures. The main objectives of this study were: 1. to examine the mechanics of tensile membrane action of composite slabs in the presence of an unprotected secondary …

    whiterose Repository record for Development of a Mechanically Correct Fire Resistance Design Process for Composite Floor systems in Buildings (opens in a new tab)

  14. Ý decay and isomeric studies of proton rich nuclei near the endpoint of the rp-process

    … NSCLin order to purify rare neutron-deficient secondary beams. The implementation of this device has made a number of beta-decay experiments feasible at the NSCL. The experiment described in this work (NSCL Experiment 07034) was the second one to utilize the RFFS to successfully determine …

    msu

  15. Seismic Assessment and Retrofit of Concrete Encased Riveted Steel Buildings in New Zealand

    … of floor slabs integral with their supporting beams were not well documented and probably not well understood. Examples of these structures can be found throughout the cities and towns of New Zealand and many are quite prestigious, in full service and often enjoying heritage status. Developing …

    auckland-ms Repository record for Seismic Assessment and Retrofit of Concrete Encased Riveted Steel Buildings in New Zealand (opens in a new tab)

  16. Developing Techniques for High Fidelity Studies of Reactions with Light Weakly Bound Nuclei

    … years with the availability of radioactive ion beams and exotic nuclei near the drip line. As a result, new phenomena are being discovered in areas of nuclear reactions and nuclear structure. This thesis work is focused on studies of reaction mechanisms of light weakly bound nuclei at energies …

    anu Repository record for Developing Techniques for High Fidelity Studies of Reactions with Light Weakly Bound Nuclei (opens in a new tab)

  17. Administrativní centrum

    Diplomová práce se zabývá návrhem a posouzením ocelové konstrukce administrativní budovy. Budova se nachází ve městě Svitavy. Konstrukce je řešena jako několikapatrový objekt s půdorysem tvaru písmene L. Ve vyšších patrech má budova pouze tvar obdélníkový. Vnější půdorysné rozměry objektu jsou 55,2 …

    brno-tech Repository record for Administrativní centrum (opens in a new tab)

  18. Administrativní budova

    Předmětem diplomové práce je návrh a posouzení ocelové konstrukce administrativní budovy ve Valašském Meziříčí. Půdorysné rozměry objektu jsou 55,5 x 30,0 m. Délka objektu se postupně s každým patrem zvyšuje. Budova má 8 nadzemních podlaží. Celková výška objektu je 33,6 m. Stropy objektu tvoří …

    brno-tech Repository record for Administrativní budova (opens in a new tab)

  19. Nákupní centrum v Brně

    Cieľom diplomovej práce je návrh a posúdenie nosnej oceľovej konštrukcie nákupného centra situovaného v Brne. Vypracované boli tri varianty, z ktorých bola vybraná jedna pre podrobnejšie spracovanie. Varianty majú šesťuholníkový pôdorys s maximálnym rozmerom 60,0 m, štyri nadzemné podlažia a …

    brno-tech Repository record for Nákupní centrum v Brně (opens in a new tab)

  20. Patrová budova s atriem

    Diplomová práce se zabývá návrhem ocelové nosné konstrukce patrové budovy s atriem o pěti nadzemních podlažích. Objekt se nachází v lokalitě Blansko a jeho půdorysné rozměry jsou 32,5 x 56 m a maximální výška objektu je 23,2 m. Výška podlaží je 4 m. Nosná konstrukce patrové budovy je řešena …

    brno-tech Repository record for Patrová budova s atriem (opens in a new tab)

Page 1 of 2