Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 20 of 31 for “"site assembly"”
-
Exploration of prefabricated concrete construction with a focus on environmental sustainability and circular economy principles.
… This study examines the differences between on-site assembly and disassembly practices of prefabricated concrete construction and circular economy principles. The aim is to identify strategies that can increase on-site assembly efficiency while maintaining environmental sustainability. The study …
-
Investigating Accumulation of Tolerances and its Impact on Reliability of Job Site Installation
… components that have the greatest impact on job-site assembly. We discuss how to prevent breakdowns on future projects by restructuring work to enable predictable workflow and achieve better built-in quality. In particular, we explore how to introduce poka-yoke devices as well as changes in …
-
Automation & Customization: Rethinking Precast Design with Robotics and Modular Systems
… and DFMA (Design for Manufacturing and Assembly). It introduces a kit-of-parts for customizable foundation panels and a catalogue of modular, reusable formwork components—both developed through a DFMA process—to reduce material waste, labor, and production time. A closed-loop feedback …
-
Seismic performance evaluation of a special concrete core wall volumetric steel modular high-rise system
… is an emerging technique that enables rapid on-site assembly of prefabricated modular units into complete structures. The application of high-rise modular construction mainly uses prefabricated volumetric steel modular construction systems (PVSMCS). Currently, the use of high-rise PVSMCS in high …
-
Target Cost Modelling for Offsite Construction Projects
The fast-paced progress associated with offsite construction projects necessitates special attention toward project design, estimation, and planning. Traditionally, the relationship between project design and cost lacks clarity during the early design stages of a project. While design efforts aim …
-
General Motors Lordstown: A Simulation Impact Study on the Youngstown-Warren Economy
… improvements will begin with a change from on-site assembly to modular assembly of certain car components. Along with a new production technique, General Motor's will also build new plants to accomodate modular assembly. These announced plans threaten existing plants, many of which desperately …
-
Integrated production planning and control model for engineer-to-order prefabricated building systems
… the prefabrication plant with the construction site needs. This research project aims to develop an integrated planning and control production planning and control model for ETO prefabricated systems, integrating design, manufacturing and site assembly. The research is part of a partnership with …
-
Understanding Mitochondrial Dysfunction: The Role of Cox16 in Cytochrome <i>c</i> Oxidase Assembly
… of the respiratory chain, requires numerous assembly factors to control prosthetic group insertion (Cu and heme) and coordinated stepwise integration of multiple subunits into a functional enzyme. While the conserved inner membrane protein Cox16 has been implicated in C<i>c</i>O biogenesis, …
-
Life Cycle Carbon Assessment (LCCA) of modular buildings for northern Canada applications
… a viable and sustainable solution, enabling off-site prefabrication and rapid on-site assembly, with the potential to significantly reduce carbon emissions, construction costs, and housing shortages. The modular home envelope at Cambridge Bay, Nunavut, was the subject of a Life Cycle Carbon …
-
Developing a proof-of-concept non-scalable active vacuum insulated building envelope prototype
… use of cheaper materials and equipment for on-site assembly and evacuation of customizable, large (for example, a whole wall) active vacuum insulation panels (active-VIPs). Vacuum can be extended indefinitely through occasional reactivation of the vacuum pump. For the project described in this …
-
K-Joints of Double Chord Square Hollow Sections
… connection appears to hold promise when on-site assembly of large trusses is necessary. Its performance was further improved by connecting the chords with small tie bars. The back-to-back type needed to be reinforced or fully overlapped to develop full branch member strength. </p> <p> The …
-
Mitochondrial Metal Homeostasis: A Look into Iron and Copper Mobilization Within Mitochondria
… the core component of the mitochondrial contact site and cristae organizing system (MICOS) Mic60. The loss of Mic60 negatively impacts Hem15 activity, affects the size of the Hem15 high mass complex, and results in the accumulation of reactive and toxic tetrapyrrole precursors. Furthermore, using …
-
Residential construction manufacturing estimating framework: the case of lightweight timber framing
… construction was adopted by the offsite construction industry where the building components are prefabricated in factories and then transported to the construction site for on-site assembly. With this shift towards industrialized construction, new challenges were encountered, …
-
Estudo de pontes com vigas I segmentadas pré-fabricadas de concreto protendido, utilizando o sistema de pré-tração e pós-tração
… that the use of the preform in the place of the assembly, provides economy in the transport and the logistics of the same. These two factors become decisive factors in choosing the precast system most of the time, rather than the prefabricated one. The great problem in using prefabrication for …
-
Investigating the Influence of Beam Hanger Connection Rotational Stiffness on Glulam Column Design
… capacities in shear and allow for fast on-site assembly. In current design practice, a pinned condition is typically assumed for such beam-to-column joints. However, when frames deform horizontally under lateral loads, a bending moment can develop if the connection displays rotational …
-
A deconstructable grout-reinforced hybrid shear connector for tall cross-laminated timber buildings
… connection solutions that are conducive to off-site prefabrication, quick on-site assembly, and that can provide required seismic resistance without suffering damage, creating the potential for deconstruction and reuse. This research investigated the structural performance of a novel …
-
SYNERGISING WITH MANGROVE - THE UBIN CRAB FARM
… at the same time synergise with the nature. Site chosen is a brown field site so as minimise the environmental impact on the island. It also gives an opportunity for the proposed architecture to aid in increasing the biodiversity at the barren site. The program proposed for the thesis is a …
-
Simulation Modelling and Analysis of Impact of 3D Feedback Workflow on Prefabrication of Industrial Construction
… are unique, craft-based, and typically done on-site, manufacturing is able to mass produce standardized products on assembly lines in a controlled environment. Efforts to improve construction productivity take advantage of the more established and mature manufacturing processes and techniques, …
-
Design, Manufacture, and Assembly of Structural Building Components Produced via Large-Scale Additive Manufacturing of Recycled Polymer Composites
… the thesis presents the design, manufacture, and assembly of building components fabricated from recycled polymers using the Cincinnati BAAM 603 system. Building on prior MIT HAUS work on foundations and trusses, this work began with the design, manufacture, and testing of a printed floor system. …
Page 1 of 2