Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 8 of 8 for “"spillway chute"”
-
Computer assisted analysis of flow over spillway chutes
… of flow over conventional and stepped type spillways. In guidance of this review, a software is developed to perform such analyses with the set of given data by the user, and display results with some tables and figures. To this end, water surface profile over the spillway face is determined …
-
Hydraulic Performance Evaluation of RCC Stepped Spillways with Sloped Converging Training Walls
… Roller compacted concrete (RCC) stepped spillways provide an effective solution to this problem. Increased flow requirements, urban constraints, and valley geometry call for convergent chute sections designed with sloped training walls. There are currently no generalized guidelines for …
-
Turbulence and air uptake at spillway ramp aerators.
… designed to eliminate cavitation in open channel spillway chute flows. The experimental work involves the use of a Laser system to measure the turbulent low structure on a spillway, ramp and jet system, and then to relate the turbulent flow structure to the rate of air entrainment in the aerator. …
-
Design of converging stepped spillways
Roller compacted concrete (RCC) stepped spillways are growing in popularity for providing overtopping protection for aging watershed dams with inadequate auxiliary spillway capacity and for the construction of new dams. Unobtainable land rights, topographic features, and land use changes caused by …
-
Semi-empirical assessment of plunge pool scour: two-dimensional application of Annandale's Erodibility Index Method on four dams in British Columbia, Canada, A
Rock scour downstream of dam foundations and spillways has become a significant dam safety concern in recent years. As design flood estimates increase and older infrastructure is expected to pass larger amounts of water, downstream river beds and plunge pools are subjected to progressively greater …
-
Reliability-based evaluation of concrete dams
… of two examples, the capacity of a wall in a spillway chute is analyzed. The result is that the wall can withstand approximately 20 % higher water levels than that resulting from design according to RIDAS. In the second example a dam, fulfilling the requirements in RIDAS, is analysed. The …
-
VN Bukoviny I - rekonstrukce
Bakalářská práce je dle zadání zpracována formou projektové dokumentace pro vydání společného povolení v souladu s přílohou č. 8 k vyhlášce č. 499/2006 Sb. na rekonstrukci stávajících objektů vodní nádrže Bukovina II. Projektová dokumentace je zpracována v rozsahu částí A až D. Nádrž se nachází v …
-
Od myšlenky přes realizaci až po dlouholeté užívání rybníka Hastrman
Hlavním cílem této práce je popsat procesy výstavby od myšlenky, přes realizaci, až po dlouhodobé užívání rybníka Hastrman, který se nachází u obce Bohdalov, okres Žďár nad Sázavou. Práce zahrnuje zhodnocení technického stavu rybníka po téměř deseti letech jeho provozu včetně údržby a funkčnosti …