Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 18 of 18 for “"stage construction"”.

  1. Rethinking Early-Stage Construction Planning Using Virtual Reality and Point Cloud Processing

    Construction planning is inherently complex, requiring practitioners to define scope, determine feasible execution sequences, and evaluate cost and resource implications. These challenges are amplified in early-stage planning, where decisions made under high uncertainty can significantly impact …

    waterloo Repository record for Rethinking Early-Stage Construction Planning Using Virtual Reality and Point Cloud Processing (opens in a new tab)

  2. Multi-Stage Construction of the Little Cottonwood Stock, Utah: Origin, Intrusion, Venting,Mineralization, and Mass Movement

    … the same mineralized phreatomagmatic system.The construction of the pluton began with intrusion of the Little Cottonwood stock, then the White Pine and Red Pine magmas. Fluid exsolution from the Red Pine magma accompanied venting, inception of the mineralizing hydrothermal system, and quenching …

    byu Repository record for Multi-Stage Construction of the Little Cottonwood Stock, Utah: Origin, Intrusion, Venting,Mineralization, and Mass Movement (opens in a new tab) Download PDF for Multi-Stage Construction of the Little Cottonwood Stock, Utah: Origin, Intrusion, Venting,Mineralization, and Mass Movement (opens in a new tab)

  3. On error correcting codes for distributed storage

    … we have some modified layered codes in a two stage construction that gives regenerating codes with small field size. For more general parameters we define a Johnson graph code as a subspace of labelings of the vertices in a Johnson graph with the property that labelings are uniquely determined …

    uiuc Repository record for On error correcting codes for distributed storage (opens in a new tab)

  4. Finite element analysis of embankments on soft ground incorporating reinforcement and drains.

    … and an additional analysis of an idealized two-stage constructed embankment, simple design procedures have been proposed. Firstly, a method for the design of single stage embankments and, secondly, a method for the calculation of subsoil strength increases in multi-stage construction, which can …

    whiterose Download PDF for Finite element analysis of embankments on soft ground incorporating reinforcement and drains. (opens in a new tab)

  5. Analysis and design of precast/prestressed concrete spliced-girder bridges

    … of the current practices in the design and construction of spliced-girder bridges was conducted. Based on the results of this survey, the state-of-the-art of these bridges is reported here. The techniques used to field splice the girder segments to achieve a continuous multispan bridge are …

    nebraska Repository record for Analysis and design of precast/prestressed concrete spliced-girder bridges (opens in a new tab)

  6. Time-dependent analysis of partially prestressed composite members

    … within the scope of the proposed method. Second stage post-tensioning can be introduced to the members to make them a continuous beam or frame. The procedure accounts for cracking under the weight of cast-in-place topping, any superimposed loads and the time-dependent stress redistribution. Thus, …

    nebraska Repository record for Time-dependent analysis of partially prestressed composite members (opens in a new tab)

  7. Continuity development between precast beams using prestressed slabs, and its effect on flexure and shear

    … load. Although secondary effects and the two stage construction of such a slab tend to increase the prestress requirement for the slab, the same two effects considerably reduce the positive midspan moments, resulting in a decrease in the prestress required in the precast beams (and thus a …

    whiterose Download PDF for Continuity development between precast beams using prestressed slabs, and its effect on flexure and shear (opens in a new tab)

  8. Development of a ring expansion approach toward (±)-Phyllantidine, ring expansion of tetramic acids to N-oxy-2,5-diketopiperazines, and total synthesis of (+)-Raistrickindole A.

    … This method allows for the facile and late-stage construction of the N-O bond and can thereby serve as a general method for accessing N-oxy-2,5-DKP-containing natural products. Herein we develop several model substrates with varying functionality around the tetramic acid ring, and describe …

    baylor Repository record for Development of a ring expansion approach toward (±)-Phyllantidine, ring expansion of tetramic acids to N-oxy-2,5-diketopiperazines, and total synthesis of (+)-Raistrickindole A. (opens in a new tab)

  9. Highway embankment design in Bangladesh

    … stability include the addition of geo-fabrics, stage construction, the use of geo-cells and pressure berms. The top of the embankment, or subgrade, acts as a platform for the pavement and whose properties are the input for pavement design. To assist the pavement design process therefore, a …

    birmingham Download PDF for Highway embankment design in Bangladesh (opens in a new tab)

  10. Opacity Verification and Fault Diagnosis in the Framework of Switching Output Automata

    … building an observer automaton through subset construction, and finally reducing opacity to reachability analysis. This approach achieves decidability without the severe restrictions required for timed automata, keeping complexity within the observer-based determinization profile familiar from …

    cagliari Repository record for Opacity Verification and Fault Diagnosis in the Framework of Switching Output Automata (opens in a new tab)

  11. Serious game como ferramenta educativa para o cuidado à pessoa no pré e pós-operatório de confecção de estomia intestinal

    … cross-sectional approach, carried out in three stages: scope review and interview with hospital care nurses; content validation; and evaluation of technical and pedagogical aspects. In the first stage, a scope review and research were carried out with hospital care nurses, collecting information …

    brazil-ufrn Repository record for Serious game como ferramenta educativa para o cuidado à pessoa no pré e pós-operatório de confecção de estomia intestinal (opens in a new tab)

  12. Design decisions towards minimising construction waste : improving the building design stage decision-making process through enhanced information sharing

    … process during the building design stage in the Australian construction industry to minimise construction waste (CW). Employing a sequential multi-phase mixed methods approach, this research introduced an integrated decision-making framework supported by decision-making theories. …

    adelaide Repository record for Design decisions towards minimising construction waste : improving the building design stage decision-making process through enhanced information sharing (opens in a new tab)

  13. Vision-Based Construction Activity Recognition Using Supervised and Self-Supervised Methods

    Tracking and monitoring the activities of construction entities, such as workers and equipment, on construction sites is crucial for assessing their performance and productivity. However, manual monitoring is demanding, time-consuming, and susceptible to inaccuracies. To this end, numerous …

    concordia Download PDF for Vision-Based Construction Activity Recognition Using Supervised and Self-Supervised Methods (opens in a new tab)

  14. Synthesis of Biologically Important C-glycosides from Simple C-glycosyl Alkenes

    … of C-glycoinositols, which pivots on late stage construction of the inositol ring. The strategy uses easily accessed 3,4-dialkoxy-4-enals as aldehyde partners for C-linked crotyltins. A ring closing metathesis (RCM) on the crotylation product gives a C-linked dioxygenated cyclohexene that …

    cuny-grad Repository record for Synthesis of Biologically Important C-glycosides from Simple C-glycosyl Alkenes (opens in a new tab)

  15. VINAŘSTVÍ MARCINČÁK NOVOSEDLY

    PREDMETOM TEJTO BAKALÁRSKEJ PRÁCE JE NÁVRH OBJEKTU / SKUPINY OBJEKTOV / VINÁRSTVA MARCINČÁK V OBCI NOVOSEDLY. BAKALÁRSKA PRÁCA PRIAMO NADVÄZUJE NA PREDMET AG032 – ATELIÉR ARCHITEKTONICKEJ TVORBY II (VÝROBNÉ STAVBY) A VOPRED VYPRACOVANÚ ARCHITEKTONICKÚ ŠTÚDIU. PROJEKT RIEŠI VÝSTAVBU SKUPINY OBJEKTOV …

    brno-tech Repository record for VINAŘSTVÍ MARCINČÁK NOVOSEDLY (opens in a new tab)

  16. Polyfunkční dům Olomouc Hněvotínská - stavebně technologický projekt

    Ve své diplomové práci jsem se zabýval vypracováním stavebně technologického projektu pro polyfunkční dům v Olomouci na Tabulovém Vrchu. Cílem práce je vybrat a vypracovat vhodné řešení stavby z hlediska finančních, časových a technických požadavků na základě technických podkladů poskytnutých …

    brno-tech Repository record for Polyfunkční dům Olomouc Hněvotínská - stavebně technologický projekt (opens in a new tab)

  17. Most přes železniční trať a řeku

    Diplomová práce se zabývá návrhem silničního mostu ve městě Most. Přemosťuje železniční trať a řeku Bílinu. Byly navrženy tři možné varianty jedna z variant byla vybrána a podrobněji zpracována. Řešenou variantou byl oblouk se zavěšenou předepnutou mostovkou trámového průřezu. Nosný prvek je …

    brno-tech Repository record for Most přes železniční trať a řeku (opens in a new tab)

  18. Most nad potokem Bystrice

    Předmětem diplomové práce je podrobný statický výpočet dodatečně předpjatého betonového silničního mostu přes potok Bystrica u Banské Bystrice na Slovensku. Most je součástí odbočné větve rychlostní komunikace R1. Prostorově zakřivený spojitý most má 9 polí. Pro statickou analýzu byl použit …

    brno-tech Repository record for Most nad potokem Bystrice (opens in a new tab)