Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 23 for “"staged construction"”.
-
LIGHTWEIGHT AND ADVANCE PRECAST CONCRETE SYSTEM FOR MODULAR BUILDING CONSTRUCTION
… proposes a new cruciform module design for the construction of buildings with wider column-to-column such as the Healthcare and Institutional Buildings with the use of lightweight concrete. Based on the finite element analysis (FEA) of two buildings with similar configurations and global aspect …
-
Effective Prestress Evaluation of the Varina-Enon Bridge Using a Long-Term Monitoring System and Finite Element Model
… two methods. The first utilizes a time-dependent staged-construction analysis in a finite element model of the full structure to obtain predicted prestress losses using the CEB-FIP '90 code expressions for creep and shrinkage. The second method involves collecting data from instrumentation …
-
Long-Term Monitoring and Evaluation of the Varina-Enon Bridge
… model of the bridge which run a timedependent staged-construction analysis to obtain predicted prestress losses using the CEB-FIP '90 code expressions for creep and shrinkage. The second approach involves the compilation of data from instrumentation mounted in the bridge to back calculate the …
-
Children As Researchers: Exploring Issues And Barriers In English Primary Schools
… by the children, have together informed the staged construction of a new model. This model illustrates the factors and processes that had an impact on both the children's experiences of research training and the research process and outcomes. The model demonstrates that these are inextricably …
-
Refined analysis of existing twin-tub girder bridges for system redundancy
… and demand in the intact girder under staged construction, fracture, and live load conditions. The analytical program includes detailed case studies of both simple-span and continuous-span twin-tub girder bridges, enabling direct comparison of their post-fracture behavior. Results …
-
Instrumentation and Monitoring of the Galena Creek Bridge
… These instruments monitored the structure during construction from September 2008 to December 2010. Three analytical models utilized staged construction, time-dependent behavior of concrete, and global temperature change in the structure to quantify the contribution of load, time-dependent …
-
Refined Evaluation of Effective Prestress in the Varina-Enon Bridge
… well as a finite element model which includes a staged-construction analysis. Creep and shrinkage are accounted for using the CEB-FIP '90 model code. Effective prestress in the Varina-Enon Bridge is back-calculated using live load strain data from the long-term data collection system. Previous …
-
Stress-deformation analysis of Denis-Perron dam : verification and validation for better prediction of rockfill response
… by Hydro-Qu´ebec, for a period of six years of construction, impoundment, and operation of the dam. Numerical simulations are conducted using Code Bright – a fully coupled three phase finite element program for unsaturated porous media. A validation stage was first carried out through modelling …
-
Fatigue Performance of a Hybrid CFRP/STEEL Splice Detail for Modular Bridge Expansion Joints
… to connect segments of the total joint, during staged construction. Current splice designs are either bolted or welded connections, which allow stress concentrations to induce pre-mature fatigue failure. This thesis examines the use of a hybrid FRP/steel design under fatigue loading for use as a …
-
Assessment of Deteriorated Corrugated Steel Culverts
… study the effects of corrosion, burial depth and staged construction on the capacity of deteriorated steel culverts. Then, a method to measure the remaining wall thickness of two 1.8 m diameter corroded metal culverts using ultrasonic device was developed. Both culverts were then buried in the …
-
Pause Through Shadow
… 15-kilometre-long pathway and boardwalk under staged construction, will connect multiple suburbs and recreational green spaces along the awa. This multi-sensory architecture will be located at the southern end of the park; it will bisect the pathway creating a crucial riverside pause point. Te …
-
Προχωρημένο ελαστοπλαστικό προσομοίωμα για την ανάλυση της κατασκευής και φόρτισης μεγάλων φραγμάτων λιθορριπής
… considering the nonlinear behavior of the construction materials, to ensure the structural integrity of the slab against compressive failure or tensile cracks. As the experience of the behavior of very high concrete face rockfill dams is limited, a realistic model which is verified by the …
-
Coupled mechanical and hydraulic modeling of geosynthetic-reinforced column-supported embankments
… reinforcement in 2D and 3D models, respectively. Staged construction was modeled by building the embankment in lifts. The ground water table was assumed at the ground surface. The mechanical model was coupled with the hydraulic model to simulate the generation and dissipation of excess pore water …
-
COUPLED MECHANICAL AND HYDRAULIC MODELING OF GEOSYNTHETIC-REINFORCED COLUMN-SUPPORTED EMBANKMENTS
… reinforcement in 2D and 3D models, respectively. Staged construction was modeled by building the embankment in lifts. The ground water table was assumed at the ground surface. The mechanical model was coupled with the hydraulic model to simulate the generation and dissipation of excess pore water …
-
Column-Supported Embankments: Full-Scale Tests and Design Recommendations
… principal reasons to use CSEs: 1) accelerated construction compared to more conventional construction methods such as prefabricated vertical drains (PVDs) or staged construction, and 2) protection of adjacent facilities from distress, such as settlement of existing pavements when a roadway is …
-
Techno-economic evaluation of significant CO2 emission reductions in the iron and steel industry with CCS
… the application of post-combustion capture. The staged construction and implementation of CCS in order to minimise the financial investment risk was considered and several pathways for implementation were analysed. Only transportation of CO2 by ship was considered due to the coast-line location …
-
An Implementation Analysis of the Water Resources Development Act of 1986
… transfer of the financial burden of planning, construction, and maintenance of water resource projects from the Federal government to the non-Federal sponsor/beneficiary. The transfer will be achieved by application of cost-sharing formulas contained in WRDA 86 and affirmed in subsequent …
-
Most na dálnici D1 přes silnici a potok
Cílem diplomové práce je návrh přemostění ve směru Přerov – Lipník v katastrálním území Osek nad Bečvou. Most slouží k překonání silnici III/43612 v km 93,550, potoku Lubeň a polní cesty. Ze tří variant řešení je vybrána monolitická dodatečně předpjatá dvoutrámová konstrukce a posouzena podle …
-
Most nad údolím a místním potokem
Témou diplomovej práce je návrh a posúdenie mostnej konštrukcie ponad údolie a miestny potok. Most prevádza diaľnicu D3 kategórie D26/130. Boli vypracované dva varianty. Pre podrobné spracovanie bol vybratý variant spojitého jednotrámového predpätého mosta o piatich poliach. Konštrukcia bola …
-
Seismic behaviour of hardfill dams
… Hardfill Dams (FSHD), and their behaviour during construction, impoundment, normal operation, and seismic loading. The static and dynamic analysis of dams is a complex process, which requires a thorough study of the behaviour of the materials used in the dam body. Parameters such as inhomogeneity, …
Page 1 of 2