Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 16 of 16 for “"stochastic planning"”.
-
Stochastic Planning and Operation in Energy Systems
This dissertation introduces three stochastic optimization models for different energy system planning and operation problems. All three studies address the underlying uncertainties in sequential decision-making for planning or operation problems. In Chapter 2, a chance-constrained multi-stage …
-
Approximate Dynamic Programming with Parallel Stochastic Planning Operators
… agents. The agent learns a set of parallel stochastic planning operators (P-SPOs) by evaluating changes in its environment in response to actions, using an association rule mining approach. An approximate policy is then derived by iteratively improving state value aggregation estimates …
-
Stochastic Planning of Dual-provision Power-to-hydrogen Systems
… these facilities. This thesis presents a novel stochastic planning framework for centralized dual-provision P2H systems that supply hydrogen to the transportation sector while providing ancillary services to the power grid. The framework mirrors the full project life cycle, from conceptual …
-
Stochastic Planning and Data-driven Benchmarking of Degradation-aware Operation of Campus Microgrids
… renewable energy resources (RES), making their planning and operation an active area of research and development. In this context, battery energy storage systems (BESS) are central to microgrids’ efficient and stable operation, yet they pose operational challenges considering their high capital …
-
Stochastic Tree Search for Highly Coordinated Planning
… search and rescue, and surveillance. Planning in a highly coordinated fashion causes traditional search algorithms to perform poorly as it creates combinatorial search spaces that renders exploration versus exploitation dilemma challenging as well. Recently, there has been great …
-
Parallel Machine Replacement: An Analysis in Construction Industry with Considerations of Horizon Uncertainty, Multi-Purpose Machines and Transportation
… provide new formulations of the problem. A stochastic planning horizon is considered which is in line with the direction of the research field. Likewise, multi-purpose challengers are presented to offer a solution to the current heterogeneous fleet limitations. Lastly, shipping …
-
Electricity Market Participation and Investment Planning Frameworks for Energy Storage Systems
… mix has necessitated new operational and planning studies because of the high degree of uncertainty and variability of these sources. RES such as solar photovoltaic and wind generation are not dispatchable, and when there is excess energy supply during off-peak hours, RES curtailment is …
-
High-Performance Computing and Parallel Techniques for Scalable Optimization of Power System Transition Planning
… thesis introduces the Power System Transition Planning (PSTP) framework, formalizing a problem class in long-term transition planning problems that directly embraces the computational burden of realis-tic transition modeling. Unlike conventional Generation and Transmission Expansion (GTEP) or …
-
Microgrid Enabling Towards the Implementation of Active Distribution Systems: Planning, Operation, and Energy Trading
… conventional AC DGs and loads. 2) Proposing a stochastic planning framework for the network configuration of AC-DC bilayer μGs that is capable of minimizing the total system costs through the determination of the optimal BμGconfiguration. 3) Investigating the AC-DC bilayer μGs operation under …
-
Autonomous, wireless sensor network-assisted target search and mapping
… and a maximum entropy argument, we formulate a stochastic jump process which approximates the message hop count at distance r from the source. We show that the marginal distribution of this process has a simple analytic form whose parameters can be learned by maximum likelihood estimation. …
-
On-demand coordination of multiple service robots
… from its routine duties. We formalize this stochastic sequential decision making problem, termed on-demand multi-robot coordination, as a Markov decision Process (MDP). Furthermore, we study this problem in the context of a specific on-demand task called multi-robot human guidance, where …
-
An Environmentally Conscious Robust Optimization Approach for Planning Power Generating Systems
… generation through capacity expansion planning for utility companies. In order to reduce emissions, different mitigation options are considered including structural changes and non structural changes. A drawback of existing capacity planning models is that they do not consider …
-
Optimal Deployment of Energy Storage Technologies for Grid Service Provision and Microgrid Formulation
… on electrical line impedance, followed by the stochastic planning of Distributed Energy Resources (DERs). A subsequent allocation strategy optimally places active and reactive power resources, significantly enhancing voltage regulation and reducing system losses under both islanded and …
-
Fast Generator of Network Flows
Tato diplomová práce se věnuje analýze existujících řešení pro generování síťového provozu určeného k testování síťových komponent. Zaměřuje se na generátory na úrovni IP síťových toků a pokrývá návrh a implementaci generátoru, zvaného FLOR, schopného vytvářet syntetický síťový provoz rychlostí až …
-
Optimal Planning and Operation of AC-DC Hybrid Distribution Systems
… need for reliable techniques appropriate for the planning and operation of future hybrid DSs. This thesis presents new directions for the planning and operation of AC-DC hybrid DSs. The main target of the research presented in this thesis is to optimally accommodate the expected high penetration …
-
Incorporação de incertezas provenientes da modelagem de contatos e teores no sequenciamento de médio e curto prazo
A modelagem de contatos assim como os teores do material de interesse na mineração, são dois dos principais parâmetros de entrada do planejamento de lavra. Sua abordagem exclusivamente determinística no planejamento, pode acarretar baixas aderências ao plano, e principalmente prejuízos econômicos …