Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 14 of 14 for “"sub-contractor"”.
-
The rise and fall of "Marvellous Melbourne", 1880-1895
… and journeymen were displaced by those of the sub-contractor and 'jerry-builder' ; even the professions and civil service were not immune from market pressures and constraints.
-
Resolution of Multiparty Construction Disputes Under the Singapore International Arbitration Legal Framework
… to arise out of construction main-contracts and sub-contracts. In the absence of a multiparty arbitration agreement among the main-contractor, the sub-contractor and the employer, the parties may not be easily roped into a single multiparty arbitration proceeding. Multiple proceedings may lead to …
-
Cost benefit analysis of government furnished equipment versus contract furnished equipment for the procurement and integration of the MK-44 chain gun with the United States Marine Corps Expeditionary Fighting Vehicle
… equipment (GFE) or 2) to procure the MK-44 as contractor furnished equipment (CFE). The fundamental difference is that a GFE arrangement will provide a direct contractual relationship between the Government and ATK, whereas, a CFE contract will eliminate that relationship as ATK will become a …
-
Quantification of risks during feasibility analysis for capital projects
… and materials, labour and equipment usage, sub-contractor and indirect cost, inflation and interest rates. For revenue the issues are: the gross revenue, operating & maintenance cost, inflation rates, duration, and the starting time. Moments of work package cost, duration and revenue streams …
-
Designing a fixed cost model for aftermarket at a surveillace company
… the following four aspects; products, customers, subcontractors, and in-house operations. Aim - The aim of the thesis consisted of fulfilling three parts; (1) an analysis of all costs related to establishing quotation, (2) defining a fixed cost model for Aftermarket, and (3) suggesting an …
-
Risk management in international construction joint ventures in Egypt
… level are: materials; location of the project; sub- contractor capacity. Considering these risk factors facilitates clear decision making in arranging joint ventures in Egypt. Moreover, it mitigates the potential of these risks to occur.
-
Flight testing of a remotely piloted vehicle for aircraft parameter estimation purposes
… Aerospace Engineering Department, and a private sub-contractor, Craig Aviation.
-
Construction cost estimating in project management
… other problems occuring between the Owner and Contractor. Estimating is used to determine the increase or decrease in the amount of the original contract or involve no change. Back charges - charges for materials, equipment & labor or other costs furnished to the Contractor by the Owner, to the …
-
A STUDY OF CONTRACTOR'S ATTITUDE TOWARDS INTEGRATION OF M&E WORKS IN CONSTRUCTION PROJECTS
… to put pressure on the co-ordination effort of contractor. Effective management of services contractors has become a vital task for main contractor. This dissertation adopts a system approach by viewing the building process as a system consisting of technical, organisational and managerial …
-
Exploring Digital Collaboration across Knowledge Boundaries: A Case Study of the BIM-Enabled Construction Project
… part of this objective, the study examines three sub-questions: 1) How are collaborative activities across knowledge boundaries organised in the construction project? 2) How is BIM technology implemented and used to enable these collaborative activities? 3) How does the arrangement of …
-
A Standardised Incorporated Partnering Model for the UK Construction Industry
… four key disciplines (Client, Consultant, Main Contractor and Sub-contractor). The rationale supporting this approach endeavoured to capture actors and context, such that observations and research findings could be grounded and linked back to theory generation. An explicit mixed method research …
-
The impact of CSARS v South African Custodial Services (Pty) Ltd. on the income tax position of construction contractors
… top priorities of the South African Government. Substantial amounts will be invested by the Government in infrastructure between 2014 and 2016 as good infrastructure plays a pivotal role in the growth of the South African economy. Government does not have sufficient resources to meet its …
-
Příprava stavební zakázky
Práce se zabývá přípravou stavební zakázky. V teoretické části je specifikována výrobní příprava stavební zakázky. Dále je představena stavební firma, působící na stavebním trhu, s polem působnosti převážně v Jihomoravském kraji. Praktická část se zabývá konkrétní stavební zakázkou, kde je …