Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 12 of 12 for “"temporary construction"”
-
Mental Health in Temporary Construction Workers
Construction industry is characterized as not only physically but also mentally demanding with industry specific characteristics such as heavy workload, long working hours, work-family conflicts etc. However, inadequate research has been done to address the mental health aspect of the construction …
-
Hydraulic performance of temporary construction traffic barriers
Temporary Concrete Traffic Barriers (TCTBs) are essential in order to protect the traveling public and highway construction crews from accidents due to driver misfortune or negligence. In order for TCTBs to be installed, however, they must be successfully crash tested. Barrier height and drainage …
-
Lateral Deflections and Stress Analysis of Plate Girder Webs Subjected to Horizontal Loads
… loads resulting from the bracket during construction are not considered. The object of this thesis is to establish a mathematical solution which permits the prediction of structural behavior of the web for lateral loads. The web deflection and stress which occur as a result of using …
-
A Sensor Network System for Monitoring Short-Term Construction Work Zones
<p>Safety hazards encountered near construction work zones are high, both in number and in the kind. There is a need to monitor traffic in such construction zones in order to improve driver and vehicle safety.</p><p>In the past traffic monitoring systems were built with high cost equipment such as …
-
Processo produtivo de instalações provisórias de madeira para canteiros de obras
A temporary work environment containing areas of support to the production process, such as the administrative, operational, and living areas should be foreseen and planned as support to the implementation of works. These types of facilities are very common in sites and their planning is as …
-
Trust, commitment, satisfaction and learning in construction project teams
… to investigate how elements of the dynamic and temporary team environment of construction project teams influence trust, commitment, satisfaction and learning in the teams. While much can be learnt from the current literature about teams, the theories have mainly derived and focused on teams …
-
Etudes in Making: poems of construction
… assumed that I should be making an architectural construction at the scale of building, the scale in which I then believed architecture existed. Knowing that I wanted to find a way of making where I could physically construct every thing I was to make in a careful architectural manner, I hoped …
-
Implementing Temporary LED Construction Lighting
… them in their products and everyday life, the construction industry has yet to widely adopt and embrace the technology as a temporary lighting source on their projects. Although initially expensive when compared with other construction lighting systems, the cost of LEDs is decreasing while …
-
Dočasná ocelová konstrukce letištního terminálu
Bakalářská práce se zabývá návrhem nosné ocelové konstrukce mezinárodního letištního terminálu v norském Tromsø. Předmětem řešení je hlavní rámová příhradová vazba, štítová stěna, ztužující prvky a vybrané detaily. Celá konstrukce je tvořená z uzavřených ocelových profilů čtvercového, obdélníkového …
-
Návrh fasádního lešení hradu Ledeč nad Sázavou
Tématem bakalářské práce je návrh lešeňové konstrukce pro rekonstrukci fasád hradu Ledeč nad Sázavou. Práce obsahuje tři části: Technickou zprávu pro vybranou fasádu, Zjednodušený statický výpočet pro vybranou fasádu a Výkresovou část. Technická zpráva pojednává o lešeňové konstrukci obecně, přes …
-
The consequences of the WNLA closure on Bulozi, 1966-1986
… the Kafue. Similarly, those who were employed on temporary construction projects such as at Itezhyi-tezhyi Dam at Namwala and at other projects declined to return home and opted to settle in squatter compounds and fishing camps. Their major borne of contention for not returning to the Western …
-
Análisis comparativo de costos entre módulos convencionales y módulos tipo domo para la habilitación de campamentos temporales en proyectos de construcción
El presente trabajo de investigación está enfocado en determinar la propuesta de solución que permita mitigar los altos costos de los módulos convencionales que se usan en los campamentos temporales de construcción. En este contexto, la empresa Cipresa, con veinte años de experiencia en el rubro de …