Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 8 of 8 for “"term schedule"”.
-
Production scheduling in a campaign based flexible flow shop
… to minimize the set-up and cleaning times. Long-term campaign plan is created based on a sale forecast. Short-term schedule is also created based on real orders. In this study an optimization model is presented that arranges the orders in the campaign plan. To keep the structure of the long-term …
-
Sea water air conditioning (SWAC) at Naval Base Guam: cost-beneit analysis and acquisition strategy
The purposes of this research are to determine whether it is financially feasible and attractive to install sea water air conditioning (SWAC) at Naval Base (NB) Guam, which the Naval Facilities Engineering Command currently deems to be true; to develop an acquisition strategy that NB Guam would be …
-
Littoral Combat Ship crew scheduling
… in ships already built. This thesis develops LCS Scheduler (LCSS), a mathematical optimization model using a mixed-integer, linear program (MIP) to aid in assigning LCS crews to LCS ships. LCSS’s objective is to minimize the penalty associated with assigning crews outside of their desired ship …
-
Long-term scheduling of harvesting with adjacency and trigger constraints
… between a strategic model that sets long-term harvesting goals in terms of total area to be cut each year, and a tactical model that produces a short-term schedule of actual blocks. Special attention is devoted to the development of FRI’s Forestry-Oriented Linear Programming Interpreter, …
-
Dealing With Uncertainty in Engineering and Management Practices
… based optimal rehabilitation/upgrade schedule that considering both hydraulic failure potential and mechanical failure potential. In these two approaches, all uncertain hydraulic parameters are treated as random values. The main methodologies used are: Monte Carlo simulation, EPANET …
-
A randomized trial of non-fasting vs. fasting for cardiac implantable electronic device procedures (Fast-CIED Study)
… hinder rescheduling patients in case of sudden schedule changes or new patient arrivals . Fasting is practiced before procedures due to a fear of vomiting and aspiration, and the associated aspiration pneumonia. This was first described by Curtis Lester Mendelson as the Mendelson-syndrome in …
-
Návrh technologie výroby hřídele převodovky pohonu sněhové frézy
… částí je také ekonomické vyhodnocení včetně termínového plánu. V průběhu práce je řešena volba polotovaru, řezných podmínek, obráběcích časů, kapacity strojů a návrh strojního vybavení. Z navržené technologie vyplývá, že hřídel lze obrobit ve dvou obráběcích operacích, soustružení a broušení. …
-
The Co-Operative Government in Saskatchewan, 1929 - 1934: Response to the Depression
… payment of tax arrears, providing a long term schedule for repayment. Both debt adjustment and tax consolidation deferred present obligations to allow the property owner to retain possession. The Co-operative Government's experiments in economic regulation were not successful. The Grain …