Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 5 of 5 for “"the project developer"”.

  1. Licenciamento ambiental em números: uma comparação entre as UHEs Santo Antônio, Jirau e Belo Monte

    This work presents a diagnosis of the environmental licensing procedure of the Hydropower Plants (HPPs) of Santo Antônio, Jirau and Belo Monte. Understanding the differences between how the law foresees the procedure and how it works in a practical order is relevant to not only gather data on this …

    brazil-uerj Repository record for Licenciamento ambiental em números: uma comparação entre as UHEs Santo Antônio, Jirau e Belo Monte (opens in a new tab)

  2. Sutelktinio finansavimo sėkmės veiksnių analizė pasaulinėse platformose: Kickstarter atvejis /

    As financial markets change and the concept of alternative finance becomes more widespread, more competition between banking and non-banking funding is beginning to emerge. As businesses increasingly suffer from a lack of bank financing, alternative finance, such as crowdfunding, fills the market …

    vilnius Repository record for Sutelktinio finansavimo sėkmės veiksnių analizė pasaulinėse platformose: Kickstarter atvejis / (opens in a new tab)

  3. Planning for Reuse and Redevelopment of Inner City Blighted Contaminated Industrial Sites

    … industrial sites are primarily associated with the general phenomenon of deindustrialization within the post-industrial inner city that is caused by spatial and functional restructuring of the industrial activity. Blighted industrial sites are vacant, obsolete, or underutilized industrial …

    waterloo Repository record for Planning for Reuse and Redevelopment of Inner City Blighted Contaminated Industrial Sites (opens in a new tab)

  4. Windmolens: draait alles om geld?: Onderzoek naar factoren die van invloed zijn op de ontwikkeling en het functioneren van een windfonds

    The Dutch Energy Agreement (SER, 2013) contains agreements for onshore wind energy generation. The ambition level of 6,000 megawatts of onshore wind energy in 2020 will not be achieved without applying additional measures and this is caused by limited public support (Schoots, Hekkenberg & Hammingh, …

    openu Repository record for Windmolens: draait alles om geld?: Onderzoek naar factoren die van invloed zijn op de ontwikkeling en het functioneren van een windfonds (opens in a new tab) Download PDF for Windmolens: draait alles om geld?: Onderzoek naar factoren die van invloed zijn op de ontwikkeling en het functioneren van een windfonds (opens in a new tab)

  5. Financování developerských projektů

    Diplomová práce se zabývá tématem Financování developerských projektů. První část práce pojednává o rozboru teoretických pojmů souvisejících s danou problematikou a popisuje průběh developerské činnosti a kroky developera s danou podnikatelskou aktivitou související. Druhá část práce je zaměřena na …

    brno-tech Repository record for Financování developerských projektů (opens in a new tab)