Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 14 of 14 for “"the time schedule"”.
-
Gaps between project practice and standard project management - Case study in a construction company on the time schedule and the position of project managers with regards to power relations
… on standard project management, represented by the PMBoK1 this master thesis has the goal to explore gaps between practice and standard project management. A focus is put on power relations because the influence of subtle power relations can have negative consequences for practice in project …
-
A logic approach to conflict resolution in university timetabling.
A computerized timetabling system developed at University of Ottawa is presented. The system is built on a logic programming model which uses first order logic to define first order and second order constraints in timetabling. Information about courses, professors, and student programs is collected …
-
Modeling the international competitiveness of Botswana's coal
… proven deposits of steam coal, which for a long time it has wanted to develop but without much success. The main objectives of this study are: (1) to analyze the time schedule of coal exports likely to be forthcoming from Botswana and the land routes for these exports; (2) to determine the …
-
INERZIA DELLA PUBBLICA AMMINISTRAZIONE ED EFFETTIVITÀ DELLA TUTELA DEL PRIVATO
The topic of the thesis is the protection of the private, provided by our legal system, against the inactivity and delay of public administration. Quite often indeed the public authorities don’t answer to the private requests into the time established by law. The logic premise of the thesis is in …
-
The factors that affect the implementation of enterprise resource planning (ERP) in the international Arab Gulf States and United States companies with special emphasis on SAP software
The primary purpose of this study was to investigate and determine the factors affecting the implementation of enterprise resource planning (ERP) in companies in the Arab Gulf States and the United States, using SAP software as an example. A random sample was selected of 150 companies in the Arab …
-
Development of a ship weather routing system towards energy efficient shipping
The energy consumption and the Greenhouse Gas (GHG) emissions from shipping field are vast and very important which cannot be ignored for both economic and environmental reasons. Improving energy efficiency of the ship through the technical and operational means has become a pressing issue faced by …
-
Reproductive dynamics of an exploited serranid on the Great Barrier Reef
The reproductive output of exploited tropical reef fishes is intimately linked to factors such as mating patterns, sexual selection, sex ratios and reproductive success, because they affect an individual's fecundity and hence long term productivity. This information is critical to fisheries …
-
Extension of the master sintering curve for constant heating rate modeling
The purpose of this work is to extend the functionality of the Master Sintering Curve (MSC) such that it can be used as a practical tool for predicting sintering schemes that combine both a constant heating rate and an isothermal hold. Rather than just being able to predict a final density for the …
-
Stanice Hasičského záchranného sboru Praha - příprava a realizace stavby
Tato práce se zabývá stavebně technologickou přípravou a realizací stavby stanice hasičského záchranného sboru v Praze. Struktura práce kopíruje strukturu zadání a jsou v ní obsaženy všechny body uvedené v příloze zadání
-
Metode penentuan waktu shalat di masjid-masjid Kabupaten Malang
… jadwal waktu shalat yang ada. ENGLISH: The practice of computation and sighting of moon in relation to daily worship which applied to predetermined time in a day and night prayer should not be executed any time without any reason that justified by the Personality. This practice is useful …
-
Die invloed van skofwerk op die sisteembalans binne 'n chemiese onderneming
… exists between an employer and employee, the employee's working hours will be detennined by the task, rather than the clock. "Sunset and Sunrise" was used as the main criteria for determining working hours in contracts between employers and employees dated as far back as the middle ages. …
-
Řízení stavební zakázky ve stavebním podniku
Konkurenční tlak panující na stavebním trhu, zvyšující se nároky investorů, nestabilní ekonomická a politická situace. To jsou faktory, které nutí stavební podniky k efektivnějšímu řízení a přípravě zakázek. Cílem této diplomové práce je popsat řízení zakázek teoreticky i ve zvoleném podniku a …
-
Bytové domy Lípa v Hodoníně - stavebně technologická příprava výstavby
Stavebně technologický projekt pro realizaci bytových domů Lípa v Hodoníně obsahuje technickou zprávu ,zařízení staveniště, časový a finanční plán, rozpočet, technologický předpis, kontrolní a zkušební plán, plán BOZP, plán rizik a prevence.
-
Realizace technologické etapy spodní stavby polyfunkčního domu v Uherském Hradišti
Předmětem bakalářské práce je technologický projekt hrubé spodní stavby polyfunkčního domu Hradební v Uherském Hradišti. Řešení objekt se nachází v památkové zóně a zastavěném území města. Práce se bude zabývat technologickými předpisy pro zemní práce a základové konstrukce, k těmto předpisům jsou …