Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 605 for “"time cost"”.
-
Time, cost and performance tradeoffs in project management
… of corporate resources within specifications for time, cost, and performance. We developed a model and algorithm to support decisions on these three dimensions for project managers. It combines the advantages of the Program Evaluation and Review Technique (PERT) and the Critical Path Method (CPM). …
-
The architect and time-cost factors in the construction industry
… will begin to see the total meaning of creative cost control management. He will begin to appreciate the total financial support required for project completion, rather than emphasize a relatively meaningless preoccupation with per square foot costs of construction. With that total picture, he …
-
Time-Cost Optimization of Large-Scale Construction Projects Using Constraint Programming
Optimization of time and cost in construction projects has been subject to extensive research since the development of the Critical Path Method (CPM). Many researchers have investigated various versions of the well-known Time-Cost Trade-off (TCT) problem including linear, convex, concave, and also …
-
IMPROVING A KEY PERFORMANCE INDICATOR BASED REAL TIME COST MEASUREMENT SYSTEM FOR SMART MANUFACTURING
This thesis develops an improved cost measurement system that translates key performance indicators (KPIs) into real time cost insights. A hybrid model was designed by integrating the cost-based decision support system (CBDSS) with time-driven activity-based costing (TDABC), combining the strengths …
-
The effects of banner ad size and time cost on brand attitude and click-through
Thesis (Ph. D.)--Michigan State University. Mass Media Ph. D. Program, 2001
-
Multi-objective Optimization for Heavy Earthmoving Construction Equipment Management Based on Time, Cost, and Pollutant Emissions
… activity in the construction project. The cost of earthmoving activity in the construction projects in some cases reaches about 30% of the overall cost of the project. Moreover, heavy equipment selection needs to be utilized in this activity, such as trucks and excavators. Such equipment …
-
Finding a solution for the tradeoff between time, cost and sustainability/LEED credits for new construction
… This research focuses on the tradeoff between time-cost and sustainability represented in the LEED credits (Materials and Resources in particular). The research was broken down into preliminary and validation studies, wherein the preliminary study used an exhaustive search to find the optimized …
-
An Evolutionary Stochastic Discrete Time-Cost Trade-Off Method for Repetitive and Non- Repetitive Construction Projects
… for solving the scheduling problem of discrete Time-Cost Trade-off (TCT) in an uncertain context. The method determines the elite execution mode for each project activity to optimize for minimization of the overall project’s cost and/or duration while satisfying a specified Joint Confidence …
-
Multi-criteria decision-making model to improve linear repetitive projects time-cost trade-off in uncertain environment
The Time-Cost Trade-Off (TCT) problem is essential to project scheduling. The risk in TCT is significant because of the uncertainty associated with the estimation of project cost and duration. TCT problem in Linear Repetitive Projects (LRP) is a more complicated issue because of their unique …
-
A real-time cost-effective wireless sensor network for monitoring peatlands with high spatial and temporal resolution
… but current techniques are limited by high cost and low spatial or temporal resolution. This research aims to overcome many of the limitations imposed by the current state-of-the-art environmental monitoring technologies by developing a resilient and modular multi-purpose wireless sensor …
-
Integrating the Department of Defense military services' technology development programs to improve time, cost, and technical quality parameters
… has failed to achieve schedule efficiency, cost effectiveness, and technical proficiency. To enable a successful development of these systems in particular and to prevent DoD system acquisition programs from failing to achieve the aforementioned parameters, a leveraged technology development …
-
A comparative time-cost of the preparation of carrots and biscuits, utilizing the three fuels, electricity, gas, and kerosene
Electronic Thesis or Dissertation
-
The Application Of "crashing" A Project Network To Solve The Time/cost Tradeoff In Recapitalization Of The Uh-60a Helicopter
… asked to perform "more with less" in expeditious time while attempting to balance the inevitable challenge of the time/cost tradeoff. This is especially true within the Department of Defense today in prosecuting the Global War on Terrorism both in Afghanistan and Iraq. An unprecedented and …
-
Multi-Objective Optimization for Construction Equipment Fleet Selection and Management In Highway Construction Projects Based on Time, Cost, and Quality Objectives
… truck, and motor-grader equipment to minimize time and cost objective functions. The model is also aimed to maintain the required level of quality for the targeted construction activity. The mathematical functions for the primary objectives were formulated and then a genetic algorithm-based …
-
Volitional code switching: Is there a cost?
… CS is cognitively demanding, as measured by a time cost. This study sought to identify and compare time cost in CS across two experimental paradigms: naturalistic conversation and self-paced reading. Eighteen participants of similar linguistic background (English-dominant second language …
-
Essays on the Effort Provision of People Under the Presence of Risky and Ambiguous Shocks
… where shocks occur that increase or decrease the time cost of effort that is required of them in order to complete a series of tasks. Chapter 1 examines how individuals exert effort when the possibility of a negative shock is present that will increase the time cost of effort of engaging in a …
Page 1 of 31