Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 467 for “"time schedule"”.
-
Effects of Varying the Opportunity to Attack During a Fixed-Time Schedule
Three White King pigeons were exposed to a fixed-time 120-second food delivery schedule and a live target pigeon. In order to evaluate whether induced aggression can take place in time periods other than immediately after food delivery, the target bird could be attacked (l) throughout the interfood …
-
An inquiry concerning the daily time schedule in the public secondary schools of Massachusetts
Thesis (Ed.M.)--Boston University, 1946. This item was digitized by the Internet Archive.
-
Integration of project cost estimate and project time schedule : a project breakdown structure approach
Includes bibliographical references
-
Fixed-Time Schedule Effects on Participant Responding: An Evaluation Of Similar vs. Dissimilar Schedule Programs Using a Group Design Approach
We evaluated the effectiveness of fixed-time (FT) schedules of reinforcement at eliminating participant’s responding using a between-subjects group design. Participants experienced one of three conditions; a FT leaner schedule, a FT yoked schedule, or a FT denser schedule using a computerized …
-
A comparison of reading and mathematics achievement of seventh grade students enrolled in a block time schedule and seventh grade students enrolled in a traditional schedule
The purpose of this study was to establish and describe the validity and reliability of an instrument based on a model of teaching behaviors conceived as magnetic lines of force.Content validity was established by reviewing the literature and identifying possible teaching behaviors which …
-
Gaps between project practice and standard project management - Case study in a construction company on the time schedule and the position of project managers with regards to power relations
… based are: (1) the project management tool of time schedules, (2) the power relation between project managers and subcontractors. Ten interviewees working in a Swiss general contractor were asked to reflect on the topic of hierarchy and power relations. The case study formed the basis for …
-
Factors affecting key pecking in response-independent variable-time schedules: implications for theories of the conditioning of this response
… factors affecting key pecking in variable-time schedules, where response-independent reinforcement is presented at varying intervals of time. In the first experiment, rates of responding to each color in a multiple variable-time, extinction schedule were proportional to the frequency of …
-
Short-term memory, associative learning and reading achievement of two groups of college freshmen
… of seventh grade students participating in block time scheduling compared to the achievement scores of students enrolled in traditional scheduling in two junior high schools of the Fort Wayne Community School Corporation.Seventh grade students in two junior high schools in the Fort Wayne Community …
-
Persistence of response variation and repetition
A multiple chained schedule was used to assess the persistence of fixed and variable response sequences. In one terminal link, a single 4-peck response sequence produced food (Repeat) and in the other terminal link a 4-peck response sequence produced food only if it had been occurring infrequently …
-
Part-time schedules for children in campus child care centers : a MAUT analysis of challenges faced by administrators
… This dissertation explored the concept of part-time schedules for children in campus child care centers as a challenge faced by administrators. A baseline of data was established identifying challenges associated with offering part-time schedules from an administrator's perspective and the …
-
Maternal Attitudes and Perceptions Concerning the Curriculum and Instructional Procedures in a University Preschool Program
… maternal satisfaction concerning the present time schedule and grouping of children, assessing attitudes of mothers regarding specific possible changes in preschool procedures, determining a level of involvement of mothers in the preschool program, identifying specific concerns of mothers …
-
Identifying Common Ultrasonic Predictive Failure Signatures in Bearing Elements for the Development of an Automated Condition Based Ultrasonic Monitoring Controller.
… of lubrication when needed, as opposed to a time schedule based on average performance or history. The work from this thesis will be used to help reduce equipment downtime and maintenance cost when utilized in an industrial environment.
-
Project management factors influencing success of construction projects by emerging contractors in the Mahikeng area
… successful projects are projects completed on time/schedule, within budget, covering the scope initially agreed. A mixed design research method was used in this study to collect, analyse and derive findings based on both the quantitative and qualitative research approaches. This study found …
-
Design Implementation Of A Microcontroller Based External Facility Access Control System
… system that provides exterior doors with a time schedule and allows authorized users to gain access to the facility after hours was developed. A microcontroller based system has been designed to interface with a personal computer. The system designed within this thesis can be used as a …
-
Teacher's perceptions of student preparedness and the skills necessary for success in the junior high classroom
… following directions, turning in assignments on time, developing independent work habits, respecting authority, following class rules, accepting help, following a time schedule, moving from class to class, and coping with more than one teaching style. The skills listed as presenting the greatest …
-
Organizational project management methodologies - Structures, contents, and use
… structure, cost and budget management system, time schedule management system, risk management system, and reporting, communications, and information system as the most important organizational project management methodology structures. Additionally, the findings recognize document templates, …
-
Gender Roles in the Camping Situation
… to be observed were chosen randomly. A systemic time schedule was developed in which various clusters were observed at as many different times as possible. Findings indicate that gender role behavior patterns that are used at home are also used in the camping situation. Women usually perform …
-
Immediate and Subsequent Effects of Fixed-Time Delivery of Therapist Attention on Problem Behavior Maintained by Attention
… the immediate and subsequent effects of fixed-time attention on problem behavior maintained by therapist attention utilizing a three-component multiple-schedule design. The treatment analysis indicated that fixed-time attention produced a significant immediate decrease in the frequency of …
-
The Effects of the Classroom Schedule and Teacher Beliefs on Head Start Teacher-Child Interactions
Time can be examined from several viewpoints in the early childhood classroom: wasted wait time; instruction which is undifferentiated or not on the child’s cognitivelevel, missing the child’s target learning needs; the source and control of the classroomschedule; children’s perceptions of time; …
Page 1 of 24