Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 6 of 6 for “"triple constraints"”.

  1. Application Of Modeling And Simulation To Reduce Costs Of Acquisition Within Triple Constraints

    … Cycle Management System is the reliance on the triple constraints of cost, schedule, and performance. While the use of Modeling and Simulation tools and capabilities is prevalent and well established in the Research and Development, Analysis, and Training domains, acquisition programs have been …

    ucf Repository record for Application Of Modeling And Simulation To Reduce Costs Of Acquisition Within Triple Constraints (opens in a new tab)

  2. BALANCING THE TRIPLE CONSTRAINTS AND MITIGATING RISK: AN ANALYSIS OF ALTERNATIVES FOR THE CH-53K

    The U.S. Marine Corps (USMC) faces a critical heavy-lift capability gap as the CH-53E fleet approaches the end of its operational and maintenance viability. That gap jeopardizes the heavy-lift rotary-wing capability that is essential for supporting USMC expeditionary operations. This research …

    nps Repository record for BALANCING THE TRIPLE CONSTRAINTS AND MITIGATING RISK: AN ANALYSIS OF ALTERNATIVES FOR THE CH-53K (opens in a new tab)

  3. Information Technology Project Management of the New College of Education Facility at Western Kentucky University

    … would maximize efficiency while protecting the triple constraints. Early in this paper, the author outlines assumptions, constraints, and risks that faced the IT team throughout the project cycle. Afterwards, the resulting methods and procedures used to manage the IT scope for the project are …

    wku-diss Repository record for Information Technology Project Management of the New College of Education Facility at Western Kentucky University (opens in a new tab)

  4. Impact of COVID-19 Pandemic on the Sustained Development of Infrastructure Projects: Putting Economies on the Brink

    … of integrating additional dimensions beyond the triple constraints of time, cost, and scope in defining project success, emphasising the achievement of overall strategic objectives. Adopting a multifaceted research methodology, this thesis is based on an inductive research approach that includes …

    adelaide Repository record for Impact of COVID-19 Pandemic on the Sustained Development of Infrastructure Projects: Putting Economies on the Brink (opens in a new tab)

  5. Návrh projektu implementace informačního systému

    Bakalářská práce se zaměřuje na využiti nástrojů a metod projektového managmentu, zejména pro strukturované plánování a návrh projektu implementace informačního systému v dceřiném závodě vybrané společnosti. Práce kombinuje teoretické principy projektového řízení s praktickou případovou studií za …

    brno-tech Repository record for Návrh projektu implementace informačního systému (opens in a new tab)

  6. Multiple stakeholders’ perception of the long-term success of project: a critical study of Oman tourism resort projects.

    … evaluation using the ‘iron triangle' or the triple constraints of cost, time and scope is not reflecting the actual project status (de Oliveira and Rabechini Jr 2019). Some projects have not met the criteria, although they are still considered a success, and the opposite is those projects …

    bournemouth Download PDF for Multiple stakeholders’ perception of the long-term success of project: a critical study of Oman tourism resort projects. (opens in a new tab)