Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 54 for “"truss bridge"”.
-
System Redundancy Evaluation for Steel Truss Bridge
In current bridge practice, all tension members in a truss bridge are identified as fracture critical members which implies that a collapse is expected to occur once a member of this type fails. However, there are several examples which show that bridges have remained standing and shown little …
-
An analysis of a Baltimore truss bridge
Thesis (B.S.)--Michigan State College of Agriculture and Applied Science, 1943
-
Analysis, testing, and load rating of historic steel truss bridge decks
Currently, there are several hundred older metal truss bridges that remain in vehicular service in the state of Texas, many in the range of 70 to over 100 years in age. A number of these bridges are of historical interest due to their age or other unique features. Maintaining a historic truss …
-
Analytical and experimental assessment of steel truss bridge gusset plate connections
The I-35W Bridge over the Mississippi River in Minneapolis, MN had a catastrophic failure in the main span of the deck truss in 2007. This collapse has brought significant attention on the gusset plate connections in steel truss bridges throughout the U.S. Steel truss bridge gusset plate design has …
-
Model Validation for a Steel Deck Truss Bridge over the New River
… the methods utilized to model a steel deck truss bridge over the New River in Hillsville, Virginia. These methods were evaluated by comparing analytical results with data recorded from 14 members during live load testing. The research presented herein is part of a larger endeavor to …
-
Functionality of a Damaged Steel Truss Bridge Strengthened with Post-Tensioned CFRP Tendons
… program investigates the performance of a steel truss bridge when subjected to both localized web damage and a subsequent post-tensioned strengthening approach. The investigation utilizes a combined approach involving an experimental scale model bridge and a numerical computer model generated …
-
Dynamic Testing for a Steel Truss Bridge for the Long Term Bridge Performance Program
… the Federal Highway Administration the Long Term Bridge Performance Program (LTBP) selected Minnesota Bridge number 5718 as a pilot bridge for evaluation. This program focuses on the monitoring of bridges for a 20-year period to understand the structural behavior over time due to the various loads …
-
Parallel Jacobi Transformation Algorithm for Generalized Eigen-Solution With Improved Damage Detection of Truss/Bridge-Type Structures
… rule of thumb for damage detection of aging bridge structures also give better results than existing algorithms.
-
Static and Fatigue Behaviour of Hybrid Precast Concrete Truss Bridge Girders with Connections Reinforced with Single-Headed Bars
… performance of a novel hybrid precast concrete truss bridge girder proposed by Elbadry (2002) is experimentally investigated in this research. This new corrosion-resistant structural system benefits from the best characteristics of both fibre reinforced polymers (FRPs) and concrete combined in a …
-
Live-Load Testing and Finite-Element Analysis of a Steel Cantilevered Deck Arched Pratt Truss Bridge for the Long-Term Bridge Performance Program
The Long Term Bridge Performance (LTBP) program is an organization within the Federal Highway Administration that inspects, tests, analyzes, and observes, for an extended period of time, a variety of bridge types throughout the United States. Part of the program includes periodic testing of select …
-
The design of a parallel chord through-truss bridge over the Cass river on road M-13, two miles S. of Saginaw city limits
Thesis (B.S.)--Michigan State College of Agriculture and Applied Science, 1944
-
Alternate Load Paths and Retrofits for Long-span Truss Bridges under Sudden Member Loss and Blast Loads
In current bridge design practices, due to the existence of alternate load paths (ALPs), continued stability and progressive collapse-resistance of long-span bridges following the initialed loss of a critical member can be attributed to “redundancy”. However, “redundancy”, also indicated as the …
-
Structural Health Monitoring Strategies Using Traditional Sensors and Computer Vision
… structures: a 6-story building and a single-span truss bridge. The third strategy relies on the use of computer vision in damage identification by means of the Damage Locating Vector (DLV) method. This study also investigated the impact of using aliased modes in damage identification. The …
-
A construção da ponte metálica sobre o Rio Potengi: aspectos históricos, construtivos e de durabilidade - Natal/RN, Brasil (1912-1916) - estudo de caso
… study that reports the construction of metal truss bridge in the river Potengi in Natal, Rio Grande do Norte, between the years 1912 and 1916. From testimonials on steel bridges in Brazil and worldwide including foundations. Documentary research from procurement of projects and contracts was …
Page 1 of 3