Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 18 of 18 for “"two phase heuristic"”

  1. A new two-phase heuristic for two-dimensional rectangular bin-packing and strip-packing /

    This item was digitized as part of a project to share McGill's intellectual legacy with the public. If you are the copyright holder or a relative of the copyright holder who is deceased, you may request withdrawal by emailing escholarship.library@mcgill.ca. The full policy for eScholarship may be …

    mcgill Repository record for A new two-phase heuristic for two-dimensional rectangular bin-packing and strip-packing / (opens in a new tab)

  2. MULTI-DEPOT AND MULTI-SCHOOL BUS SCHEDULING PROBLEM WITH SCHOOL BELL TIME OPTIMIZATION

    … methods, including one exact method and three heuristic methods, to solve the Multi-depot and Multi-school Bus Scheduling Problem with School Bell Time Optimization (MDSBSPTW). Besides, they can also solve the Single-depot Multi-school Bus Scheduling Problem with School Bell Time Optimization …

    maryland Repository record for MULTI-DEPOT AND MULTI-SCHOOL BUS SCHEDULING PROBLEM WITH SCHOOL BELL TIME OPTIMIZATION (opens in a new tab)

  3. Improved formulations, heuristics and metaheuristics for the dynamic demand coordinated lot-sizing problem

    … problem formulations, one or more construction heuristics, and a simulated annealing metaheuristic (SAM). We first propose new tight mathematical formulations for the uncapacitated problem and document their improved computational efficiency over earlier models. We then develop two forward-pass …

    tamu Repository record for Improved formulations, heuristics and metaheuristics for the dynamic demand coordinated lot-sizing problem (opens in a new tab)

  4. Integrated supply chain: multi products location routing problem integrated with inventory under stochastic demand

    When two logistical decisions of the supply chain namely location (a strategic decision) and routing (a tactical decision) are combined, the location- routing problem (LRP) is formed. LRP deals with simultaneously locating one or more supply facility among a set (or sets) of potential facilities …

    wichita-thes Repository record for Integrated supply chain: multi products location routing problem integrated with inventory under stochastic demand (opens in a new tab)

  5. A heuristic method for scheduling and dispatching of factory production using multiclass fluid networks

    This dissertation describes a two-phase heuristic method for scheduling and dispatching production in a factory. In the first phase, the production flow is modeled as a multiclass fluid network. This fluid queueing model is a relaxation of the deterministic factory scheduling problem (in addition …

    texas Repository record for A heuristic method for scheduling and dispatching of factory production using multiclass fluid networks (opens in a new tab)

  6. Mobility Allowance Shuttle Transit with Dynamic Checkpoint: A Clustering and Routing Strategy with Pricing Model

    … Therefore, we propose a sequential iterative two-phase heuristic model that first clusters to minimize passengers’ walking distance and routes second to minimize vehicle distance traveled between checkpoints. The clustering is performed using the memetic differential evolution (MDE)-based …

    tamu Repository record for Mobility Allowance Shuttle Transit with Dynamic Checkpoint: A Clustering and Routing Strategy with Pricing Model (opens in a new tab)

  7. Amusement park visitor routes design and optimization

    … up with a literature study and a guest survey. A two phase heuristic is developed to solve this problem with constraints. Candidate routes are generated with a route construction algorithm in the first phase. Visitor distribution and selection on these candidate routes are determined in the second …

    texas Repository record for Amusement park visitor routes design and optimization (opens in a new tab)

  8. A heuristic approach to supply chain network design in a multi-commodity four-echelon logistics system

    In this thesis we propose a heuristic method for the Supply Chain Network Design (SCND) problem considering several aspects of practical relevance: suppliers and raw materials, location and operation facilities, distribution center (DC) assignments, and large numbers of customers and products. An …

    brazil-ufrgs Repository record for A heuristic approach to supply chain network design in a multi-commodity four-echelon logistics system (opens in a new tab)

  9. Models and solution approaches for integrated student to school assignment and school bus routing problem focusing on special needs students

    … This will increase the number of nodes in the network and therefore introduces additional complexities to the problems of assignment and routing for students. An integrated single objective mathematical model is first developed that simultaneously assigns the students to schools based on their …

    wvu Repository record for Models and solution approaches for integrated student to school assignment and school bus routing problem focusing on special needs students (opens in a new tab)

  10. Electric Power Distribution Expansion Planning Using Distributed Generation Sources and Storages

    … In this research, a new integrated time-phased problem is considered, where demand changes through the planning horizon and distributed generation sources and energy storages are integrated into the planning process. The growth of power demand in consecutive periods may require an upgrade …

    wvu Repository record for Electric Power Distribution Expansion Planning Using Distributed Generation Sources and Storages (opens in a new tab)

  11. Solution Methods for Multi-Depot Multi-Product Vehicle Routing Problem with Time Windows

    … formulation into a routing master problem and two feasibility subproblems: one for load, product-flow, and inventory feasibility, and another for time-window feasibility. The exact framework is strengthened with problem-specific valid inequalities and reduced-cost fixing strategy. For larger …

    texas-state Repository record for Solution Methods for Multi-Depot Multi-Product Vehicle Routing Problem with Time Windows (opens in a new tab)

  12. Optimal assignment of ferry fleet for waterborne transportation

    … comprehensive and efficient road and rail networks, and the expansion of land-based public transport, ferry patronage has declined steadily.</p><p>The government, on the one hand, plays an important role to facilitate the creation of a financially feasible operation environment (operator …

    hkust Repository record for Optimal assignment of ferry fleet for waterborne transportation (opens in a new tab)

  13. Design And Synthesis Of Clockless Pipelines Based On Self-resetting Stage Logic

    … by the digital design community requires two ingredients: (i) a unified design methodology supported by widely available CAD tools, and (ii) a granularity of design techniques suitable for synthesizing large designs. Currently, there is no unified established design methodology to support …

    ucf Repository record for Design And Synthesis Of Clockless Pipelines Based On Self-resetting Stage Logic (opens in a new tab)

  14. Disassembly scheduling : models and algorithms

    … problems in assembly systems. We consider two versions of disassembly scheduling: the uncapacitated and capacitated version. For the uncapacitated version of the problem, three cases are considered: the two-level disassembly; the multi-level disassembly; and the multiple product types with …

    epfl Repository record for Disassembly scheduling : models and algorithms (opens in a new tab)

  15. A Study on Routing and Scheduling of Hazardous Materials in Railway Transportation

    … to solve realistic size problem instances, a heuristic method is proposed by decomposing the problem into freight-to-block and block-to-train assignment problems. We then investigate more realistic hazardous materials trip plan problems by relaxing some of the assumptions. In the second part …

    concordia

  16. Truck scheduling optimization in the logistics of crossdocking

    … real size problem instances, sub-optimal (heuristic) algorithms are developed alternatively. The first step addresses the feasibility of the truck scheduling problem by proposing a two-phase heuristic algorithm where in the first phase, a dependency ranking search (DRS) heuristic is …

    nanyang Repository record for Truck scheduling optimization in the logistics of crossdocking (opens in a new tab)

  17. Pickup and delivery problems with side constraints

    … of research exits on both exact algorithms and heuristics for generic variations of the problem as well as real-life applications, which continue to spark new challenges and open up new opportunities for researchers. In this dissertation, we study two variations of pickup and delivery problem …

    texas Repository record for Pickup and delivery problems with side constraints (opens in a new tab)

  18. Models and Algorithms for Location-Routing and Related Problems

    … model this problem we resort to an auxiliary network that allows us to represent feasible solutions as families of paths satisfying a series of side constraints.<br/>The solutions of a reinforced LP relaxation of this model are used as the basis of a rounding heuristic designed to build feasible …

    barcelona Repository record for Models and Algorithms for Location-Routing and Related Problems (opens in a new tab)