  1. Optimizing the ultimate pit

    Includes bibliographical references.

    colo-mines Repository record for Optimizing the ultimate pit (opens in a new tab)

  2. Modified tree graph algorithm for ultimate pit limit analysis

    Includes bibliographical references.

    colo-mines Repository record for Modified tree graph algorithm for ultimate pit limit analysis (opens in a new tab)

  3. Computer design of ultimate pit limit using transportation algorithm, A

    Includes bibliographical references (pages 93-96).

    colo-mines Repository record for Computer design of ultimate pit limit using transportation algorithm, A (opens in a new tab)

  4. Open-pit mine planning with operational constraints

    Open-pit mines must be designed to develop the Earth’s natural resources in the most responsible, sustainable, and economic way. Traditional mine planning optimization methods do not consider operational constraints; such as minimum mining width or minimum pushback width constraints, and often do …

    colo-mines Repository record for Open-pit mine planning with operational constraints (opens in a new tab)

  5. Algorithms for optimum design and planning of open-pit mines.

    A graph theory oriented algorithm for optimal ultimate pit limit design is developed. Mathematical proofs of optimality and convergence are given. The algorithm works on a 3-D block mine model and formulates the model into a directed graph consisting many trees. The vertices in the graph are …

    arizona-thes Repository record for Algorithms for optimum design and planning of open-pit mines. (opens in a new tab)

  6. A Critical Review of the Inputs to Long Range Mine Planning of Open Pit Porphyry Type Copper Deposits

    … research is to understand and document the open pit long range planning process in current use by mining operations, isolate the input parameters that feed into this process, and conduct a critical review of these parameters in an effort to develop a more robust plan. The thesis also searches for …

    queens Repository record for A Critical Review of the Inputs to Long Range Mine Planning of Open Pit Porphyry Type Copper Deposits (opens in a new tab)

  7. Uncertainty-based mine planning framework for oil sands production scheduling and waste management

    In open pit mining, the most significant challenge is determining the optimum long-term production schedules that maximize the project value by providing ore to the processing plant at full capacity while satisfying all required constraints. For oil sands strategic mine planning and waste …

    laurentian Repository record for Uncertainty-based mine planning framework for oil sands production scheduling and waste management (opens in a new tab)

  8. Advanced predictive methods applied to geometallurgical modelling

    … accounting for geological uncertainty into ultimate pit definition is proposed as a heuristic ultimate pit policy. We demonstrate the potential of optimizing a risk policy by propagating data and uncertainty from resources to reserves. Economic risk-based policies are obtained by computing …

    queens Repository record for Advanced predictive methods applied to geometallurgical modelling (opens in a new tab)

  9. Strategies for automating open pit mine haulage planning

    "The traditional approach to open pit mine planning has consisted of an iterative process of economic modeling, pit limit determination, pushback design and production scheduling. Even though truck haulage costs typically account for one-third to one-half of a mine’s total mining cost, the …

    must-thes Repository record for Strategies for automating open pit mine haulage planning (opens in a new tab)

  10. Comparative analysis of 3D domain modelling alternatives: implications for mineral resource estimates

    … form of range of outcomes for the extends of the ultimate pit, ore tonnages (min:37.0 Mt, max: 46.7Mt), waste tonnages (min:201.2 Mt, max: 251.2 Mt), stripping ratios (min:5.18, max: 5.71), and total pit values (min: $1.05B, max: $1.45B). The study showed that indicator kriging and simulation …

    colo-mines Repository record for Comparative analysis of 3D domain modelling alternatives: implications for mineral resource estimates (opens in a new tab)

  11. Computer-aided optimal open pit design with variable slope angles

    The use of open pit mining has increased to extract large and low grade deposits with the growth in demand for raw materials, with the advances in mining technology and with the depletion of high grade and readily accessible orebodies. Development and extraction of minerals by this method is a …

    whiterose Download PDF for Computer-aided optimal open pit design with variable slope angles (opens in a new tab)

  12. Production schedule optimization using linear programming concept in Minesight 3D for a multi-pit coal mine in Indonesia

    … maximize the net present value (NPV) of an open-pit coal mine project. The entire modeling and simulation process of this study uses commercial mine planning software MineSight 3D from Hexagon Mining. In an open-pit coal mine, instead of modeling the deposit using a gridded seam file which …

    colo-mines Repository record for Production schedule optimization using linear programming concept in Minesight 3D for a multi-pit coal mine in Indonesia (opens in a new tab)

  13. RISK QUANTIFICATION IN PRODUCTION PHASE-DESIGN BY CONSIDERING PRICE, VOLUME, AND CALORIFIC VALUE: AN APPLICATION FROM INDONESIAN COAL MINE

    The optimization of open pit mine design under uncertain factors is one of the most crucial and challenging jobs in the mine planning and design process. Complex geological structures escalate the difficulty of resource estimation and thus the mine planning. The volatility of the market (i.e. price …

    mtu Repository record for RISK QUANTIFICATION IN PRODUCTION PHASE-DESIGN BY CONSIDERING PRICE, VOLUME, AND CALORIFIC VALUE: AN APPLICATION FROM INDONESIAN COAL MINE (opens in a new tab)

  14. Programação por restrições aplicada ao agrupamento de blocos no planejamento de lavra

    … como a definição prévia de uma cava final (ultimate pit problem) e a subdivisão do problema do sequenciamento sob as ópticas do longo, médio e curto prazo, que apresentam suas próprias particularidades, objetivos e restrições. Outra maneira de simplificar este problema é o agrupamento …

    brazil-ufrgs Repository record for Programação por restrições aplicada ao agrupamento de blocos no planejamento de lavra (opens in a new tab)

  15. Desenvolvimento e comparação de algoritmos de otimização de cava a céu aberto

    Essa dissertação está voltada para análises e desenvolvimentos dos processos de otimização de cavas a céu aberto e tem por objetivo a descrição e comparação de cinco métodos de otimização aplicados à definição da cava ótima (Cones Flutuantes, Korobov, Lerchs Grossmann, Programação Inteira 0-1 e …

    brazil-ufrgs Repository record for Desenvolvimento e comparação de algoritmos de otimização de cava a céu aberto (opens in a new tab)

  16. EVALUATING GEOMECHANICAL UNCERTAINTY IN OPEN PIT MINE PLANNING

    Open pit mine planning encompasses a variety of uncertainties. Uncertainty due to geomechanics is most critical for a safe operation in an open pit mine. Without sufficient knowledge of the geomechanical properties of the subsurface, a reliability analysis of the slope stability could be …

    mtu Repository record for EVALUATING GEOMECHANICAL UNCERTAINTY IN OPEN PIT MINE PLANNING (opens in a new tab)