Optimizing the ultimate pit
Includes bibliographical references.
-
Modified tree graph algorithm for ultimate pit limit analysis
Includes bibliographical references.
-
Computer design of ultimate pit limit using transportation algorithm, A
Includes bibliographical references (pages 93-96).
-
Algorithm for solving the ultimate pit problem with spatial consideration and a parallel implementation, An
Includes bibliographical references (pages 149-153).
-
Open-pit mine planning with operational constraints
Open-pit mines must be designed to develop the Earth’s natural resources in the most responsible, sustainable, and economic way. Traditional mine planning optimization methods do not consider operational constraints; such as minimum mining width or minimum pushback width constraints, and often do …
-
Algorithms for optimum design and planning of open-pit mines.
A graph theory oriented algorithm for optimal ultimate pit limit design is developed. Mathematical proofs of optimality and convergence are given. The algorithm works on a 3-D block mine model and formulates the model into a directed graph consisting many trees. The vertices in the graph are …
-
A Critical Review of the Inputs to Long Range Mine Planning of Open Pit Porphyry Type Copper Deposits
… research is to understand and document the open pit long range planning process in current use by mining operations, isolate the input parameters that feed into this process, and conduct a critical review of these parameters in an effort to develop a more robust plan. The thesis also searches for …
-
Uncertainty-based mine planning framework for oil sands production scheduling and waste management
In open pit mining, the most significant challenge is determining the optimum long-term production schedules that maximize the project value by providing ore to the processing plant at full capacity while satisfying all required constraints. For oil sands strategic mine planning and waste …
-
Advanced predictive methods applied to geometallurgical modelling
… accounting for geological uncertainty into ultimate pit definition is proposed as a heuristic ultimate pit policy. We demonstrate the potential of optimizing a risk policy by propagating data and uncertainty from resources to reserves. Economic risk-based policies are obtained by computing …
-
JOINT SIMULATION OF CONTINUOUS AND CATEGORICAL VARIABLES FOR MINERAL RESOURCE MODELING AND RECOVERABLE RESERVES CALCULATION
… Resource classification of simulations and ultimate pit limit calculations are produced and validated using a real gold deposit in Alaska.
-
Strategies for automating open pit mine haulage planning
"The traditional approach to open pit mine planning has consisted of an iterative process of economic modeling, pit limit determination, pushback design and production scheduling. Even though truck haulage costs typically account for one-third to one-half of a mine’s total mining cost, the …
-
Comparative analysis of 3D domain modelling alternatives: implications for mineral resource estimates
… form of range of outcomes for the extends of the ultimate pit, ore tonnages (min:37.0 Mt, max: 46.7Mt), waste tonnages (min:201.2 Mt, max: 251.2 Mt), stripping ratios (min:5.18, max: 5.71), and total pit values (min: $1.05B, max: $1.45B). The study showed that indicator kriging and simulation …
-
Computer-aided optimal open pit design with variable slope angles
The use of open pit mining has increased to extract large and low grade deposits with the growth in demand for raw materials, with the advances in mining technology and with the depletion of high grade and readily accessible orebodies. Development and extraction of minerals by this method is a …
-
Production schedule optimization using linear programming concept in Minesight 3D for a multi-pit coal mine in Indonesia
… maximize the net present value (NPV) of an open-pit coal mine project. The entire modeling and simulation process of this study uses commercial mine planning software MineSight 3D from Hexagon Mining. In an open-pit coal mine, instead of modeling the deposit using a gridded seam file which …
-
RISK QUANTIFICATION IN PRODUCTION PHASE-DESIGN BY CONSIDERING PRICE, VOLUME, AND CALORIFIC VALUE: AN APPLICATION FROM INDONESIAN COAL MINE
The optimization of open pit mine design under uncertain factors is one of the most crucial and challenging jobs in the mine planning and design process. Complex geological structures escalate the difficulty of resource estimation and thus the mine planning. The volatility of the market (i.e. price …
-
Programação por restrições aplicada ao agrupamento de blocos no planejamento de lavra
… como a definição prévia de uma cava final (ultimate pit problem) e a subdivisão do problema do sequenciamento sob as ópticas do longo, médio e curto prazo, que apresentam suas próprias particularidades, objetivos e restrições. Outra maneira de simplificar este problema é o agrupamento …
-
Desenvolvimento e comparação de algoritmos de otimização de cava a céu aberto
Essa dissertação está voltada para análises e desenvolvimentos dos processos de otimização de cavas a céu aberto e tem por objetivo a descrição e comparação de cinco métodos de otimização aplicados à definição da cava ótima (Cones Flutuantes, Korobov, Lerchs Grossmann, Programação Inteira 0-1 e …
-
EVALUATING GEOMECHANICAL UNCERTAINTY IN OPEN PIT MINE PLANNING
Open pit mine planning encompasses a variety of uncertainties. Uncertainty due to geomechanics is most critical for a safe operation in an open pit mine. Without sufficient knowledge of the geomechanical properties of the subsurface, a reliability analysis of the slope stability could be …