Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 1 of 1 for “"unbonded construction"”.
-
Transient High-Temperature Prestress Relaxation of Unbonded Prestressing Tendons for use in Concrete Slabs
Unbonded post-tensioned (UPT) flat plate concrete slabs have seen widespread use in multi-storey office and condominium buildings since the 1960s. The popularity of these systems can be attributed to various economic and structural benefits, including reductions in slab thickness, storey height, …