Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 5 of 5 for “"utility cut"”.
-
Utility cut repair techniques: investigation of improved utility cut repair techniques to reduce settlement in repaired areas, Phase II
… that aims to improve long-term performance of utility cut restoration trenches. The goal of this research is to improve pavement patch life and reduce the maintenance of the repaired areas. The objectives were to use field-testing data, laboratory testing data, and long-term monitoring …
-
Investigation of improved utility cut repair techniques to reduce settlement in repaired areas
<p>Pavement settlement occurring in and around utility cuts is a common problem that draws significant resources for maintenance. Recently, a survey as well as field and laboratory investigations were carried out to identify the factors that contribute to the settlement of utility cut restorations …
-
Pavement Deterioration and PE Pipe Behaviour Resulting from Open-Cut and HDD Pipeline Installation Techniques
The damaging impact of continuous utility cuts on flexible pavement performance has been shown to be a major problem for urban roads and pavement mangers due to high reconstruction and maintenance costs. Horizontal Directional Drilling (HDD) is a trenchless construction method that does not require …
-
Evaluating The Nccn Clinical Criteria For Hereditary Breast and Ovarian Cancer Syndrome Genetic Testing
… CI), which is significantly below the clinical utility cut-off of 10% (p = 0.001). Additionally, 0 out of 37 individuals who underwent testing based on the criterion, “diagnosed with breast cancer at any age with ≥2 close blood relatives with breast cancer at any age” tested positive (0-9%, 95% …
-
A tool to evaluate sustainability of pavement maintenance projects.
… as case studies, including rejuvenation, utility cut restoration (UCR), overlay, as well as mill and overlay. The projects selected were located in or adjacent to Louisville, KY. Among the nine projects being evaluated by PSIM framework, UCR projects were not sustainable; rejuvenation …