Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 20 of 34 for “"work center"”

  1. A work center for the home

    … research, design development, and proposal for a work center for the home. Consideration is given to the special needs of the home worker, the design process, and product semantics. Included are illustrations of the visual development of the design and the preliminary design proposal. Criticism of …

    rit Repository record for A work center for the home (opens in a new tab)

  2. Utilities cost comparison analysis between a public work center and the non-DoD sector

    … and water utility services between Navy Public Works Center San Francisco Bay and three local non-Department of Defense public and private enterprises. The research focused primarily on procurement costs and the direct costs of distribution for fiscal years 89. 90 and 91. The latter costs …

    nps Repository record for Utilities cost comparison analysis between a public work center and the non-DoD sector (opens in a new tab)

  3. The design of a low-cost, knock-down drafting work center based on human factors data and anthropometric measurements

    … was to design a low-cost, knock-down drafting work center for the interior design student using anthropometric measurements and human factors data. Information for this study was gathered from books, journals, charts and from an observational study and a questionnaire survey conducted by the …

    ut-knoxville Repository record for The design of a low-cost, knock-down drafting work center based on human factors data and anthropometric measurements (opens in a new tab)

  4. Increased production capabilities by job rotation through simulation.

    … of labor cost, operator satisfaction, and Work-related Musculoskeletal Disorders (WMSDs) reduction. In this thesis, the steps of simulating the change from a single station operator work center to a job rotational work center in an automotive components production facility are investigated, …

    louisville Repository record for Increased production capabilities by job rotation through simulation. (opens in a new tab)

  5. A methodology that integrates the scheduling of job sequencing and AGV dispatching in a FMS

    … system consisting of several automated work centers interconnected by an automated material handling system. An integrated scheduling methodology is required to schedule all FMS sub-systems. The overall objective of this research was to develop a scheduling methodology to integrate job …

    vt Repository record for A methodology that integrates the scheduling of job sequencing and AGV dispatching in a FMS (opens in a new tab)

  6. Multi-routed job shop scheduling

    … is concerned with scheduling n jobs in an m work center job shop facility. The objective in this research was to develop scheduling methodologies which optimally or sub-optimally schedule n jobs on m work centers in a job shop or a Flexible Manufacturing System (FMS) environment, where the …

    vt Repository record for Multi-routed job shop scheduling (opens in a new tab)

  7. The operating impact of increased parts commonality on a manufacturing firm using MRP.

    … are disaggregated and allocated to separate work centers. The manufacturing performance measures used, such as average processing time and standard deviation of processing time, focus on capacity requirements. A new measure, system disruption, is introduced. This measure focuses attention on …

    arizona-thes Repository record for The operating impact of increased parts commonality on a manufacturing firm using MRP. (opens in a new tab)

  8. Heuristics for flexible flowshop scheduling problems

    A flexible flowshop consists of a number of work centers, each having one or more parallel machines. A set of immediately available jobs has to be processed through the ordered work centers. A job is processed on any and only one of the parallel machines at each of the work centers?) Structurally, …

    ttu Repository record for Heuristics for flexible flowshop scheduling problems (opens in a new tab)

  9. Capacity Planning in a Discrete Item Manufacturing Environment

    … horizon) to simulate the behavior of the shop work centers along the planning horizon. The process involves loading (accumulating) the various elements of each order in its pertinent work center using a specified loading rule (currently it uses forward and backward loading). The system uses the …

    ucf Repository record for Capacity Planning in a Discrete Item Manufacturing Environment (opens in a new tab)

  10. Capacity planning under fuzzy environment

    … flexibility of the amount and timing of work center capacity to satisfy the master production schedule. There are several techniques available for preparing work center capacity plans under crisp environment, but there is a scarcity of technique available for finding the required capacity …

    manitoba Repository record for Capacity planning under fuzzy environment (opens in a new tab)

  11. Study on planning logics and adexa system integration for an oilfield service company

    … trial runs is conducted. The loading for each work center in this department is calculated, followed by an investigation into the reasons for the overloading work centers. Then, appropriate counter measures are proposed and implemented to ensure all the settings in Adexa is correct and …

    nanyang Repository record for Study on planning logics and adexa system integration for an oilfield service company (opens in a new tab)

  12. An analysis of maintenance factors on selected U.S. Navy ships.

    … Though part of the data was broken down to work center level, this research did not go below the ship level. This study showed 1) how the accomplishment of preventive maintenance varied as additional maintenance requirements were scheduled; 2) how the accomplishment of preventive versus …

    nps Repository record for An analysis of maintenance factors on selected U.S. Navy ships. (opens in a new tab)

  13. Capacity control policies in a material requirements planning production environment

    … of the queue, as measured in standard hours of work, at each work center in the production system. Several classes of product mixes and product structures are investigated, as well as several levels of the control parameters of each control policy. The results indicate that each control policy …

    vt Repository record for Capacity control policies in a material requirements planning production environment (opens in a new tab)

  14. Computerized Flow Process Charting System and Applications

    … Systems. These additional variables include work center identification, machine number identification, lot sizes, set up and run times and manufacturing specifications. Additionally, the circle or operations symbol has been expanded to differentiate between manual, process and test …

    ucf Repository record for Computerized Flow Process Charting System and Applications (opens in a new tab)

  15. Uiterwaardenvolle steenfabrieken: herbestemming steenfabriek Heuff

    Former brickworks Heuff is reallocated as a ceramic work center and showcase for the latest technologies in Ceramics and Architecture. The main factor in the design is the addition of a new roof. To express this new feature a complex free-form shell structure in brick is designed. Brick by its …

    eindhoven Repository record for Uiterwaardenvolle steenfabrieken: herbestemming steenfabriek Heuff (opens in a new tab)

  16. Requisition throughout time simulation at Naval Supply Center San Diego

    … to enable NSC San Diego to determine those work stations which are bottlenecks and to view the effects of changes in total throughput time caused by changes in manpower resources and administrative procedures. Output from the computer simulation model includes an analysis of throughput time …

    nps Repository record for Requisition throughout time simulation at Naval Supply Center San Diego (opens in a new tab)

  17. Capacitated scheduling in multistage production systems

    … minimizes inventory holding cost subject to work center capacity constraints.</p> <p>The problem is formulated as a large, but highly structured linear program.</p> <p>A Dantzig-Wolfe decomposition algorithm is developed to solve the model. The capacity constraints of the model are used to …

    utk-theses Repository record for Capacitated scheduling in multistage production systems (opens in a new tab)

  18. A linear programming approach to quaity improvement project and product mix selection under inspection error and rework

    … selection in a manufacturing environment where rework and inspection errors exist is examined. It is assumed that the products (items) for which rework is necessary are reprocessed at a separate work center and 100% inspection is performed for the products both after rework and processing …

    metu Repository record for A linear programming approach to quaity improvement project and product mix selection under inspection error and rework (opens in a new tab)

  19. Analysis of the Preventive/Corrective Maintenance Ratio for DDG class ships

    … to a request by the Navy Manpower Analysis Center. The research examined the Preventive Maintenance to Corrective Maintenance Ratio (PM:CM) as part of the Ship Manpower Document (SMD) requirements development process. Established in 1968, the PM:CM ratio has never been revised. Previous …

    nps Repository record for Analysis of the Preventive/Corrective Maintenance Ratio for DDG class ships (opens in a new tab)

Page 1 of 2